Copper Mountain announces 2014 second quarter results

11.08.2014  |  CNW

Web Site: www.CuMtn.com
TSX: CUM



This release should be read with the unaudited financial statements and management's discussion and analysis available at www.cumtn.com and filed on www.sedar.com. Our financial results are prepared in accordance with IFRS and expressed in Canadian dollars, unless otherwise noted. Sales and production volumes for the Company's 75%-owned Copper Mountain mine are presented on a 100% basis unless otherwise indicated.

 

VANCOUVER, Aug. 11, 2014 /CNW/ - Copper Mountain Mining Corp. (TSX: CUM) (the "Company" or "Copper Mountain") announces sales of 18 million pounds of copper, 6,300 ounces of gold and 94,900 ounces of silver to produce revenues of $68 million after pricing adjustments and treatment charges, including a $5.8 million positive pricing adjustment for the three months ended June 30th, 2014.  


Second Quarter 2014 Highlights (100% Basis)

  • The Company achieved record production for the 2014 second quarter at Copper Mountain Mine with 19.9 million pounds of copper, 5,000 ounces of gold and 113,300 ounces of silver being produced. This represents a 27% increase in copper production above the same period last year.
  • Mill throughput averaged 30,477 tpd which was a 4% improvement from the 2014 first quarter
  • Mining rates improved with the addition of two additional trucks and the dispatch system. The mining rate set a new record in June which averaged 200,000 tonnes of material moved per day.  
  • Revenues for the quarter were $68.0 million including positive pricing adjustments of $5.8 million
  • EBITDA1 was  $25.3 million for the quarter ended June 30th, 2014.
  • Gross profit totaled $10.4 for the three months ended June 30th, 2014.
  • Earnings attributable to shareholders of the company were $9.5 million or $0.08 per share.
  • Site cash costs for the 2014 second quarter were US$1.63 per pound of copper produced net of precious metal credits.
  • Total cash costs for the period was US$2.27 per pound of copper sold net of precious metal credits and after all off-site charges.
  •  Realized prices on metal sales were $3.08 per pound of copper, $1,293 per ounce of gold and $19.62 per ounce of silver.

Jim O'Rourke, President and CEO of Copper Mountain, remarked "This quarter marks our 7th consecutive quarter of improved copper production. Copper production remains on track to meet guidance levels of 80-90 million pound of copper for the 2014 fiscal year. During this quarter, mill throughput continued to improve as a result of increasing the amount of minus 2 inch ore entering the SAG mill by utilizing the contract crushing and portable crushing measures. These temporary initiatives will be discontinued and dismantled shortly".

Mr. O'Rourke continued, "The $40 million secondary crusher project has reached mechanical completion on schedule and budget,. Commissioning is underway and the first ore was processed during the first week of August. The new crusher has been tested at its 70% range and has operated well at 2,600tpoh."

___________________

1Earnings before interest, taxes, depreciation, and amortization. Refer to the Non-GAAP Performance measures section of this MD&A

Summary Financial Results


Three months ended

June 30,

Six months ended

June 30,

(CDN$, except for cash cost data in US$)

2014

$

2013

$

2014

$

2013

$






Revenues

68,033,648

45,698,504

129,215,920

100,792,325

Gross profit

10,392,636

(1,634,959)

11,488,712

6,429,449

Operating income (loss)

7,735,877

(2,625,165)

5,797,731

3,684,334

Adjusted earnings2

(1,793,510)

1,527,901

4,930,619

9,372,195

Net income (loss)

13,307,852

(12,083,649)

(2,311,940)

(14,355,559)

Earnings (loss) attributable to shareholders of the Company

 

9,458,355

 

(14,766,979)

(2,695,985)

(17,041,754)

Earnings (loss) per share3

0.08

(0.15)

(0.02)

(0.17)

Adjusted earnings (loss) per share4

(0.02)

0.02

0.04

0.10

EBITDA

25,322,416

(3,004,792)

20,081,687

4,456,917

Cash Flow from operating activities before working capital items

17,447,551

5,892,912

26,056,212

18,514,409






Cash and cash equivalents



20,213,980

6,983,156

Working capital



27,995,507

(1,699,149)

Equity



299,365,314

243,043,981






Copper produced (lbs)

