Paladin Energy Ltd: Quarterly Activities Report For Period Ending-31 March 2013

17.04.2013  |  Marketwire

PERTH, WESTERN AUSTRALIA -- (Marketwired) -- 04/17/13 -- Paladin Energy Ltd ("Paladin" or "the Company") (TSX: PDN)(ASX: PDN) is pleased to provide its Quarterly Activities Report for the three month period ended 31 March 2013.


HIGHLIGHTS



-- Strong sales revenue of US$106M for the quarter, selling 1.92Mlb U3O8 at
average price of US$55.22/lb.

-- Continued solid quarterly production, with year to date production for
FY2013 versus FY2012 at a record high.

-- combined production for the March quarter of 1.992Mlb (904t) U3O8
was 95% of nameplate production, a decrease of 9% from the December
record quarter.

-- year to date (9 months) production for FY2013 of 6.112Mlb (2,773t)
U3O8 is a 26% increase over the previous FY2012 period, reflecting
96% of combined nameplate and in line with guidance.

-- Cost savings and optimisation initiatives continue successfully with
unit production costs continuing to reduce at both mines for the
quarter.

-- Langer Heinrich production of 1.230Mlb (558t) U3O8 achieving 96% of
nameplate for the quarter.

-- production was influenced by temporary water constraints and some
operational issues. Those are being resolved with improved water
conservation measures in place and desalinated water scheduled to be
introduced in May.

-- year to date production (9 months) for FY2013 remains slightly above
nameplate.

-- strong recovery of 86.7% versus design of 85%.

-- feed grades of 810ppm U3O8 versus design of 800ppm.

-- production capacity remains robust and above nameplate.

-- Kayelekera production of 761,992lb (346t) U3O8 achieving 94% of
nameplate for the quarter.

-- average daily production at an all-time high for the quarter.

-- feed grades of 1,094ppm U3O8 on track (design is 1,100ppm).

-- record recovery of 87.1%.

-- maintaining self sufficiency on acid requirements.

-- safety milestone of 365 lost time injury free days achieved.

-- Strategic initiative work advancing well with results expected mid June
quarter.

-- FY2013 production guidance of 8.0 - 8.5Mlb U3O8 remains well on target.


SAFETY


The Company's high safety performance was impacted by two lost time injuries (LTIs) incurred during the period with the 12-month moving average Lost Time Injury Frequency Rate (LTIFR) increased from 1.1 to 1.2. One LTI occurred at Langer Heinrich Mine (LHM) and involved an operator suffering an injury to his back when he slipped and fell approximately 2m. The incident investigation revealed that the employee was not using a safety harness and procedures are being adjusted to mitigate further similar incidents. The other LTI was exploration related and involved a contractor suffering a crushed finger while handling fuel drums at the Michelin camp in Canada.


During the period, the annual NOSA HSE grading audit for LHM confirmed a 4 Platinum Star rating.


There were no LTIs at Kayelekera Mine (KM) for the period. KM also achieved a milestone 365 LTI free days on 28 March 2013.


QUARTERLY URANIUM SALES


Sales for the quarter were 1,920,230lb U3O8 generating revenue of US$106M, representing an average sales price of US$55.22/lb U3O8 (average Ux spot price for the quarter was US$42.71/lb U3O8). As foreshadowed in the last Quarterly Report, sales are now more closely aligned with production although some variations can be expected from quarter-to-quarter due to customer requirements.


LANGER HEINRICH MINE, Namibia (100%)


Production by quarter



----------------------------------------------------------------------------
LHM Jun 2012 Qtr Sep 2012 Qtr Dec 2012 Qtr Mar 2013 Qtr
----------------------------------------------------
U3O8 Production (lb) 1,322,480 1,290,462 1,418,583 1,230,081
----------------------------------------------------------------------------


Production totalled 1,230,081lb U3O8, which was 13% lower than the previous quarter. The plant continued to perform well and in accordance with the design parameters of the Stage 3 upgrade, which was designed around the limitations of the NamWater infrastructure that supplies water to the mine. Consequently, any disruption to the supply of water has a direct impact on production and during the quarter the supply was disrupted as NamWater acted to upgrade its supply infrastructure in the region to accommodate the additional water requirements associated with new mining developments (mainly the new Husab uranium mine).


This action is part of a long-standing initiative by NamWater to transition from aquifer water to desalinated water later in the year.


In order to overcome the current water supply constraint on production, an interim agreement is being concluded with NamWater and Areva, the owners of the desalination plant in Namibia, to access additional desalinated water, ahead of schedule, from May 2013. In addition to this, an increased focus on water conservation at site will mitigate against further disruptions.


