• Freitag, 20 Dezember 2024
  • 13:32 Uhr Frankfurt
  • 12:32 Uhr London
  • 07:32 Uhr New York
  • 07:32 Uhr Toronto
  • 04:32 Uhr Vancouver
  • 23:32 Uhr Sydney

Clifton Star Announces a Substantial Increase in the Gold Resource at its Duparquet Project

28.06.2013  |  Marketwire

QUEBEC CITY, QUEBEC -- (Marketwired) -- 06/28/13 -- Clifton Star Resources Inc. ("Clifton Star" or "the Company") (TSX VENTURE: CFO)(FRANKFURT: C3T) is pleased to announce a substantial increase in the gold resource at its Duparquet Project. The updated estimate of the Measured + Indicated Resource contains 3.11 million ounces with another 1.44 million ounces in the Inferred category. The NI 43-101 resource estimate, dated June 26, 2013, will be filed on SEDAR in the coming weeks.


Resource Highlights include:



-- Total Measured and Indicated Resources have increased to 3.11 million
ounces, up 29 %. It represents 68.3% of all resources. Total Inferred
resources amount to 1.44 million ounces

-- Total Measured and Indicated Resources have increased to 60.88 million
tonnes, up 32 %.

-- In-Pit Measured and Indicated Resources have increased to 2.67 million
ounces, up 38 %. It represents 74.6% of all In-Pit resources. In-Pit
Inferred resources total 0.91 million ounces.

-- In-Pit Measured and Indicated Resources have increased to 53.23 million
tonnes, up 40 %.


The new NI 43-101 resources estimate was prepared by InnovExplo Inc., mining consultants from Val d'Or, Quebec and will be incorporated in the upcoming Pre-Feasibility study on the Duparquet gold project. The block model was prepared by using 3D block modeling and inverse distance squared interpolation method. The updated resource database currently consists of a total of 849 diamond drill holes, accounting for 260,948 meters, with 168,555 sample intervals. It also includes 2,371 samples from 892 surface channel samples, equivalent to 1,827 sampled meters. This database includes all the drilling and assay results up to the cut-off date of May 6th, 2013. A high grade capping of 25g/t Au and a minimum true thickness of 3 meters were used. Mining and milling costs of $2.40USD/t and $13.46USD/t and G&A of $4.18/t USD were used in the Whittle open pit simulations. For the base case scenario, a $1445 USD /oz. gold price and a cut-off grade of 0.45 g/t Au were used for determining the in-pit resources. For the underground resources, a cut-off grade of 2.00 g/t was used for the base case. These parameters are the same as those used in the February 28, 2013 NI 43-101 resource estimation.


The purpose of the drilling since the last resource estimate was to convert existing Inferred Resources to Indicated Resources and to better define the continuity and quality of the open pit resources between surface and a depth of 350 meters. On the basis of contained ounces, more than 68% of total resources (3.11 million ounces) are now in the Measured + Indicated categories. Of these Measured and Indicated Resources, 2.67 million ounces are located within the Whittle pit shell. This new In-Pit resource of Measured + Indicated Resources is composed of 53,235,700 tonnes at an average grade of 1.56 g/t Au.


The Total Mineral Resource estimate is as follows:



- Measured resources: 9,006 ounces (184,700 t at 1.52 g/t)
- Indicated resources: 3,104,165 ounces (60,696,300 t at 1.59 g/t)
- Inferred resources: 1,442,689 ounces (29,684,700 t at 1.51 g/t)


The In-Pit Mineral Resource, base case, is as follows (official cut-off 0.45 g/t):



- Measured resources: 7,711 ounces (165,100 t at 1.45 g/t)
- Indicated resources: 2,666,690 ounces (53,070,600 t at 1.56 g/t)
- Inferred resources: 910,631 ounces (24,092,300 t at 1.18 g/t)


The Underground Mineral Resource, base case, is as follows (official cut-off 2.0 g/t):



- Indicated resources: 314,275 ounces (3,520,700 t at 2.78 g/t)
- Inferred resources: 532,059 ounces (5,592,400 t at 2.96 g/t)


The Beattie Tailings Resource, base case is as follows (official cut-off 0.45 g/t):



- Measured resources: 1,295 ounces (19,600 t at 2.06 g/t)
- Indicated resources: 123,200 ounces (4,105,000 t at 0.93 g/t)


The mineral resources stated in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards on mineral resources and reserves, definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.


