LINE 2 Awarded Araguaia Line 2 Feasibility Study, aiming to double nickel production to 29,000 tpa; Anticipated low capital intensity through leveraging the shared infrastructure and services from Line 1; AACEI Class 3 standard cost estimate; Line 2 process plant sits within the existing industrial area; Trade off to allow a percentage of
[...]