• Freitag, 20 Dezember 2024
  • 13:31 Uhr Frankfurt
  • 12:31 Uhr London
  • 07:31 Uhr New York
  • 07:31 Uhr Toronto
  • 04:31 Uhr Vancouver
  • 23:31 Uhr Sydney

Clifton Star Intersects 2.46 g/t Au Over 18.5 m and 2.50 g/t Au Over 17.0 m, at the Duparquet Project

21.08.2013  |  Marketwire

QUEBEC CITY, QUEBEC--(Marketwired - Aug 21, 2013) - Clifton Star Resources Inc. ("the Company" or "Clifton Star") (TSX VENTURE:CFO)(FRANKFURT:C3T) is pleased to release the assay results for an additional 36 drill holes from its 2013 Duparquet Project drill program. Clifton Star continues to obtain positive assay results from its drill program.

The drill holes listed in this press release were not included in the recently published (June 28, 2013) NI 43-101 resource estimate update, as they were completed after the May 6th cut-off date.

Drill Highlights include:

  • Hole BD13-23 with 18.5 metres grading 2.46 g/t Au.

  • Hole BD13-25 with 17.0 metres grading 2.50 g/t Au.

  • Hole BD13-27 with 72.0 metres grading 1.14 g/t Au.

  • Hole BD13-34 with 15.0 metres grading 2.27 g/t Au.

  • Hole D13-20 with 21.9 metres grading 1.55 g/t Au.

  • Hole D13-21 with 15.6 metres grading 2.22 g/t Au.

  • Hole D13-27 with 43.5 metres grading 1.31 g/t Au.

Diamond Drilling Program

The results from 36 drill holes are listed in Table 1 (Click here to see Table 1). During this recent phase of drilling approximately 25% of the drill holes tested the mineralization within the current pit shells in order to upgrade the category of the resource, while the remaining 75% of the drill holes were drilled outside of the current pit shells in order to follow and extend interpreted mineralized zones (Click here to see Figure 1).

Drill holes BD13-25, D13-20 and D13-21 were drilled within the current resource and pit shells, upgrading the current resource. Drill holes BD13-23 (2.46 g/t Au / 18.5 m), BD13-27 (1.14 g/t Au / 72.0 m) and BD13-34 (2.27 g/t / 15m.) were all drilled within 5 to 25 metres from the edge of the current pit shell, potentially expanding the west pit shell. Hole D13-27 (1.31 g/t Au over 43 .5m) was drilled approximately 40 meters outside of the pit shell on the Donchester property, extending the mineralized envelope to the southeast. The true thicknesses of the intersections are typically 60% to 70% of the core lengths.

Clifton Star is pleased with these assay results, within and surrounding the pit shells, and that the mineralization remains open along strike and at depth. New drilling results are also expected to be available for publication in the coming weeks.

2013 Activities

Clifton Star has just completed drilling at Duparquet, having fulfilled its drilling objective of 20,000 meters for 2013.

The Company has completed its Pilot Plant tests with SGS Minerals in Lakefield, Ontario and is currently waiting for the final analysis and environmental work on the tailings. These metallurgical tests examined the POX (Pressure Oxidization) flow sheet as used in the recently released PEA, as well as the potential to produce saleable Gold Concentrates as an alternative process.

Clifton Star continues to advance the Pre-Feasibility Study on the Duparquet Project that will incorporate the results of the new resource estimate (June 28, 2013) and the Pilot Plant tests.

Technical Information and Qualified Persons

Diamond drill holes are drilled to recover NQ size core. The core samples are logged and sampled prior to being transported directly by the Company to Activation Laboratories Ltd. (Ste-Germaine de Boule), an independent accredited laboratory, for assay analyses. The assay analyses performed during Clifton's drill programs are subject to a formal quality assurance and quality control (QA/QC) program, with standard reference materials, blanks, and field duplicate samples inserted prior to shipment from site to monitor the quality control of the data. Samples with higher grade gold (greater than 10 grams per tonne) are re-assayed using a gravimetric and/or pulps and metallic procedure. All gold results reported are cut, with individual assays greater than 25 grams per tonne cut to 25 grams.

Clifton's exploration team designed and executed the 2013 drilling program under the supervision of Clifton Star's Vice President of Exploration, Mr. Louis Martin. The content of this news release has been written and approved by Mr. Louis Martin, P.Geo, a Qualified Person as defined by National Instrument 43-101.

Neither the TSX Venture Exchange nor its Regulations Services Provider (as the term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement on Forward Looking Information

Certain information included in this press release, including any information as to our future exploration, financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute 'forward-looking statements' within the meaning of the 'safe harbor' provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The words 'expect', 'believe', 'will', 'intend', 'estimate' and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, including the possibility that drill programs will not yield the expected results. The Company cautions the reader that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of Clifton Star Resources to be materially different from the Company's estimated future results, performance or achievements expressed or implied by those forward-looking statements and that the forward-looking statements are not guarantees of future performance. These statements are also based on certain factors and assumptions. For more details on these estimates, risks, assumptions and factors, see the Company's most recent Form 20-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements.



Contact

Michel F. Bouchard
President and CEO
Clifton Star Resources Inc.
mbouchard@cfo-star.com
418-914-9922
www.cfo-star.com / @cliftonstar1


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Clifton Star Resources Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.