Technical parameters used for the estimation:



-- The Independent and Qualified Persons for the Mineral Resource Estimate,
as defined by Regulation 43-101, are Carl Pelletier, B. Sc., P.Geo.,
Kenneth Williamson, M Sc., P.Geo, and Karine Brousseau, Eng. (InnovExplo
Inc.), and the effective date of the resource estimate is June 26, 2013.
-- Mineral Resources are not Mineral Reserves and do not have demonstrated
economic viability.
-- Tailing results are presented undiluted and in situ. The estimate
includes four (4) Tailings Ponds.
-- In-Pit results are presented undiluted within Whittle-optimized pit
shells. The estimate includes 60 gold-bearing zones and a remaining
envelope containing isolated gold intercepts.
-- Underground results are presented undiluted and in situ, outside
Whittle-optimized pitshells. The estimate includes 60 gold-bearing zones
and a remaining envelope containing isolated gold intercepts.
-- Tailings resources were compiled at 0.35, 0.40, 0.45, 0.50, 0.55, 0.60,
0.65, 0.70, 0.80 and 0.9 g/t Au cut-off grades.
-- In-Pit resources were compiled at 0.35, 0.40, 0.45, 0.50, 0.55, 0.60,
0.65, 0.70, 0.80 and 0.9 g/t Au cut-off grades.
-- Underground resources were compiled at 1.5, 2.0, 2.5, 3.0, 3.5, 4.0 and
5.0 g/t Au cut-off grades.
-- Cut-off grades must be re-evaluated in light of prevailing market
conditions (gold price, exchange rate and mining cost).
-- Tailings: A fixed density of 1.45 g/cm 3 was used in mineralized zones
and waste.
-- In-Pit and Underground: A fixed density of 2.73 g/cm was used in
mineralized zones and in the envelope.
-- In-Pit and Underground: A minimum true thickness of 3.0 m. was applied,
using the grade of the adjacent material when assayed, or a value of
zero when not assayed.
-- Tailings: High grade capping was done on the raw data and established at
13.0 g/t Au for Zone 1, 3.5 g/t Au for Zone 2, 1.7 g/t for Zone 3 and
2.2 g/t Au for Zone 4.
-- In-Pit and Underground: High grade capping was done on the raw data and
established at 25.0 g/t Au for diamond drill hole assays and channel
samples assays.
-- Tailings: Compositing was not done over entire drill hole lengths.
Instead, compositing was done on drill hole sections falling within the
mineralized zone envelopes (composite = 0.5 metre).
-- In-Pit and Underground: compositing was not done over entire drill hole
lengths. Instead, compositing was done on drill hole and channel sample
sections falling within the mineralized zone envelopes (composite = 1.0
metres).
-- Resources were evaluated from drill hole and surface channel samples
using an ID2 interpolation method in a block model.
-- The tailings measured and indicated categories were defined based on the
drill hole spacing (measured, zones 1 and 2 = 30m x 30m grid; indicated,
zone 3 = 100m x 100m grid and zone 4 = 200m x 200m grid).
-- The In-Pit measured category is defined by blocks having a volume of at
least 25% within an envelope built at a distance of 10m around existing
channels.
-- The In-Pit and Underground indicated category is defined by the
combination of blocks within a maximum distance of 15m from existing
stopes and blocks for which the average distance to drill hole
composites is less than 45m.
-- Ounce (troy) = Metric Tons x Grade / 31.10348. Calculations used metric
units (metres, tonnes and g/t).
-- The number of metric tonnes was rounded to the nearest hundred. Any
discrepancies in the totals are due to rounding effects; rounding
followed the recommendations in Regulation 43-101.
-- InnovExplo is not aware of any known environmental, permitting, legal,
title-related, taxation, socio-political, marketing or other relevant
issue that could materially affect the Mineral Resource Estimate.
-- Whittle parameters used: Mining cost=$2.40 USD per tonne mined, milling
cost=$13.46 USD per tonne milled, G&A=$4.18 USD per tonne milled, Gold
price=$1,445 USD (exchange rate @ Cdn1.01$ equal to US$1.00), mining
recovery=90.9%, milling recovery=93.9%, pit slope 52 degrees


Pre-Feasibility Study


Clifton Star has started a Pre-Feasibility Study on the Duparquet Project that will incorporate the results of this new resource estimate as well as the results of the Pilot Plant tests recently completed at SGS Lakefield.


Qualified Persons:


The overall content in this news release has been prepared, reviewed and approved by Louis C. Martin, P. Geo., Vice president Exploration of Clifton Star Resources Inc., who is a Qualified Person as defined under Regulation 43-101 guidelines.


The Resources Estimate was prepared by Carl Pelletier, B. Sc., P.Geo., Kenneth Williamson, M Sc., P.Geo, and Karine Brousseau, P. Eng. (InnovExplo Inc.), the Independent and Qualified Persons for the Mineral Resource Estimate, as defined by Regulation 43-101.


Neither the TSX Venture Exchange nor its Regulations Services Provider (as the term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Cautionary Statement on Forward Looking Information


Certain information included in this press release, including any information as to our future exploration, financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute 'forward-looking statements' within the meaning of the 'safe harbor' provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The words 'expect', 'believe', 'will', 'intend', 'estimate' and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, including the possibility that drill programs will not yield the expected results. The Company cautions the reader that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of Clifton Star Resources to be materially different from the Company's estimated future results, performance or achievements expressed or implied by those forward-looking statements and that the forward-looking statements are not guarantees of future performance. These statements are also based on certain factors and assumptions. For more details on these estimates, risks, assumptions and factors, see the Company's most recent Form 20-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements.

Contacts:

Michel F. Bouchard, President and CEO

Clifton Star Resources Inc.
mbouchard@cfo-star.com

418-914-9922
www.cfo-star.com

@cliftonstar1


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Clifton Star Resources Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.