19,900,000

15,700,000

39,000,000

29,900,000

Gold produced (oz)

5,000

5,600

10,500

11,000

Silver produced (oz)

113,300

71,000

218,600

135,000






Copper sold (lbs)

18,000,000

14,700,000

37,800,000

29,800,000

Gold sold (oz)

6,300

5,400

12,800

11,300

Silver sold (oz)

94,900

66,000

193,600

135,000

Site cash costs per pound of copper produced (net of gold, silver credits) (US$)

1.63

1.81

1.64

1.72

Total cash costs per pound of copper sold (net of gold, silver credits) (US$)

2.27

2.32

2.18

2.25

 

Copper Mountain Mine

During the second quarter, the mine shipped 35,900 wmt of concentrate containing 18 million pounds of copper to Japan for smelting and recorded revenues, net of smelter charges and pricing adjustments, of $68 million, realizing a gross profit of $10.4 million.  The total cash cost of copper sold for the three months ended June 30, 2014 was US$2.27 per pound of copper after gold and silver by-product credits.

During the second quarter, the Copper Mountain Mine achieved record copper production. Total production for the three months ended June 30 , 2014 was 19.9 million pounds of copper, 5,000 ounces of gold and 113,300 ounces of silver. This represents a 27% growth in copper production from the same period last year.

SAG Mill throughput improved during the quarter with a total of 2.7 million tonnes of ore being milled at an average grade of 0.39% copper, as compared to 2.5 million tonnes of ore being milled at an average grade of 0.33% copper in the second quarter of 2013, an increase in tonnage of 7.4%.  The mill achieved a 90% operating time during the quarter and copper production was in line with guidance.

Construction of the new permanent secondary crusher facility was completed on schedule and on budget.  All major equipment has been installed and construction is considered complete.  The new secondary crusher received its first ore during the first week of August and since then the crusher operated well at 2,600 tpoh.With the contribution of the new crusher during it's commissioning the SAG mill throughput averaged 34,442 tpd during the first week of August.

Mining activities continued on the stage two pushback of Pit 3, while mining activities in the Pit 2 area were focused on the southwest pushback of the Pit.  During the quarter a total of 16.1 million tonnes of material was mined, including 4.6 million tonnes of ore and 11.5 million tonnes of waste. The projected life of mine strip ratio is 2 to 1 but higher in the early years.  The mine moved an average of approximately 174,000 tonnes of material per day during the quarter. With the addition of two new haul trucks that were commissioned in May and the new dispatch system productivity increased to the 200,000 tpd capacity level in June. The mining fleet continues to have excellent mechanical availability.

___________________________

2Adjusted earnings (loss) is a non-GAAP financial measure which removes unrealized gains/losses on interest rate swaps, pricing adjustments on concentrate metal sales and foreign currency gains/losses.
3Calculated based on weighted average number of shares outstanding under the basic method based on earnings attributable to shareholders.
4Calculated based on weighted average number of shares outstanding under the basic method based on adjusted earnings.

 

Listed below are a summarized balance sheet and income statement as well as conference call in details:

Summarized Balance Sheet



June 30,

2014

$


December  31,

2013

$


Assets



Cash

20,213,980

42,281,137

Accounts Receivable and prepaids

22,287,541

17,953,700

Inventory

34,682,515

26,789,416

Property, plant and equipment

553,589,887

531,890,214

Other Assets

52,939,670

44,166,934


683,713,593

663,081,401

Liabilities



Current liabilities

49,188,529

44,374,657

Decommissioning and restoration provision

7,338,736

6,245,963

Interest rate swap liability

6,666,291

6,364,019

Long-term debt

314,363,836

311,241,671

Deferred tax liability

6,790,887

6,354,461


384,348,279

374,580,771

Equity



Share capital

188,298,205

186,291,105

Contributed surplus

10,832,476

9,662,977

Retained earnings

12,596,044

15,292,029

Non-controlling interest

87,638,589

77,254,519

Total equity

299,365,314

288,500,630


683,713,593

663,081,401

 

Summarized Income Statement


Three months ended

June 30,

Six months ended

June 30,

(CDN$)

2014

$

2013

$

2014

$

2013

$

Revenues

68,033,648

45,698,504

129,215,920

100,792,325

Cost of sales5

(57,641,012)

(47,333,463)

