• Dienstag, 13 August 2024
  • 01:37 Uhr Frankfurt
  • 00:37 Uhr London
  • 19:37 Uhr New York
  • 19:37 Uhr Toronto
  • 16:37 Uhr Vancouver
  • 09:37 Uhr Sydney
Unternehmensmeldungen, engl.
Unternehmensmeldungen, engl.

  • Fuse Battery Metals announces that further it its news release dated May 1, 2024, the Company is proceeding with a consolidation of its common shares on the bases of 1 new post-consolidated share for every 5 pre-consolidated shares. The consolidation was approved by the Company's board of directors on May 7, 2024. Following the completion of the 5:1 consolidation, the Company will have 37,589,760 shares issued and outstanding. The Company believes that the Consolidation will increase its flexibility and competitiveness in the marketplace and make the Fuse's securities more attractive to a wider audience of potential investors, thereby resulting in a more efficient market for the Shares. The Company will not be issuing fractional shares as a result of the consolidation. I...
    30.05.2024
  • Grid Battery Metals Inc. announces that it has completed the first phase of its spring/summer exploration program at its Clayton Valley Lithium Property near Silver Peak, Nevada, which includes a detailed infill soil sampling program and a previously announced MT geophysical survey. At the Clayton Valley Lithium Project, the Company contracted the services of Rangefront Geological to perform both a detailed infill soil sampling of the southern section of the claim block and to oversee a Magnetotelluric geophysical survey to obtain information about subsurface resistivity and geology performed by KLM Geoscience LLC over the entire property. The infill soil sampling exploration work has now been completed and samples have been transported to the assay lab pending results. Toget...
    30.05.2024
  • Coniagas Battery Metals Inc. is excited to announce significant initial sample results, showcasing encouraging copper and cobalt grades from the offshore stockpiles identified for evaluation using the Re-2Ox hydrometallurgical process. This development marks an essential step in our mission to become a leading supplier of critical battery metals for the North American electric vehicle industry. The preliminary assays reveal copper and cobalt concentrations of 1.76% Cu and 0.36% Co from one of the identified stockpiles containing 3,000,000 tonnes, highlighting the potential for high-grade materials. These results reinforce the urgency of further detailed analysis and underscore our strategic focus on securing quality feedstock for our domestic operations. Strategic Importance ...
    30.05.2024
  • Adamera Minerals Corp. announces a second copper target on the Talisman property. This target is distinct from the Talisman Mine, a skarn deposit that was mined historically. Based on geological mapping and an on-going data review, a stratabound copper-silver target exists to the south and west of the skarn and it represents potential for a larger mineral system, geologically analogous to the copper-silver deposits of the Revett-Formation in the Belt Basin of western Montana and northern Idaho. The Talisman Property is located in Washington State, near Laurier at the USA-Canada border. To advance this project, Adamera Minerals Corp. has proposed a drilling program to test the depth and lateral extent of the stratabound copper-silver mineralization and to determi...
    30.05.2024
  • IberAmerican Lithium Corp. is pleased to announce today the appointment of Mike Jones as chief operating officer of the Company. As chief operating officer, Mike will oversee the mining operations of the Company encompassing its existing lithium assets that are in the exploration and evaluation phase, and the tin and tantalum mining operations at the Penouta mine pursuant to the anticipated closing of the previously announced business combination with Strategic Minerals Europe Corp. . Mike Jones is a professional mining engineer with over 40 years of experience in the metals and mining industry, across six continents, all major commodities, and most principal mining methods. Mr. Jones held various roles with organizations throughout his earlier career where he s...
    30.05.2024
  • Program targeting potential copper-gold porphyry systems Seabridge Gold reports today that this year's drill program at our 100%-owned Iskut Project has commenced testing for source copper-gold porphyries for the intermediate sulfidation epithermal mineral systems recognized in our 2023 program. The Iskut Project is located in the Golden Triangle of northwest B.C. about 30 kilometers by air from our KSM gold-copper district. The search for source intrusions will employ three helicopter-portable drill rigs to complete approximately 15,000 meters of core drilling this year at a budgeted cost of $12 million. Seabridge Chairman and CEO Rudi Fronk commented: "Last year's expansion of the Bronson Slope mineral resource and the new discoveries at Snip North have given us clear direction on where ...
    30.05.2024
  • Cautionary Statements This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events or developments that the Company believes, expects or anticipates will or may occur are forward-looking information. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those...
    30.05.2024
  • Cabral Gold Inc. is pleased to announce drill results from five RC holes drilled at the Machichie Main and Machichie NE targets, Cuiú Cuiú Gold District, Brazil. Highlights RC421 drilled at the Machichie NE target returned 11m @ 33.0 g/t gold from 50m depth in saprolite and weathered and altered bedrock including 4m @ 89.3 g/t gold from 52m depth. RC420 drilled at the Machichie Main zone returned 25m @ 2.9 g/t gold from surface in weathered saprolite, including 12m @ 5.5 g/t gold. RC422 also drilled at Machichie NE returned 21m @ 1.3 g/t gold from surface in saprolite including 3m @ 7.5 g/t gold, and 13m @ 0.5 g/t gold from 36m depth, also in saprolite. These RC results from Machichie NE confirm the presence of another E-W trending mineralized structure 150m north of the Mach...
