Eagle Mountain Gold Corp. Announces Updated Resource Estimate for the Eagle Mountain Gold Project in Guyana
The updated classified mineral resource estimate of the Eagle Mountain gold deposit at 0.5 g/t Au cut-off consists of:
- Indicated resource of 3,921,000 tonnes, averaging 1.49 grams per tonne Au for 188,000 ounces.
- Inferred resource of 20,635,000 tonnes, averaging 1.19 grams per tonne Au for 792,000 ounces.
Therefore, the November 2012 updated resource estimate represents approximately a 34% increase from the November 2010 resource outline.
The updated resource estimate is based on a comprehensive database consisting of 281 drill holes, totaling 35,993 meters and 21,235 assay samples, which were drilled by British Anaconda Mining, the Government of Guyana, Golden Star Resources, Cambior, IAMGOLD and Eagle Mountain. The database also contains 14,624 assays from 4,873 augers, 124 continuous channel sample segments from nine adits, and 1,318 assays from 199 continuous channel sample segments from trench localities. Mineral resource estimation was carried out using only the diamond drill and trench sample results.
The November 2012 classified NI 43-101 updated resource estimate for gold at Eagle Mountain is summarized by material zone in the following table:
November 2012 Updated Eagle Mountain Resource Estimate by Category, Zone and Type Material
(using Block Model Cut-off of 0.5 g/t Au)
Category Zone Material Density (t/m3) Volume (m3) Tonnes Au_g/t Ounces
Saprolite 1.60 538,000 860,000 1.42 39,000
Zion Fresh 2.60 436,000 1,134,000 1.40 51,000
Total 2.03 974,000 1,994,000 1.41 90,000
Saprolite 1.60 456,000 730,000 1.49 35,000
Indicated Kilroy Fresh 2.60 461,000 1,197,000 1.63 63,000
Total 2.08 917,000 1,927,000 1.58 98,000
Saprolite 1.60 994,000 1,590,000 1.45 74,000
All Fresh 2.60 897,000 2,331,000 1.52 114,000
Total 2.05 1,890,000 3,921,000 1.49 188,000
Saprolite 1.60 2,671,000 4,274,000 1.31 180,000
Zion Fresh 2.60 3,035,000 7,891,000 1.13 286,000
Total 2.16 5,706,000 12,165,000 1.19 466,000
Saprolite 1.60 1,831,000 2,929,000 1.33 126,000
Inferred Kilroy Fresh 2.60 2,132,000 5,542,000 1.12 200,000
Total 2.25 3,962,000 8,471,000 1.20 326,000
Saprolite 1.60 4,502,000 7,202,000 1.32 306,000
All Fresh 2.60 5,167,000 13,433,000 1.13 486,000
Total 2.19 9,668,000 20,635,000 1.19 792,000
Notes for mineral resource estimate:
1. A block cut-off value of 0.5 g/t Au was applied to all resource blocks.
2. Tonnes and ounces have been rounded to reflect the relative accuracy of the mineral resource estimate; therefore numbers may not total correctly.
3. A notional cut-off gold grade for mineralized domain interpretation was 0.2 g/tonne Au.
4. A top cut of 20 g/tonne Au was applied to raw assay values.
5. Composited Diamond drill hole and trench samples are assigned to 30 layered and fault bound resource domains that encompass the Zion and Kilroy portions of the deposit.
6. Corresponding domain blocks and composite samples are projected to a horizontal plane for grade estimation by Ordinary Kriging.
7. The block model is constrained by topography and saprolite and fresh weathering domains with bulk density values of 1.6 t/m3 and 2.6 t/m3 respectively were defined.
8. Mineral Resource tonnes quoted are not diluted.
9. Mineral resources are not mineral reserves and by definition do not demonstrate economic viability. This mineral resource estimate includes inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to the measured and indicated resource categories through further drilling, or into mineral reserves, once economic considerations are applied.
10. This estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant issues
ACA Howe considers that gold mineralization identified at Eagle Mountain may be amenable to open-pit extraction and that mineral resources are reported at an appropriate cut-off grade taking into account possible extraction scenarios and processing recoveries.
The Eagle Mountain deposit is located within the Eagle Mountain Prospecting License ("EMPL") which covers an area of 50.50 km2 (5050ha) in west-central Guyana, South America approximately 200 kilometres south-southwest of Guyana's capital, Georgetown. The property can be accessed by road from Georgetown in five to six hours, or by air to the Mahdia airstrip located five km north of the property.
Most of the gold mineralization at Eagle Mountain is related to low-angle (20-40o), southwest dipping brittle-ductile composite shear zones hosted in a composite granodiorite pluton that intrudes all older rocks. The updated geological model refers to two distinct mineralized shear zones that host the current mineral resource estimate: the Zion and Kilroy zones. Each zone can be distinguished based on visual geological and mineralogical characteristics. Very fine-grained gold is associated with chloritic ± pyritic micro-fractures and in some cases within or adjacent to discrete chlorite – pyrite ± potassic altered mylonitic shear zones. The mineral resource is located in both oxidized rock (referred to as "saprolite") and non-oxidised rock (referred to as "fresh" or "hard rock").
Qualified person
The resource estimate was prepared by Leon McGarry, B.Sc., Geologist, ACA Howe and supervised by Ian Trinder, M.Sc., P.Geo., Senior Geologist, ACA Howe. Technical information related to the 2012 Eagle Mountain Resource Estimate contained in this news release has been reviewed and approved by Mr. Trinder, who is an independent Qualified Person as defined by NI 43-101, with the ability and authority to verify the authenticity and validity of this data.
The effective date of this mineral resource estimate is November 21, 2012 and a NI 43-101 technical report will be filed at SEDAR within 45 days from this date.
On behalf of The Board of Directors of Eagle Mountain Gold Corp.
"Ioannis (Yannis) Tsitos"
President, CEO & Director
This document contains certain forward looking statements which involve known and unknown risks, delays, and uncertainties not under the corporations control which may cause actual results, performance or achievements of the corporation's to be materially different from the results, performance or expectation implied by these forward looking statements.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Ioannis (Yannis) Tsitos
President, CEO & Director
Phone: 604.806.0916