HIGHLIGHTS More than 10,500 m of combined aircore and reverse circulation drilling completed by De Grey Mining at the Becher Project in Q4 2023, as part of the Egina earn-in/JV RC drilling at Lowe confirmed gold mineralisation associated with a deformed intrusive sill, with a best intercept of 8 m at 4.74 g/t Au from 96 m, including 3 m @ 11.88 g/t Au from 100 m Follow-up RC drilling into a base metal-gold corridor previously defined by Novo at Heckmair, intersected a significant zone of base metal-gold mineralisation from the two RC holes targeting the corridor. Results include: 10 m @ 0.12 g/t Au, 29.7 g/t Ag, 0.3% Cu, 1.5% Pb and 1.8% Zn from 40 m including 3 m @ 0.20 g/t Au, 59.8 g/t Ag, 0.9% Cu, 2.4% Pb and 2.2% Zn from 47 m 24 m @ 0.2 g/t Au, 13.2 g/t Ag, 0.1% Cu, 1.0% Pb and 0.1% Zn...