This combined strategy of a short-term agreement and water conservation measures will eliminate any further disruptions to the water supply in the interim and thus allow a resumption of nameplate or better production.


Mining


The overall mined quantities decreased as planned over the quarter. The mining schedule was previously revised as part of the cost rationalisation programme. Ore mining and availability remained unaffected.



----------------------------------------
Dec 2012 Qtr Mar 2013 Qtr
----------------------------------------------------------------------------
Ore mined (t) 1,191,756 829,366
----------------------------------------------------------------------------
Grade (ppm) 798 823
----------------------------------------------------------------------------
Additional low grade ore mined (t) 757,649 531,667
----------------------------------------------------------------------------
Grade (ppm) 320 314
----------------------------------------------------------------------------
Waste/ore ratio 2.54 3.88
----------------------------------------------------------------------------


Mining continued in three pits with sufficient ore exposed to fulfil plant feed requirements.


ROM ore stocks have been maintained at around four weeks' supply while being supplemented by medium grade ores in line with the crusher blend requirements.


Process Plant


The plant experienced reduced throughput in the March quarter as reflected below:



----------------------------------------
Dec 2012 Qtr Mar 2013 Qtr
----------------------------------------------------------------------------
Ore milled (t) 914,847 797,696
----------------------------------------------------------------------------
Grade (ppm) 805 810
----------------------------------------------------------------------------
Scrub efficiency (%) 92.7 91.1
----------------------------------------------------------------------------
Leach extraction (%) 95.1 95.8
----------------------------------------------------------------------------
Wash efficiency (%) 86.7 88.8
----------------------------------------------------------------------------
Overall recovery (%) 87.4 86.7
----------------------------------------------------------------------------


Ore feed tonnage through the process plant reduced by 12.8% with total throughput of 797,696t. The reduced throughput can be attributed to the temporary water constraints and some operational issues mainly in ion exchange. These issues have since been rectified. The water constraints, which influenced the general performance capability of the plant, were the most significant.


The scrub efficiency reduced to 91.1% (against a design of 93%). As reported previously, optimisation work in the screening area in order to further improve performance is ongoing, with the classification section remaining the focal area of these optimisation efforts.


The extraction in the leaching circuit continued to improve in line with expectations with a new quarterly record recovery of 95.8%. This improved performance is due to improved heat management and subsequent consistently higher leach temperatures as well as the previously reported initiatives on improving throughput consistency.


The efficiencies in the Counter-Current Decantation (CCD) circuit have improved as a result of the continuing optimisation efforts in this circuit. These improvements have had a further benefit of reducing overall water consumption and, as a consequence, reagent consumption leading to sustainable reductions in C1 operating costs. Further modifications and improved operating procedures are being implemented, which should lead to additional improvements.


The overall plant recovery reduced slightly to 86.7%. The most significant contributors were a result of lower scrub efficiency, lower ion exchange ("IX") efficiency and a reduction in the return solution from the tailings storage facility. The leach section achieved record recovery whilst the wash efficiency also showed a marked improvement from the previous quarter.


Construction work on the newest tailings storage facility ("TSF3") (full in-pit tailing deposition area) continued during this period and is scheduled for completion in the December quarter. It is now envisaged that the tailings deposition to TSF2 will extend to the second half of CY2013. Construction of TSF2 extension also continued throughout the quarter.


Production Optimisation


Optimisation of the process continued during the quarter with material and sustainable gains being achieved:



-- Water consumption and, as a consequence, reagent consumption and soluble
loss, have been significantly reduced;

-- CCD performance has been improved, with further improvements expected
over the coming periods;

-- Operational stability has been improved, particularly the front end,
with improved downstream performance; and

-- Heat recovery/management has been improved in the leach and flash
circuits, resulting in higher average leach temperatures, and
consequently, higher leach extractions.


The installation of the Hydrosort classification unit remains on track for commissioning early in the September quarter and is expected to improve front end ore beneficiation in the coming year.


Further optimisation targets are also being developed on the basis of expanded Stage 3 operating experience.


KAYELEKERA MINE, Malawi (85%)


Production by quarter



----------------------------------------------------------------------------
KM Jun 2012 Qtr Sept 2012 Qtr Dec 2012 Qtr March 2013 Qtr
--------------------------------------------------------
U3O8 Production
(lb) 726,299 638,950 772,280 761,992
----------------------------------------------------------------------------


In the March quarter, total production fell slightly to 761,992lb; however, average daily production increased marginally to 8,467lb/day compared with 8,395lb/day during the December 2012 quarter.


