Callinex Extends Pine Bay Project with Acquisition of Mining Claim Adjacent to High-Grade Massive Sulphide Mineralization
Vancouver, British Columbia (FSCwire) - Callinex Mines Inc. (the “Company” or “Callinex”) (TSX-V: CNX; OTCQX: CLLXF) is pleased to announce it has acquired the Bay 1 mining claim (the “Claim”) located at the south end of its 100% owned Pine Bay Project and approximately 400m along trend from Hudbay’s past-producing Centennial Mine. The Company acquired the claim based on a review of historic drilling within the vicinity of the Project that identified significant intersections approximately 300m from the Centennial Mine shaft and approximately 100m from the newly acquired Claim boundary (See Figure 1 & 2). These intersections were reported in drill logs where visual estimates outlined*:
- Hole SAL 9 with 14.1m of massive sulphides ranging up to 35% chalcopyrite and 10-20% sphalerite;
- Hole SAL 11 with 8.7m of massive sulphides ranging up to 10% chalcopyrite and 30-40% sphalerite; and
- Hole SAL 12 with 11.1m of massive sulphides ranging up to 10-15% chalcopyrite and 10-20% sphalerite.
*The mineral chalcopyrite consists of approximately 35% copper, 35% sulfur and 30% iron while the mineral sphalerite consists of approximately 64% zinc, 33% sulfur and 3% iron. The Company has not verified the above information and it is not necessarily indicative of mineralization on the Bay 1 mining claim.
No assays were included in the drill logs included with the assessment report. Full drill results for the 12 holes adjacent to the Bay 1 claim are available at: http://www.gov.mb.ca/data/em/application/assessment/98616.pdf
In addition to the close proximity to historic high-grade mineralization, the claim area is interpreted to cover the Centennial-Sourdough geological trend, an extension of the stratigraphy that hosts the Centennial Mine and Callinex’s Sourdough Bay deposit. A significant section of this prospective extension has not been subjected to modern geophysical exploration. The Centennial-Sourdough stratigraphy is believed to extend for multiple kilometers onto the Pine Bay Project area and is one of several stratigraphic horizons on the property known to host VMS mineralization. The Company acquired the Claim from the vendor for an immaterial cash payment.
The Pine Bay Project consists of a recently consolidated land package located 16km east of Hudbay’s 777 Mine and hosts four high-grade VMS deposits rich in copper and zinc. Previous operators reported historical resource estimates totaling 1.62 million tons at a grade of 2.81% copper equivalent(1). This is a historic estimate and has not been verified by the Company. This historic resource should not be relied upon.
Figure 1: Map of Bay 1 Claim Area
To view the graphic in its original size, please click here
Figure 2: Map of Pine Bay Project
To view the graphic in its original size, please click here
About The Pine Bay Project
The Pine Bay Project is located 16km east of Flin Flon, MB, and covers approximately 4,500ha. The project includes a mineral lease that allows for the right to operate a mine and covers a 212m vertical shaft with 760m of underground development accessing high-grade historic copper mineralization. In addition to the right to operate a mine, the project hosts four past producing VMS mines and historic resources totaling 1.62 million tons at a grade of 2.81% Cu Eq.(1).
The property consists of recently consolidated land package with individual claim blocks previously owned or operated by Placer Dome, Newmont, Hudbay and Cameco. In the 1990’s, the northern section of the property was primarily explored by Placer Dome, who conceptualized potential for a large VMS deposit at depth near the Pine Bay, Cabin and Baker Patton deposits. The Baker Patton deposit, which may represent a feeder zone, is located within a large and intensely altered zone up to 1,500m long and up to 740m wide. This alteration zone overlies a 540m x 360m stringer zone, a large gravity anomaly and both electromagnetic (EM) and magnetic anomalies.
It is believed the alteration zone is part of a more extensive system that has been displaced by faulting. Drilling by a previous operator identified at depth a 210m wide alteration zone that includes 50m of chloritic alteration which has not been followed up on. Nearly all VMS deposits in the Flin Flon Greenstone Belt are immediately related to a chloritic alteration zone and the extent of which typically has a correlation to the deposit size.
In 2011, a small drilling program was completed by the Company to test the down-dip extension of the Pine Bay deposit. Subsequent borehole EM and Deep Pulse EM geophysical loop surveys identified a high priority target area located near the Pine Bay deposit. This off-hole geophysical anomaly may represent a displaced extension of the deposit.
Pine Bay Historic Resources(1) | ||||||
Deposit | Tons | Cu Eq%(2) | Cu % | Zn % | Au g/t | Ag g/t |
Pine Bay | 1,113,200 | 2.76 | 2.76 | N/A | N/A | N/A |
Sourdough | 291,150 | 2.98 | 1.46 | 1.71 | 1.03 | 29.8 |
Cabin | 125,000 | 2.18 | 0.84 | 4.02 | N/A | N/A |
Baker Patton | 95,000 | 3.66 | 0.80 | 5.28 | 0.83 | 56.0 |
Total | 1,624,350 | 2.81 | 2.26 | 0.92 | 0.24 | 8.9 |