Contango ORE Announces Initial Results of 2013 Exploration Program
In general, all of the 2013 holes intercepted a 100 to 125 foot wide zone of mineralization. The drill intervals in holes 13062-064 represent infill drilling while those from holes 13066 to 069 represent infill and expansion drilling. See map below for drilling locations. The early results of our 2013 drilling program indicate that the previously identified Peak zone will be extended along both strike and dip relative to the known limits from previous drilling.
Mr. Brad Juneau, President of the Company, said, “The preliminary results of our 2013 exploration program at our Tetlin project continue to meet our expectations in terms of gold, silver, and copper grade as well as thickness. Our goal is to identify sufficient mineral resources by the end of 2013 to justify initial reviews of economic and engineering parameters on the project. We expect to be drilling continuously with a two-rig program throughout the rest of the summer and early fall in an attempt to delineate the limits of the Peak Zone as well as test additional exploration prospects. We are awaiting final interpretations of new airborne geophysical data we acquired earlier this summer before selecting our exploratory drilling sites, anticipated to be in late July.”
Contango ORE has taken additional mining claims this spring in the vicinity of Tok, AK covering 40,200 acres. These claims were selected based on proximity to known mineral occurrence, access to existing infrastructure, and which complement our existing exploration program in terms of leveraging our local knowledge based on our exploration results to date. We have initiated exploration activities on these new claims.
Contango ORE, Inc. (CORE) is a Houston-based company that engages in the exploration in Alaska for gold and associated minerals and rare earth elements. Additional information can be found on our web page at www.contangoore.com.
This press release contains forward-looking statements regarding CORE that are intended to be covered by the safe harbor “forward-looking statements” provided by the Private Securities Litigation Reform Act of 1995, based on CORE’s current expectations and includes statements regarding future results of operations, quality and nature of the asset base, the assumptions upon which estimates are based and other expectations, beliefs, plans, objectives, assumptions, strategies or statements about future events or performance (often, but not always, using words such as “expects”, “projects”, “anticipates”, “plans”, “estimates”, “potential”, “possible”, “probable”, or “intends”, or stating that certain actions, events or results “may”, “will”, “should”, or “could” be taken, occur or be achieved). Forward-looking statements are based on current expectations, estimates and projections that involve a number of risks and uncertainties, which could cause actual results to differ materially from those, reflected in the statements. These risks include, but are not limited to: the risks of the exploration and the mining industry (for example, operational risks in exploring for, developing mineral reserves; risks and uncertainties involving geology; the speculative nature of the mining industry; the uncertainty of estimates and projections relating to future production, costs and expenses; the volatility of natural resources prices, including prices of gold and rare earth elements; the existence and extent of commercially exploitable minerals in properties acquired by CORE; potential delays or changes in plans with respect to exploration or development projects or capital expenditures; the interpretation of exploration results and the estimation of mineral resources; the loss of key employees or consultants; health, safety and environmental risks and risks related to weather and other natural disasters); uncertainties as to the availability and cost of financing; inability to realize expected value from acquisitions; inability of our management team to execute its plans to meet its goals; and the possibility that government policies may change or governmental approvals may be delayed or withheld, including the inability to obtain any mining permits. Additional information on these and other factors which could affect CORE’s exploration program or financial results are included in CORE’s other reports on file with the Securities and Exchange Commission. Investors are cautioned that any forward-looking statements are not guarantees of future performance and actual results or developments may differ materially from the projections in the forward-looking statements. Forward-looking statements are based on the estimates and opinions of management at the time the statements are made. CORE does not assume any obligation to update forward-looking statements should circumstances or management’s estimates or opinions change.
Table 1
Significant 2013 gold drill results from initial drill holes at the Peak zone, Chief Danny prospect, Tetlin project, Alaska. Sample intervals are calculated using a 0.5 gpt lower cut off for gold with no internal waste greater than 3 meters less than cutoff grade. Intercepts shown are drill intercept lengths. All holes reported were completed at -60 degree inclination along azimuth 225 degrees to intercept mineralization at approximately right angles. The grade cutoff for gold (Au) is 0.5 gpt; for silver (Ag) is 10 gpt; and for copper (Cu) is 0.1 gpt.
