SAS Reports Exploration Drilling Results at the Hislop Pit Complex and Hislop North Drilling Targets

07.08.2013  |  CNW

Canada NewsWire

Hislop Pit Complex returns 3.06 g/t Au over 21.8m, including 5.30 g/t Au over 8.2m; and 7.01 g/t Au over 8.1m


Hislop North returns 4.43 g/t Au over 20.2m (5.25 g/t Au uncut), including 12.81 g/t Au over 3.8m (16.44 g/t Au uncut)

TORONTO, Aug. 7, 2013 /CNW/ - St Andrew Goldfields Ltd. (TSX-SAS) (OTCQX-STADF), ("SAS" or the "Company") is pleased to announce recent drill results from the Hislop North Project ("Hislop North"), northwest of the Hislop Mine and the Hislop Pit depth extension drilling ("Hislop Pit Complex").

HIGHLIGHTS OF DRILLING RESULTS

Hislop Pit Complex

  • HP13-010: 3.06 g/t Au over 21.8 metres including 5.30 g/t Au over 8.2 metres

  • HP13-017: 3.37 g/t Au over 17.6 metres including 15.60 g/t Au over 2.2 metres

  • HP13-033: 7.01 g/t Au over 8.1 metres including 20.30 g/t Au over 1.5 metres


Hislop North

  • H13-003A: 4.43 g/t Au over 20.2 metres (5.25 g/t Au over 20.2 metres uncut) including 12.81 g/t Au over 3.8 metres (16.44 g/t Au over 3.8 metres uncut)

  • H13-013: 8.32 g/t Au over 6.4 metres including 13.42 g/t Au over 2.9 metres

Notes:
All lengths at Hislop North and Hislop Pit Complex are reported as core length as true width is not available at this time. Assays are cut to 32.00 g/t Au.

Refer to Figure 1 and 2 for a plan view and longitudinal projection of the Hislop Pit Complex drilling results and Figure 3 for a plan view of Hislop North drilling results.

"The drill program at Hislop, both at the pit and the Hislop North targets continue to return encouraging results", said Jacques Perron, President & CEO of SAS. "Hislop North continues to show the southern strike extension of mineralization onto SAS property. Drilling will re-commence on this area once the pit drilling is completed as this is the higher priority for SAS. At the Pit Complex, drilling continues to confirm that the mineralization continues to depth beneath both pits."

Hislop Pit Complex (Refer to Figure 1 and 2 for a plan view and longitudinal projection of the Hislop Pit Complex drilling results)

Following up on drilling initiated late in 2012 beneath the East and West pits at the Hislop Mine, SAS is pleased to report assay results from 23 holes (8,600 metres), which intersected strongly silicified, sulphidized and mineralized syenite. Phase I drilling consisted of a widely spaced 50 metre by 50 metre drill program aimed at testing for the presence of mineralized extensions down to a depth of 100 metres below the pit bottoms and is now complete.

The drilling highlighted well mineralized intercepts being reported below both the East and West pits. Hole HP13-010 which is situated approximately 75 metres below the bottom of the West Pit, returned 3.06 g/t Au over 21.8 metres, including 5.30 g/t Au over 8.2 metres. The mineralized zone remains open at depth. Drilling below the East Pit returned strong mineralization in Hole HP13-017, which is situated approximately 200 metres below the bottom of the current East Pit, and assayed 3.37 g/t Au over 17.6 metres including 15.60 g/t Au over 2.2 metres,. The mineralized zone remains open at depth.

A second phase of infill drilling under both the East and West pits, designed to provide additional data which would support a resource estimate is nearing completion.

Significant assay intercepts from the recent drilling on the Hislop Pit Complex are summarized in the table below:

