4.86 g/t Au, 43.6g/t Ag, 1.27% Zn, 0.44% Pb, 0.09% Cu, over 11.7 m, incl. 28.6 g/t Au, 224g/t Ag, 4.35% Zn, 2.89% Pb, 0.29% Cu, over 1.7 m 10.3 g/t Au, 37.8 g/t Ag, 3.81% Zn, 0.08% Pb, 0.12% Cu over 5.6 m, incl. 17.8 g/t Au, 71.0 g/t Ag, 7.19% Zn, 0.15% Pb, 0.17% Cu over 2.9 m
Orla Mining Ltd. is pleased to provide an update on its exploration activities on the extension of the Camino Rojo deposit in the second half of 2023. These recent exploration results emphasize that the Camino Rojo deposit remains open and has substantial upside potential. Camino Rojo Extension Summary Historical and recent exploration drilling targeted lower stratigraphy, beneath the existing resources. In 2023, a drill section was completed 450 metres down-plunge from the current mineral resources and...