• Sonntag, 25 August 2024
  • 01:20 Uhr Frankfurt
  • 00:20 Uhr London
  • 19:20 Uhr New York
  • 19:20 Uhr Toronto
  • 16:20 Uhr Vancouver
  • 09:20 Uhr Sydney

DNI's Preliminary Economic Assessment Technical Report for its Buckton Polymetallic Black Shale Deposit, Alberta, Filed to Sedar

17.01.2014  |  CNW

(DNI : TSX-Ven)
(DG7 : Frankfurt)

TORONTO, Jan. 17, 2014 /CNW/ - DNI Metals Inc. (DNI:TSX-Ven)(DG7:FSE) announces that the independent NI 43-101 Preliminary Economic Assessment Technical Report for its polymetallic Buckton Deposit (the "PEA"), Alberta, has been completed and filed to Sedar.

A summary of findings from the PEA were announced in a press release issued December 5, 2013. The full report, "Preliminary Economic Assessment For The Buckton Deposit, SBH Property, North-East Alberta", dated January 17, 2014, with an effective date of December 5, 2013, prepared by P&E Mining Consultants Inc., Apex Geoscience Ltd. and Cron Metallurgical Engineering Ltd., can be obtained from www.sedar.com and from DNI's website www.dnimetals.com.

As announced, the PEA demonstrates that the Buckton Deposit has the potential to be a significant supplier of Uranium and REE. The mining design is a low strip ratio, high tonnage co-production of Ni-U-Zn-Cu-Co-REE-Y from the Labiche and Second White Speckled formations. The metals extraction design basis, as formulated by Hatch Ltd. for the PEA, is bio-heap leaching, followed by metals extraction from the leach solution, and a process plant for separating purified individual REE oxides. The projected average annual production capacity is approximately 1 million pounds of uranium yellowcake and 5,500 tonnes of rare earth oxides, of which over 40% are made up of heavy rare earth elements. The PEA also identified a number of key opportunities which can significantly enhance economics through strategic cost reductions and/or revenue enhancements, some of which can be achieved with minimal additional testwork.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

DNI - TSX Venture
DG7 - Frankfurt
Issued: 74,857,022

SOURCE DNI Metals Inc.



Contact

DNI Metals Inc. - Shahe Sabag, President & CEO or Denis Clement, Chairman - 416-595-1195
email ir@dnimetals.com. Also visit www.dnimetals.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
DNI Metals Inc.
Bergbau
A1W190
CA23327V2084

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.