Mining


Mining data



----------------------------------------
Dec 2012 Qtr March 2013 Qtr
----------------------------------------------------------------------------
Ore mined (t) 404,261 29,192
----------------------------------------------------------------------------
Grade (ppm) U3O8 1,814 1,816
----------------------------------------------------------------------------
Additional low grade ore mined (t) 63,201 6,096
----------------------------------------------------------------------------
Grade (ppm) 521 471
----------------------------------------------------------------------------
Waste/ore ratio 1.54 17.95
----------------------------------------------------------------------------


Total material mined for the quarter was 29% below target due to poor equipment availability and wet ramps. The outlook for the upcoming quarter as the project enters the dry season is good with equipment availability set to improve as additional equipment is supplied by the mining contractor.


All mining quantities were down for the above reasons and, with the large stock piles in place, the focus was on waste stripping during the period, reflecting the high waste-to-ore ratio for the quarter. This will revert to normal for the coming dry season.


Ore availability on stockpiles (ROM pad) still remains in excess of five months of plant requirements at budget tonnes and grade.


Process Plant


Operating data



----------------------------------------
Dec 2012 Qtr March 2013 Qtr
----------------------------------------------------------------------------
Operating time (hrs) 1,942 1,853
----------------------------------------------------------------------------
Mill feed(t) 356,764 364,381
----------------------------------------------------------------------------
Grade (ppm) U3O8 1,159 1,094
----------------------------------------------------------------------------
Leach extraction (%) 90.7 91.4
----------------------------------------------------------------------------
RIP efficiency (%) 93.9 96.6
----------------------------------------------------------------------------
Overall efficiency (%) 83.8 87.2
----------------------------------------------------------------------------


Leach recovery increased to 91.4% and acid consumption was maintained at budget with on site acid production meeting process requirements.


Resin management also remains a primary focus. Improvements in resin-in-pulp ("RIP") efficiency continued with 96.6% efficiency delivered. Improvements in RIP are largely the result of completion of the RIP Refurbishment Project, which allows additional contactors to be on line. In the coming quarter, continuous resin advance will be trialled with a view to full incorporation in the September quarter. It is expected that this will remove the RIP/Elution circuit as the principal process bottleneck and allow consistent performance at or above nameplate.


Overall recovery for the quarter increased to a record 87.2% as a result of the improved leach recovery and an improved RIP efficiency.


Production Optimisation


The two key optimisation projects identified in the last quarterly, grid power and acid recycling, are progressing well, although both have experienced minor delays. Notwithstanding the delays, costs remain within budget expectation.


Two further optimisation initiatives are also underway. As mentioned above, continuous resin advance will be trialled in the coming quarter with a view to full implementation in the following quarter. In addition to this initiative, the milling classification circuit is also being upgraded with a view to reducing milling power consumption and grind size. The reduced grind size will result in improved leach and RIP performance.


Exploration


Exploration concentrated on the preparation for the 2013 drilling programme. This programme will be larger than in previous years, with 20,000m of reverse circulation planned. Drilling will commence during this year's dry season.


UNIT COST IMPROVEMENT


Cost savings and optimisation initiatives through technical innovation continue to successfully reduce total costs and unit production costs at both mines.



-- At LHM, C1 cost of production remained steady in the March quarter
compared to the December quarter C1 costs of production of US$29.60/lb
U3O8. The underlying cost base reduced and C1 cost reductions would have
been realised if nameplate production had been achieved. Unit cost
reduction for the December and March quarters totalled 6.5%, in line
with the Company's 17th November 2012 announcement - "Cost Reductions."

-- At KM, C1 cost of production continued to drop substantially with a
reduction of 8.5% in the March quarter from the C1 cost of production of
US$43.50/lb U3O8 for the December quarter. C1 cost of production
reduction for the December and March quarters of 20% is significant and
is better than forecast given in the November 2012 announcement.

-- Further improvements in C1 costs are expected as a number of the most
significant cost saving initiatives at both sites have yet to be fully
implemented.


PRODUCTION GUIDANCE FY2013


The continued solid and stable combined production over the past three quarters at LHM and KM of 6.11Mlb U3O8, with clear opportunities for continued improvement, place the Company in a good position to achieve its stated production target guidance of 8.0 to 8.5Mlb U3O8 for FY2013.