(117,727,208)

(94,362,876)

Gross profit (loss)

10,392,636

(1,634,959)

11,488,712

6,429,449






Other income and expenses





General and administration

(1,286,649)

(1,032,273)

(2,914,311)

(2,729,140)

Share based compensation

(1,370,110)

42,067

(2,776,670)

(15,975)

Operating income (loss)

7,735,877

(2,625,165)

5,797,731

3,684,334






Pricing adjustments on concentrate and metal sales

(5,781,614)

5,353,368

4,083,319

9,500,117

Finance income

134,276

85,943

156,987

185,424

Finance expense

(2,612,281)

(2,203,677)

(4,670,992)

(4,302,996)

Current resource tax expense

(265,711)

(120,016)

(390,056)

(417,425)

Deferred income and resource tax recovery (expense)

(1,004,057)

1,037,448

(46,370)

722,741

Adjusted (loss) earnings6

(1,793,510)

1,527,901

4,930,619

9,372,195






Pricing adjustments on concentrate and metal sales

5,781,614

(5,353,368)

(4,083,319)

(9,500,117)

Unrealized gain (loss) on interest rate swap

(1,573,046)

2,264,371

(2,504,940)

2,554,208

Unrealized gain (loss) on foreign exchange

10,892,794

(10,522,553)

(654,300)

(16,781,845)

Net Income (loss) comprehensive income(loss) for the period

13,307,852

(12,083,649)

(2,311,940)

(14,355,559)






Net income (loss) and comprehensive income (loss) attributable to:





Shareholders of the company

9,458,355

(14,766,979)

(2,695,985)

(17,041,754)

Non-controlling interest

3,849,497

2,683,330

384,045

2,686,195


13,307,852

(12,083,649)

(2,311,940)

(14,355,559)






Earnings (loss) per share

0.08

(0.15)

(0.02)

(0.17)

Adjusted (loss) earnings per share

(0.02)

0.02

0.04

0.10

 

The full set of financial statements and accompanying MD&A are posted on Sedar.com.

About Copper Mountain Mining Corporation:
Copper Mountain's flagship asset is the Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns 25% of the mine. The Copper Mountain mine commenced production in the summer of 2011 and has continued to improve its operations since startup.  The 18,000 acre site has a large resource of copper that remains open laterally and at depth. The mine has significant exploration potential that will need to be explored over the next few years to fully appreciate the properties full development potential.  Additional information is available on the Company's web site at www.CuMtn.com

__________________________

5Cost of sales consists of direct mining and milling costs (which include mine site employee compensation and benefits, mine site general and administrative costs, non-capitalized stripping costs, maintenance and repair costs, operating supplies and external services), depreciation and offsite transportation costs.

6Adjusted earnings (loss) is a non-GAAP financial measure which excludes unrealized gains/losses on derivative instruments, changes in fair value of financial instruments, foreign currency gains/losses, pricing adjustments related to metal sales and non-recurring transactions.


A conference call and audio webcast will be held on Monday August 11th, 2014 at 7:30 am (Pacific Standard Time) for management to discuss the 2014 second quarter results. This discussion will be followed by a question-and-answer period with investors.

 

Live Dial-in information
Toronto and international: 416-764-8688
North America (toll-free):    888-390-0546
To participate in the webcast live via your computer go to: http://www.newswire.ca/en/webcast/detail/1384467/1535799

Replay call information
Toronto and international: 416-764-8677,  passcode  129123
North America (toll-free): 888-390-0541,  passcode  129123

The conference call replay will be available from 10:30  am (PST) on August 11, 2014  until 11:59 pm PST on August 25, 2014
Participant audio webcast will also be available on the company's website  http://www.cumtn.com

 

On behalf of the Board of

COPPER MOUNTAIN MINING CORPORATION

"Rod Shier"                                                                                                                      

Rodney A. Shier, CA.
Chief Financial Officer

Note: This release contains forward-looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results.  Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.  The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.

SOURCE Copper Mountain Mining Corp.



Contact
Galina Meleger, Corporate Communications 604-682-2992 ext.224 Email: Galina@CuMtn.com or Rod Shier, Chief Financial Officer 604-682-2992 ext.222 Email: Rod@CuMtn.com; Website: www.CuMtn.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Copper Mountain Mining Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.