• Dienstag, 23 Juli 2024
  • 02:23 Uhr Frankfurt
  • 01:23 Uhr London
  • 20:23 Uhr New York
  • 20:23 Uhr Toronto
  • 17:23 Uhr Vancouver
  • 10:23 Uhr Sydney

Rock Tech Drills 56.58 metres of 2.48% Graphite at Lochaber

22.04.2013  |  The Newswire
Apr 22nd, 2013 Copyright (c) 2013 TheNewswire - All rights reserved.


(via Thenewswire.ca)


Vancouver, British Columbia, Canada, April 22, 2013 - Rock Tech
Lithium Inc. (TSX-Venture: RCK; Frankfurt: RJIA) (the
"Company" or "Rock Tech") announces updated assay
results for two drill holes at its Lochaber graphite project in
Quebec.


The assay results of these drill holes, PB-12-08 and PB-12-09, were
originally disclosed in a news release on December 19, 2012. After
interpreting the assay results, the Company sent the remaining core
intersections not initially submitted to the laboratory.


Highlights from these two drill holes include:


-Drill hole PB-12-08 intersected 120.60 metres of graphite at various
depths, ranging from 1.18% to 3.01% graphitic carbon ("Cg"),
including 56.58 metres at 2.48% Cg, 22.98 metres at 2.33% Cg, 14.04
metres at 3.01% Cg, 17.20 metres at 1.97% Cg and 9.80 metres at 1.18%
Cg; and


-Drill Hole PB-12-09 intersected 112.27 metres of graphite at various
depths, ranging from 2.09% to 6.00% Cg, including 59.92 metres at
2.09% Cg, 44.25 metres at 2.84% Cg, 7.10 metres at 3.42% Cg, and 1.00
metres at 6.00% Cg.


The above mentioned drill holes tested the graphite mineralization
along electromagnetic conductor 'C'. The electromagnetic conductors
were identified during geophysical surveys in September, 2012 (click
here to view a map).


These two drill holes are the last of the resubmitted samples from the
first phase of drilling. The Company expects to release the assay
results for the remaining drill holes in the near future.


Quality Assurance/Quality Control


All core samples are logged and split by wet diamond saw with half
sent to the lab for analysis and half stored securely on site. The
core sample lengths typically average 1 metre but vary depending on
geological boundaries. Additional QA/QC procedures include inserting
blanks and standards into the core sample stream at industry standard
intervals with duplicate core samples taken at intervals of twenty.
Core samples are prepped and analyzed by Global Mineral Research
Limited in Burnaby, British Columbia. During analysis, the core
samples are dried, pulverized, leached and roasted at 450? Celsius and
1200? Celsius with measured weights taken between double ignitions.
The laboratories also conduct duplicate and internal standard samples
at intervals of ten as part of their QA/QC program.



-----------------------------------------------------------------
|Drill |? |Length|Length To|Width |Graphite|Geophysical|
|Hole ID | |From | | | |Conductor |
| |------------------------------------------| |
| |? |Metres|Metres |Meters|% | |
|---------------------------------------------------------------|
|PB-12-08|? |5.46 |28.44 |22.98 |2.33 |C |
| |------------------------------------------| |
| |? |35.18 |91.76 |56.58 |2.48 | |
| |------------------------------------------| |
| |? |96.62 |110.66 |14.04 |3.01 | |
| |------------------------------------------| |
| |? |126.00|135.80 |9.80 |1.18 | |
| |------------------------------------------| |
| |? |145.80|163.00 |17.20 |1.97 | |
|---------------------------------------------------------------|
|PB-12-09|? |7.00 |8.00 |1.00 |6.00 |C |
| |------------------------------------------| |
| |? |31.00 |75.25 |44.25 |2.84 | |
| |------------------------------------------| |
| |including|43.00 |58.70 |15.70 |5.28 | |
| |------------------------------------------| |
| |? |80.47 |87.57 |7.10 |3.42 | |
| |------------------------------------------| |
| |? |99.08 |159.00 |59.92 |2.09 | |
-----------------------------------------------------------------


Drill hole PB-12-08 is located at 474802E, 5055291N (NAD 1983, Zone
18N) with azimuth 102.3? and dip -45?, drill hole PB-12-09 is located
at 474841E, 5055586N (NAD 1983, Zone 18N) with azimuth 102? and dip
-50.9?.


The technical information contained in this news release has been
reviewed by Afzaal Pirzada, P.Geo., Vice President, Exploration and
interim CEO of the Company and a Qualified Person as defined in NI
43-101.


On behalf of the Board of Directors,


"Afzaal Pirzada"


Afzaal Pirzada, P.Geo.


Director, Interim President and CEO, VP of Exploration


For more information, please contact:


Brad Barnett


Vice President of Corporate Finance and Development


Rock Tech Lithium Inc.


789 West Pender Street, Suite 1205


Vancouver, B.C., V6C 1H2


Telephone: (604) 688-1140


Facsimile: (604) 688-1173


Email: bbarnett@rocktechlithium.com


Disclaimer and Cautionary Statement Regarding Forward-Looking
Information


Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this press
release. This news release shall not constitute an offer to sell or
the solicitation of an offer to buy securities in any jurisdiction.


All statements, trend analysis and other information contained in this
press release relative to markets about anticipated future events or
results constitute forward-looking statements. Forward-looking
statements are often, but not always, identified by the use of words
such as "seek", "anticipate", "believe",
"plan", "estimate", "expect" and
"intend" and statements that an event or result
"may", "will", "should",
"could" or "might" occur or be achieved and other
similar expressions. Forward-looking statements are subject to
business and economic risks and uncertainties and other factors that
could cause actual results of operations to differ materially from
those contained in the forward-looking statements. Forward-looking
statements are based on estimates and opinions of management at the
date the statements are made. The Company does not undertake any
obligation to update forward-looking statements even if circumstances
or management's estimates or opinions should change. Investors should
not place undue reliance on forward-looking statements.

Copyright (c) 2013 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rock Tech Lithium Inc.
Bergbau
A1XF0V
CA77273P2017

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.