Highlights: During H1 2019, mining operations were carried out at the Pravoberezhniy deposit, which will be the main source of ore in 2019. 189.2 thousand tonnes of ore were mined at an average grade of 2.59 g/t. Volume of stripping works amounted to 515 thousand m3. In H1 2019, Tardan continued production on the heap leach. 172.6 thousand tonnes
[...]