AK22-065 intersected a total 81.0 metres of composite mineralization including 1,057 cps over 52.3 m, ranks as the second-best drill hole on the project AK22-052 intersected 2,677 cps over 30.0 metres beginning 30.0 metres downhole, ranks as best drill hole on the project Another near-surface zone has been discovered
[...]