Hislop Pit Complex 2013 Surface Drilling Program
Hole
Number
UTM (NAD27) Degrees Intersection (Metres) Core Length Gold Grade
(g/t)
Easting Northing Elevation Azimuth Dip From To (Metres)
HP13-002A 552155 5371429 300 35 -65 268.7 273.0 4.3 10.48
HP13-003 552304 5371717 300 210 -57 327.0 335.2 8.2 1.32
HP13-005 552283 5371646 300 212 -75 280.2 290.1 9.9 1.35
HP13-006 552283 5371646 300 212 -75 294.6 299.3 4.7 2.65
Including 297.8 298.3 0.5 15.94
Including 337.5 352.8 15.3 1.04
HP13-008 552420 5371571 300 212 -55 5.0 33.1 28.1 1.15
Including 5.0 24.9 19.9 1.45
And 62.2 62.8 0.6 8.91
And 208.5 223.0 14.5 2.45
And 211.5 224.0 12.5 2.50
Including 211.5 214.2 2.7 6.84
HP13-009 552420 5371571 300 212 -45 6.0 26.1 20.1 1.25
Including 6.0 13.5 7.5 2.10
And 181.0 186.4 5.4 2.91
Including 181.0 182.7 1.7 7.81
HP13-010 552350 5371612 300 212 -50 179.0 200.8 21.8 3.06
Including 181.0 189.2 8.2 5.30
HP13-011 552350 5371612 300 212 -60 207.0 229.6 22.6 2.76
Including 222.7 227.7 5.0 6.57
HP13-012 552383 5371566 300 212 -65 252.2 260.5 8.3 2.40
HP13-013 552383 5371566 300 212 -55 139.8 143.6 3.8 2.23
HP13-015 552454 5371490 300 212 -50 176.4 187.8 11.4 2.40
Including 182.5 187.8 5.3 4.50
HP13-016 552555 5371242 300 32 -60 153.6 156.7 3.1 3.55
Including 153.6 154.6 1.0 9.57
And 201.7 203.2 1.5 4.33
HP13-017 552629 5371169 300 32 -70 285.6 303.2 17.6 3.37
Including 298.1 300.3 2.2 15.60
Including 292.2 295.2 3.0 3.81
HP13-018 552454 5371490 300 212 -70 239.8 241.3 1.5 5.43
HP13-023 552658 5371140 300 32 -55 316.4 321.0 4.6 3.56
Including 317.1 318.4 1.3 9.37
HP13-025 552704 5371101 300 32 -60 288.0 300.6 12.6 4.14
Including 293.2 296.4 3.2 11.01
HP13-026 553117 5371183 300 212 -55 270.1 277.6 7.5 6.08
Including 273.1 274.6 1.5 11.50
HP13-028 552704 5371101 300 32 -50 244.4 246.4 2.0 3.69
And 306.9 308.8 1.9 2.87
HP13-032 553185 5371116 300 212 -70 107.0 111.5 4.5 3.53
And 235.4 236.9 1.5 5.42
HP13-033 552605 5374485 300 32 -65 256.5 264.6 8.1 7.01
Including 256.5 258.0 1.5 20.30
HP13-035 552775 5371094 300 32 -60 274.9 276.8 1.9 8.00
Including 276.2 276.8 0.6 17.40
HP13-036 553212 5371075 300 212 -50 87.0 90.0 3.0 5.18
HP13-037 552850 5371035 300 32 -70 309.7 311.7 2.0 3.73

Notes: All lengths are reported as core length as true width is not available at this time. Assays are cut to 32.00 g/t.

Hislop North Project (Refer to Figure 3 for a plan view of Hislop North drilling)
Phase 1 drilling along the northern boundary of the Hislop property, which followed up on the southerly strike extensions of the 147 and Grey Fox zones, is now complete with a total of 18 holes and 9,000 metres drilled during this first pass of drilling. SAS is pleased to report near surface intersections over significant widths were intercepted in hole H13-003A, which returned 4.43 g/t Au over 20.2 metres (5.25 g/t Au uncut), including 12.81 g/t Au over 3.8 metres (16.44 g/t Au uncut); and H13-013, which returned 8.32 g/t Au over 6.4 metres, including 13.42 g/t Au over 2.9 metres.

These intercepts are hosted within a brecciated albitic mafic volcanic with significant quartz veining and disseminated pyrite, a style of mineralization that is similar in nature to deposits along strike of the 147, Grey Fox South and Hislop North mineralized trend.

Mineralization remains open at depth and the Company expects to commence with a second phase of drilling on the potential extensions of the 147 and Grey Fox target areas before the end of the year.

Significant assay intercepts from the recent Hislop North drilling are summarized in the table below:

Hislop North 2013 Surface Drilling Program
Hole
Number
UTM (NAD27) Degrees Intersection (Metres) Core Length Gold Grade
(g/t)
Easting Northing Elevation Azimuth Dip From To (Metres)
H13-002 551485 5371985 300 265 -50 400.1 401.1 1.0 9.52
And 461.8 466.0 4.2 1.80
H13-003A 551610 5371985 300 265 -50 37.5 57.7 20.2 4.43
Including 47.6 51.4 3.8 12.81
And 278.3 284.9 6.6 2.00
H13-004 551360 5371885 300 265 -50 62.1 66.1 4.0 2.56
H13-005 551485 5371885 300 265 -50 157.0 159.1 2.1 2.41
And 174.0 175.5 1.5 1.44
And 183.6 184.4 0.8 5.07
H13-008 551485 5371785 300 265 -50 21.0 24.1 3.1 6.28
And 23.2 24.1 0.9 18.20
H13-009 551610 5371785 300 265 -50 59.5 64.4 4.9 1.89
H13-013 551820 5371865 300 265 -50 109.2 115.6 6.4 8.32
Including 112.2 115.1 2.9 13.42

Notes: All lengths are reported as core length as true width is not available at this time. Assays are cut to 32.00 g/t.

