Hole FG23-359 reports 27.60 g/t Au over 2.1m, hole FG23-361 intersected 16.47 g/t Au over 2.3m and hole FG23-351 reported 2.19 g/t Au over 16.8m, including 3.28 g/t Au over 7.0 and 3.21 g/t Au over 2.0m Mineralization outside current Fenn-Gib pit-constrained 3.38M ounce deposit Footwall Zone structure over 500m strike length, open in all directions Steep dipping mineralization from surface to below 600m Multiple parallel mineralized structures intersected Two drill rigs active at Footwall Zone VANCOUVER, British Columbia, Jan. 10, 2024 --
Mayfair Gold Corp. is pleased to announce further results from the higher-grade Footwall Zone located approximately 100 meters to the northwest of the Fenn-Gib gold deposit. Mayfair's 100% controlled Fenn-Gib Project, located in the Timmins ...