Tardan Production During H1 mining continued at the Pravoberezhniy deposit, which will be the main source of ore in 2019. 189,200 tonnes of ore was mined at an average grade of 2.59 g/t. Also, 515,000 m3 of stripping works was carried out. In H1 2018, no mining operations were carried out as Auriant made the decision to halt mining operations at
[...]