Num Drill Hole From_m To_m Int_m Au_opt Au_gpt Ag_gpt Cu_pct
1 TET13062 6.10 9.10 3.00 0.037 1.265 6.9 0.106
2 TET13062 79.40 80.80 1.40 0.052 1.783 1.1 0.031
3 TET13062 83.20 85.10 1.90 0.024 0.822 0.9 0.026
4 TET13062 88.90 153.70 64.80 0.382 13.101 21.0 0.482
5 including 109.70 118.90 9.20 0.923 31.640 28.5 0.711
6 including 115.40 116.20 0.80 2.013 69.000 72.5 1.785
7 and 125.80 126.50 0.70 1.286 44.100 52.1 0.836
8 and 128.10 133.70 5.60 0.985 33.774 56.5 0.833
9 including 132.80 133.70 0.90 1.394 47.800 172.0 3.260
10 TET13063 131.11 171.60 40.49 0.483 16.550 36.1 0.732
11 including 146.00 148.65 2.65 2.365 81.100 178.0 3.920
12 and 153.35 155.14 1.79 1.671 57.300 121.0 0.762
13 TET13064 89.10 95.10 6.00 0.007 0.257 26.5 0.325
14 including 91.00 93.20 2.20 0.017 0.591 59.9 0.691
15 TET13064 120.50 122.90 2.40 0.016 0.549 9.2 0.202
16 TET13064 147.20 152.20 5.00 0.043 1.487 1.9 0.052
17 TET13064 156.60 189.40 32.80 0.310 10.638 6.4 0.198
18 including 163.00 166.50 3.50 1.213 41.586 15.3 0.461
19 including 163.70 164.80 1.10 2.225 76.300 19.2 0.499
20 and 171.00 173.60 2.60 0.712 24.400 13.4 0.494
21 and 174.30 177.70 3.40 0.590 20.212 7.5 0.323
22 and 181.50 183.50 2.00 0.680 23.300 8.4 0.295
23 TET13065 157.60 159.10 1.50 0.039 1.325 3.4 0.110
24 TET13065 184.45 206.93 22.48 0.034 1.160 10.5 0.403
25 including 186.55 188.47 1.92 0.125 4.270 15.6 0.705
26 and 203.00 204.50 1.50 0.153 5.240 40.7 1.290
27 TET13067 104.60 110.30 5.70 0.001 0.037 5.9 0.263
28 TET13067 114.80 125.10 10.30 0.005 0.180 18.2 0.215
29 TET13068 0.00 48.80 48.80 0.011 0.365 23.1 0.269
30 including 6.10 21.00 14.90 0.031 1.062 47.6 0.212
31 TET13068 54.90 79.20 24.30 0.004 0.148 10.0 0.312
32 TET13068 82.30 91.40 9.10 0.001 0.029 9.7 0.644
33 including 88.80 91.40 2.60 0.002 0.057 25.9 1.450
34 TET13068 94.50 98.30 3.80 0.000 0.002 2.6 0.224
35 TET13068 103.70 112.80 9.10 0.001 0.033 4.0 0.160
36 TET13068 128.40 132.30 3.90 0.000 0.002 1.2 0.120
37 TET13068 137.20 140.20 3.00 0.001 0.030 7.6 0.234
38 TET13069 54.60 63.70 9.10 0.000 0.000 3.6 0.106
39 TET13069 72.90 122.60 49.70 0.001 0.032 10.9 0.538
40 including 86.60 94.80 8.20 0.002 0.074 23.8 1.373
41 TET13069 136.70 141.35 4.65 0.000 0.004 4.5 0.133
42 TET13069 158.60 162.63 4.03 0.006 0.214 124.1 3.055
43 including 160.60 161.09 0.49 0.026 0.882 343.0 7.260
Contacts
Contango ORE, Inc.
Brad Juneau
713-621-7325
www.contangoore.com