    30.05.2024
  • First Majestic Silver Corp. is pleased to announce the release of its 2023 Annual Report titled "20 Years. The Silver Evolution". The Report encompasses the Company's vision and mission, its values, its commitment to achieving its goals, and its 20-year evolution to becoming one of the world's largest silver producers. "It is with great pleasure that we release our 20-year anniversary Annual Report, reflecting on the incredible journey that First Majestic has been on," said Keith Neumeyer, President & CEO of First Majestic. "Not unlike the silver market, the past two decades have proved both very successful and challenging for the Company. Yet with each setback, we have come together as a business, embraced change, and grown into a substantial enterprise in a relatively short ...
    30.05.2024
  • Harfang Exploration Inc. is pleased to announce exploration plans for its portfolio of wholly-owned gold and critical and strategic minerals assets in Eeyou Istchee James Bay, Quebec . "This will mark the first field season for the new Harfang team," commented Rick Breger, President and CEO of Harfang. "We have been very busy compiling all the existing geoscience data in preparation for the Summer 2024 exploration program. The overarching goal of this summer's program is to gain focus so we can put together a long-term strategic plan. I believe a proper evaluation of our entire portfolio is of utmost importance before we can begin any discussion on strategy. As such, we will be focusing on surface exploration which is a cost-effective way to gain the understanding we need bef...
    30.05.2024
  • Highlights The Carpenter Lake Uranium Project is fully permitted for an extensive drilling program. The Project hosts extensive previous exploration with multiple high priority targets across the Cable Bay Shear Zone. The Project covers 13,387 hectares of the Cable Bay Shear Zone parallel to the Virgin River Shear Zone.1 Cameco's Centennial deposit is located 45km southeast of the Project.1 The Project is 95 km west of Cameco's past producing Key Lake uranium mine which extracted over 220 million lbs. of uranium by open pit at an average grade of 2.3% U3O8 from 1983-1997.1 Historical sampling from 2014 reveal multiple radioactive boulders on the Project with three over 1,000 ppm uranium, and up to 1,550 ppm uranium. VANCOUVER, British Columbia, May 30, 2024 -- [wp=4350]Greenridge Explorati...
    30.05.2024
  • SPOD Lithium Corp. is pleased to update shareholders on the Company's strategic plan for 2024 following the recent management change. The Company will shift its operational focus for the year 2024, aimed at strategically focused exploration programs which provide strategic opportunities to drive shareholder value. Mathieu Couillard, President and CEO of SPOD, commented, "SPOD is in a unique position, being well funded with over $1.7 million of cash on hand to execute its exploration strategy on its well-located assets in Quebec and Ontario. Exploration revolves around allocating the appropriate budget on the right projects." Significant Investment in 2024 Field Work Program Quebec Properties: SPOD is focusing on its MegaLi and Lithium Grande 4 options on the properties adjace...
    30.05.2024
  • Aya Gold & Silver Inc. is pleased to announce the publication of its 2023 Sustainability Report for the year ended December 31, 2023 . The report can be consulted on the ESG Analyst Centre page of the Corporation's website. Fourth Sustainability Report The Report presents the Corporation's progress and achievements across a range of environmental, social and governance practices and outlines the Corporation's commitments to stakeholders. This year's single report, which includes the Corporation's Task Force on Climate-related Financial Disclosures disclosure, is TCFD- and GRI-compliant. Benoit La Salle, President & CEO, commented, "I am very proud of our team's dedication toward progressing and embedding our ESG strategy which is outlined in this second TCFD-compliant report....
    30.05.2024
  • Troilus Gold Corp. is pleased to announce the discovery of a new gold zone named the 'West Rim Zone' located within 200 metres west of the North Reserve Pit Shell in addition to assay results from Zone X22 at its Troilus Project, located in northcentral Quebec, Canada. The results herein are part of an ongoing 25,000m drilling campaign designed to expand and define select drill targets along the main mineral corridor and regionally. Hole X22-24-080 Intercept Highlights: Newly discovered "West Rim" intersected 1.37 g/t AuEq over 11 m within a broader intersection of 0.74 g/t AuEq over 32 m starting at just 21 m downhole . Zone X22 intersected 10.27 g/t AuEq over 1 m and 0.83 g/t AuEq over 30m incl. 13.85 g/t AuEq over 1 m at 550 m depth . Justin Reid, CEO of [wp=308]Troilus Gol...
    30.05.2024
  • Luca Mining Corp. is pleased to announce financial results for the three months ended March 31, 2024. Highlights Production of 14,148 troy oz of gold equivalent up 20% from Q4 2023, being comprised of 4,297 ounces of gold, 207,505 ounces of silver, 3,068 tonnes of zinc, 791 tons of copper and 661 tonnes of lead. Total Net Revenue of C$22.04 million, an increase 21% from Q4 2023 A milestone achievement of Positive Operating Earnings: generated C$4.8 million in operating income and C$7.3 million in net income. Cash Flow: C$4.04 million in positive operating cash flow before working capital changes. Operating Costs: All-in Sustaining costs per AuEq oz produced was US$1,325 at Campo Morado and US$1,690 at Tahuehueto for consolidated AISC of US$1,549. We note that AISC is expected ...
    30.05.2024
    von CNW



Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.