Rio Alto Mining Limited Produces 56,368 Ounces of Gold in Q3 2014

06.10.2014  |  Marketwire
VANCOUVER, BRITISH COLUMBIA -- (Marketwired - Oct 6, 2014) - Rio Alto Mining Limited ("Rio Alto" or the "Company") (TSX:RIO) (LMA:RIO) (NYSE:RIOM) is pleased to announce that its La Arena Gold Mine produced 56,368 ounces of gold during the three months ended September 30, 2014 (59,157 ounces of gold poured for the three months ended September 30, 2013).

164,347 ounces have been produced at La Arena during the nine months ended September 30, 2014 compared with 143,940 ounces for the nine months ended September 30, 2013.

"Currently mining operations at La Arena are exceeding all operational KPI's (Key Performance Indicators) set by management. This performance is a testament to the quality and focus of our management team under the leadership of COO, Eduardo Loret De Mola. Cost optimization activities are translating to the mine's key performance metrics which in turn, are expected to result in peer leading cash operating costs in Q3", commented Alex Black, President & CEO.

Ore and waste production from the La Arena Gold Mine for the third quarter of 2014 is summarized as follows:

Actual
Planned
Difference
Dry
Tonnes
Au
gpt
Strip
Ratio
Dry
Tonnes
Au
gpt
Strip
Ratio
Tonnes/Ozs Au
gpt
Ore mined 4,443,413 0.47 0.86 3,134,973 0.64 1.61 1,308,440 (0.17 )
Waste mined 3,818,882 5,030,845 (1,211,963 )
Ounces poured 56,368 54,923 1,455


Gold production came in ahead of expectation for the quarter due to a 1,308,440 positive difference in tonnes mined, partially offset by a negative grade difference of 0.17 gpt. The strip ratio was 47% below budget due to a reduction of mine operating costs that in turn, have resulted in the lowering of the mining cut-off grade.

Ore and waste production for Q3 2014 compared to Q3 2013 is summarized as follows:
Q3 2014
Q3 2013
Difference
Dry
Tonnes
Au
gpt
Strip
Ratio
Dry
Tonnes
Au
gpt
Strip
Ratio
Tonnes/Ozs Au
gpt
Ore mined 4,443,413 0.47 0.86 4,996,298 0.58 1.12 (552,885 ) (0.11 )
Waste mined 3,818,882 5,595,440 (1,776,558 )
Ounces poured 56,368 59,157 (2,789 )


Gold production in Q3 2014 was 2,789 ounces less than the corresponding period of 2013 due to both lower ore production and a decline in grade of 0.11 gpt. The strip ratio declined materially by 23% in q3 2014 on a year on year basis.

The Company maintains its previous gold production guidance of 200,000 to 220,000 ounces of gold in 2014.

The company´s financial results for the quarter ended September 30, 2014, including capital and operating costs, will be released by mid-November.


Forward Looking Statements

This news release contains certain forward-looking information including a statement concerning future production. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward-looking information can be found in Rio Alto's disclosure documents on the SEDAR website at www.sedar.com. Rio Alto does not undertake to update any forward-looking information except in accordance with applicable laws.


To learn more about Rio Alto Mining Limited, please visit: www.rioaltomining.com or Rio Alto's SEDAR profile at www.sedar.com.


ON BEHALF OF RIO ALTO MINING LIMITED

Alex Black
President & CEO



Contact

Rio Alto Mining Ltd.
Alex Black, President & CEO
+511 625 9900
alexb@rioaltomining.com

Rio Alto Mining Ltd.
Alejandra Gomez, Investor Relations
604.628.1401
866.393.4493
alejandrag@rioaltomining.com
www.rioaltomining.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Rio Alto Mining Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.