Fathom Nickel CEO Ian Fraser joined Steve Darling from Proactive to unveil the results of the Q1 drill program conducted at the company's Albert Lake Project. The program, characterized by the drilling of 6 holes totaling 1,386 meters, has yielded promising outcomes, with drillhole AL24077 intersecting 0.42% nickel over a significant intersection of 2.01 meters.
A key highlight emphasized by Fraser is the nickel mineralization's host rock: orthopyroxenite. This particular geological formation is integral to the host rock assemblage identified at the nearby Rottenstone deposit, renowned for its exceptionally high-grade nickel, copper, and platinum group elements . The proximity of the mineralization to the historic Rottenstone deposit, located approximately 1.2 kilometers to t...