• Freitag, 22 November 2024
  • 11:06 Uhr Frankfurt
  • 10:06 Uhr London
  • 05:06 Uhr New York
  • 05:06 Uhr Toronto
  • 02:06 Uhr Vancouver
  • 21:06 Uhr Sydney

Adamera Provide Update on Drilling and Exploration Program

23.09.2014  |  The Newswire


Vancouver, BC / TNW-ACCESSWIRE / Sept 23, 2014 / Adamera Minerals Corp. (TSX V: ADZ) has completed the first phase of exploration on its 100% owned gold projects in Washington State. Work on the projects included more than 1800 soil samples, 400 rock samples, 11 trenches, 50,000 line metres of magnetic surveying, 3000 line metres of SP and resistivity surveying and 12 drill holes. The Company is currently receiving, compiling and interpreting the geophysical and geochemical data on all projects. Results will be announced as soon as the geological interpretation of these results has been completed.

The Phase two exploration program will include diamond drilling on the two most advanced projects, Oversight and Flag Hill as well as continuing to advance the Poland China and Empire Creek projects with lightweight drilling, trenching and geochemical sampling.

"Our low-cost method of exploration has allowed us to work continuously over the year to advance projects. Finding the mineralized zone on our Oversight project which appears to be part of a previously mined system is definitely a priority and warrants drilling with a larger drill," says Mark Kolebaba, President of Adamera Minerals.

About Adamera

Adamera is exploring for high-grade gold near an operating mill in Washington State owned by Kinross Gold Corp. The mill is reported to be operating at half capacity with ore shipped 70 kilometres from the 1.3 million ounce Buckhorn Mine. The Buckhorn Mine is a high grade, low-cost producer with less than 2 years mine life remaining. Adamera is currently exploring five projects with high-grade gold potential within hauling distance of the Mill.

On behalf of the Board of Directors,

Mark Kolebaba

President & CEO

For additional information please contact:

Heather Kays

Manager, Corporate Communications

Tel: (604) 689-2010

Fax: (604) 484-7143

Email: info@Adamera.com

Website: www.Adamera.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy
of this release. Statements in this press release, other than purely historical information, including statements
relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.

Copyright (c) 2014 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Adamera Minerals Corp.
Bergbau
A40EWL
CA00547Y2042
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.