Drilling, Assaying and QA/QC
Surface drilling was conducted by Forage Orbit Garant Drilling Services Inc. Analytical work for the Hislop North and Hislop Pit Complex was performed by AGAT Laboratories Limited situated in Mississauga, ON, an accredited lab. SAS employs an industry standard QA/QC program consisting of certified reference standards and blanks that are inserted into the sample stream, which represent approximately 5% of the total sample population.

Qualified Person
The exploration programs on the Company's various mineral properties are under the supervision of Doug Cater, P. Geo, the Company's Vice President of Exploration. Mr. Cater is a qualified person as defined by NI 43-101, and has reviewed and approved this news release.

About SAS
SAS (operating as "SAS Goldmines"), is a gold mining and exploration company with an extensive land package in the Timmins mining district, north-eastern Ontario, which lies within the Abitibi greenstone belt, the most important host of historical gold production in Canada.

SAS owns and operates the Holt, Holloway and Hislop mines which contribute approximately 100,000 ounces of annual gold production. The Company is also advancing the Taylor Project and is conducting a number of exploration programs across 120km of land straddling the Porcupine-Destor Fault Zone.

FORWARD-LOOKING INFORMATION

This news release contains forward-looking information and forward-looking statements (collectively, "forward-looking information") under applicable securities laws, concerning the Company's business, operations, financial performance, condition and prospects, as well as management's objectives, strategies, beliefs and intentions. Forward-looking information is frequently identified by such words as "may", "will", "plan", "expect", "estimate", "anticipate", "believe", "intend" and similar words referring to future events and results, including in respect of the extent, timing, objectives and interpretation of exploration programs at the Hislop Pit Complex and Hislop North Project, and the completion of a resource estimate on the Hislop Pit Complex.

This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information. Factors that may cause actual results to vary materially include, but are not limited to, unanticipated operational or technical difficulties which could increase the time necessary to complete the development initiatives, escalate operating and/or capital costs and reduce anticipated production levels; uncertainties relating to the interpretation of the geology, continuity, grade and size estimates of the mineral reserves and resources; the Company's dependence on key employees and changes in the availability of qualified personnel; fluctuations in gold prices and exchange rates; operational hazards and risks, including the inability to insure against all risks; changes in laws and regulations; and changes in general economic conditions. Such forward looking information is based on a number of assumptions, including in respect of the ability to achieve operating cost estimates, the volatility and level of the price of gold including that the gold price will generally remain within a reasonable range of current levels, the accuracy of reserve and resource estimates and the assumptions on which such estimates are based, the sufficiency of the Company's cash flow and financial reserves to carry out its planned programs, the ability to attract and retain qualified personnel to conduct its exploration programs and operate its mines and general business and economic conditions. Should one or more risks and uncertainties materialize or should any assumptions prove incorrect, then actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, readers are cautioned not to place undue reliance on this forward-looking information. SAS does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws. A further description of the risks and uncertainties facing the Company may also be found in the Company's Annual Information Form available on SEDAR at www.sedar.com.

SOURCE St Andrew Goldfields Ltd.

Image with caption: "Figure 1 - Hislop Pit Complex Plan View (CNW Group/St Andrew Goldfields Ltd.)". Image available at: http://photos.newswire.ca/images/download/20130807_C4224_PHOTO_EN_29525.jpg

Image with caption: "Figure 2 - Hislop Pit Complex Longitudinal Projection (CNW Group/St Andrew Goldfields Ltd.)". Image available at: http://photos.newswire.ca/images/download/20130807_C4224_PHOTO_EN_29527.jpg

Image with caption: "Figure 3 - Hislop North Project - Plan View (CNW Group/St Andrew Goldfields Ltd.)". Image available at: http://photos.newswire.ca/images/download/20130807_C4224_PHOTO_EN_29526.jpg



Contact

about St Andrew Goldfields Ltd., please contact:
Tel: 1-800-463-5139 or (416) 815-9855; Fax: (416) 815-9437; Website: www.sasgoldmines.com

Suzette N Ramcharan
Director, Investor Relations
sramcharan@sasgoldmines.com

Jacques Perron
President & CEO
jperron@sasgoldmines.com

Ben Au
CFO, VP Finance & Administration
bau@sasgoldmines.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
St Andrew Goldfields Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.