• Sonntag, 22 Dezember 2024
  • 03:57 Uhr Frankfurt
  • 02:57 Uhr London
  • 21:57 Uhr New York
  • 21:57 Uhr Toronto
  • 18:57 Uhr Vancouver
  • 13:57 Uhr Sydney

International Silver, Inc. Announces Prince Mine Phase I Drill Results

18.03.2013  |  Marketwire
TUCSON, Mar 18, 2013 - International Silver, Inc. (OTCQB: ISLV) is pleased to announce that it has completed sixteen reverse circulation drill holes and completed the Phase I Prince Mine Drill Report. The Prince Mine is located in the Pioche district of Lincoln County, Nevada.

From August 16 through October 28, 2012, a total of 11,680 feet were drilled at 16 hole locations using reverse circulation air rotary methods. The drill program was designed to provide proof of concept information on the exploration model for the area and define mineralized zones worthy of resource definition drilling. Highlights from the results are as follows:

            Footage  Footage                OPT       OPT
Drill Hole From To Interval Gold Silver % Lead % Zinc % Manganese
PRC 10 630 680 50 0.043 1.48
690 830 140 0.041 1.52
PRC 11 15 165 150 0.01 2.87 2.2 2.9 8.7
205 245 40 <0.005 1.27 2.0 1.6 8.5
285 360 75 0.013 2.51 3.5 1.6 9.8
470 555 85 0.021 3.04 2.5 1.8 9.7
PRC 14 440 455 15 <0.005 4.30 2.4 1.6 5.0
730 745 15 <0.005 1.77 1.0 2.3 8.5
840 900 60 <0.005 1.70 1.1 1.7 10.0
PRC 15 735 800 65 <0.005 1.44 0.9 1.8 5.6
PRC 17 420 440 20 0.014 0.80 1.7 2.2 6.2
735 750 15 0.006 2.0 2.1 2.6 6.5
855 910 55 0.005 1.0 0.8 1.4 5.6
PRC 19 635 650 15 0.009 1.30 0.8 2.8 12.4
815 825 10 0.072 0.96
PRC 21 290 360 70 0.005 0.90 1.1 1.3 6.3
PRC 23 610 660 50 0.006 1.80 1.0 2.0 9.5
PRC 24 540 620 80 0.008 3.60 1.0 2.6 9.3
PRC 25 575 615 40 0.080 0.94 1.2 1.0 4.2

The results of the 2012 Phase I drill program indicated that three areas merit additional exploration based on the following:

1) Sediment hosted gold mineralization without significant lead-zinc grade is present on the property. Drill hole PRC 10 intercepted 190 feet of mineralization at 630 feet of depth grading 0.04 opt gold and 1.5 opt silver. Fifty feet of the intercept was oxidized while the remainder was in sulfides. Two other drill holes, PRC 19 and PRC 25 intercepted from 10 to 40 feet of gold mineralization grading 0.07 to 0.08 opt with 0.9 opt silver.

2) Limestone replacement type silver, lead, zinc, manganese mineralization was found at depths between 540 and 660 feet below surface as in drill holes PRC 23 and PRC24. The mineralization ranges from 15 feet to 80 feet in thickness and extends more or less continuously on strike for a distance of 3000 feet. This mineralized structural zone between two major faults is inferred to host 4,800,000 tons of mineralized material grading 0.019 opt gold, 1.96 opt silver, 1.0% lead, 2.1% zinc and 6.7% manganese. The mineralization is expected to be amenable to underground mining methods.

3) Drill holes PRC 11 and PRC 21 intercepted near surface, replacement type mineralization that appears to be open pit mineable. Using the 2012 drilling data combined with that from other nearby underground sampling points, an inferred tonnage of mineralized material was calculated in this area totaling 5,200,000 tons averaging 0.008 opt gold, 2.57 opt silver, 2.7 % lead, 2.2% zinc and 9.6% manganese as oxides.

Mr. Shipes, International Silver's President and CEO, commented: "We are very pleased with the results of our Phase I Drill Program; we were successful in identifying three major target areas with a very modest exploration budget. We are very excited to commence with our Phase II Definition Drilling Program later this year."


About International Silver, Inc.

International Silver, Inc. (the "Company"), headquartered in Tucson, Arizona, is an exploration and mine development company with properties in Nevada, Montana and California. An emerging silver company, International Silver's common shares are traded on the OTCQB under the symbol ISLV.


Statements made which are not historical facts, such as anticipated payments or purchases are "forward-looking statements" and involve a number of risks and uncertainties that could cause actual results to differ materially from those projected, anticipated, expected or implied. These risks and uncertainties include, but are not limited to, metals price volatility, volatility of metals production and costs, exploration risks and results, political risks, project development risks, labor issues and ability to raise financing. The information contained in this press release should not be construed as any indication whatsoever of the Company's future revenues or financial condition or the future price of its common stock. Refer to the Company's Form 8-K, Form 10-Q and 10-K reports for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation and has no intention of updating forward-looking statements.

International Silver's Home Page can be accessed on the Internet at www.internationalsilverinc.com



For further information please contact:

International Silver, Inc.
Matthew J. Lang, Vice President - Administration
520-889-2040 ext. 10
mlang@internationalsilverinc.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
International Silver Inc.
Bergbau
?
US4603281076
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.