AURORA - MICHELIN URANIUM PROJECT, Canada (100%)


The Michelin winter infill drilling programme was completed with nine diamond holes for 3,272m. Uranium mineralisation occurs in strongly foliated felsic and mafic Aillik Group rocks in the N60 degrees E-striking, 50 degrees SE-dipping lenticular main zone and in two small hanging wall lenses. Drill intercepts from last summer and this winter targeting gaps in previous drilling generally showed more variable intercepts than expected. Hole M13-145 intersected 60m @ 1,012ppm eU3O8 to confirm the core of the Michelin ore body. The updated resource estimate is planned for late June/early July. Some large approx. 100m gaps still exist in the southwest portion of Michelin and these will be targeted for summer drilling. Significant results from the recent winter drilling include:



----------------------------------------------------------------------------
Inter- Grade
Azi- EOH val eU3O8
ID East North RI Grid muth Dip Depth From To (m) (ppm)
----------------------------------------------------------------------------
M12-141 306873 6052094 333 NAD83_21 340 -74 419 347.0 358.0 11.0 1423
----------------------------------------------------------------------------
365.0 373.0 8.0 445
----------------------------------------------------------------------------
387.0 394.0 7.0 883
----------------------------------------------------------------------------
M12-143 306899 6052080 336 NAD83_21 340 -63 401 341.0 362.0 21.0 478
----------------------------------------------------------------------------
M13-144 306873 6052094 336 NAD83_21 332 -74 197
----------------------------------------------------------------------------
M13-145 307020 6052353 333 NAD83_21 355 -85 339 217.0 222.0 5.0 274
----------------------------------------------------------------------------
238.0 298.0 60.0 1012
----------------------------------------------------------------------------
M13-146 306873 6052094 336 NAD83_21 338 -62 383 319.0 328.0 9.0 454
----------------------------------------------------------------------------
M13-147 306873 6052094 336 NAD83_21 338 -69 413 323.0 327.0 4.0 978
----------------------------------------------------------------------------
338.0 353.0 15.0 333
----------------------------------------------------------------------------
M13-148 306668 6052050 333 NAD83_21 355 -84 419 391.0 396.0 5.0 751
----------------------------------------------------------------------------
M13-149 306873 6052094 336 NAD83_21 338 -75 410 350.0 366.0 16.0 996
----------------------------------------------------------------------------
372.0 376.0 4.0 523
----------------------------------------------------------------------------
388.0 393.0 5.0 728
----------------------------------------------------------------------------
M13-150 306668 6052050 337 NAD83_21 355 -63 340 278.0 284.0 6.0 8467
----------------------------------------------------------------------------


Ground magnetic surveys were completed over swamps and lake areas not accessible in the summer period.


The complete ground survey will now help to develop new targets along the Michelin corridor, which extends 5km south west and northeast of the ore body.


MANYINGEE PROJECT, Australia (100%)


Evaluation of the 2012 drilling results is concentrating on developing an updated JORC-compliant resource and a new hydrogeological model to be used in any future in-situ recovery ("ISR") leach trial operations. An updated resource estimate is expected by June. Preparations have started for the 2013 drilling programme, which includes 10,000m rotary mud drilling to confirm and expand the resource base.


STRATEGIC INITIATIVE EFFORTS


Considerable effort has been applied to advancing the strategic initiative undertaken to unlock value from some of Paladin's assets. There is keen interest by the selected parties to become involved and the final phase has been entered.


As previously indicated, the proceeds from these initiatives will be applied to debt reduction and strengthening the balance sheet.


URANIUM MARKET COMMENTS


The Ux spot price moved in a narrow range during the quarter moving from a high of US$44.00/lb U3O8 in January before stabilising at US$42.25/lb U3O8 in March. The Ux term price was unchanged at US$56.00/lb U3O8 for the quarter.


Outlook


During this quarter, one new reactor, Hongyanhe-1, a 1000 MWe Pressurised Water Reactor (PWR) was connected to the grid in China, and formal construction started on Virgil C Summer-2 and Vogtle-3, both 1117 MWe PWR in the USA. Worldwide there are now 68 nuclear power plants under construction in 15 countries, which is six plants more than were under construction prior to the Fukushima accident in March 2011. With the exception of Japan, where there are still 48 plants offline pending the determination of new safety standards by the Nuclear Regulation Authority by July this year, the global nuclear fleet is performing well and is growing significantly in line with long-standing predictions.


Declaration


The information in this Announcement relating to exploration and mineral resources is, except where stated, based on information compiled by David Princep B.Sc who is a Fellow of the AusIMM. Mr Princep has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and as a Qualified Person as defined in NI 43-101. Mr Princep is a full-time employee of Paladin Energy Ltd and consents to the inclusion of this information in the form and context in which it appears.


ACN 061 681 098

Contacts:

In Australia:

Paladin Energy Ltd

John Borshoff, Managing Director/CEO

+61 8 9381 4366

Mobile: +61 419 912 571
john.borshoff@paladinenergy.com.au


In Canada:

Paladin Energy Ltd

Greg Taylor, Investor Relations Contact

+905 337-7673 or Mobile: 416 605-5120 (Toronto)
greg.taylor@paladinenergy.com.au
www.paladinenergy.com.au


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Paladin Energy Ltd.
Bergbau
890889
AU000000PDN8
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.