Drill Hole HK22-020: 212 m of continuous mineralization at 0.7% TREO with 17% PMREO, with one metre samples up to 2.7% TREO with 28.5% PMREO, and including 48 m @ 1.0 % TREO with 19% PMREO at the end of the hole, and open to depth. The 212 metre intersection in Hole HK22-020 is on structure, along-strike to the southeast of the 25.5 m @ 1.131% TREO
[...]