Timberline Resources Drilling Identifies New Zone of Gold Mineralization at Eureka

14.01.2015  |  Marketwire

COEUR D'ALENE, IDAHO--(Marketwired - Jan 14, 2015) - Timberline Resources Corp. (NYSE MKT:TLR)(TSX VENTURE:TBR) ("Timberline" or the "Company") today announced the recognition of a new higher grade zone of gold mineralization at the Company's Eureka project in Nevada. Reverse circulation (RC) drill hole BHSE-171 intersected 25 feet of 0.144 ounces of gold per ton (opt) (7.62 meters (m) of 4.93 grams of gold per tonne (g/t)) within a longer 65 foot interval assaying 0.094 opt (19.82 m of 3.22 g/t) in the Lookout Mountain area. This hole was offset 140 feet from BHSE-152 (drilled in 2012) which first encountered the new zone but was not completed due to drilling difficulties. Additional drilling at Lookout Mountain and the previously announced drill program at the Windfall target is expected to recommence in the next two weeks.

Kiran Patankar, Timberline's President and Chief Executive Officer, commented, "BHSE-171 is significant for several reasons. First, the mineralization identified represents a new discovery at Eureka and validates the conceptual target identified by our technical team. Given our demonstration of continuity over 140 feet, it is reasonable to believe that we have not yet seen the center of the mineralization. With several thousand feet of untested strike extent, the Eureka project now has clear potential for a large underground bulk-mineable gold deposit."

Results from BHSE-171, as well as the previously-drilled BHSE-152, are presented in the table below:

Drill Hole From
(feet)
Length
(feet)(1)
Gold
(opt)
From
(meters)
Length
(meters)(1)
Gold
(g/t)
BHSE-171 990 65 0.094 301.8 19.82 3.22
including 1020 25 0.144 311.0 7.62 4.93
BHSE-152 1,025 15.0 0.14 312.4 4.6 4.73
Notes:
(1) True widths of the drill intercepts have not been determined

The mineralization intersected in holes BHSE-171 and BHSE-152 is well correlated and represents a newly recognized zone of higher grade gold mineralization at depth associated with the existing resource at Lookout Mountain. The Company's current NI 43-101 compliant gold resource is defined over, and open beyond, a strike length of 4,000 feet. This new gold zone occurs within the favorable Dunderberg Shale near the brecciated contact with the Secret Canyon Formation and may represent a higher grade feeder system as recognized in many Carlin-type systems.

Drilling at Lookout Mountain is planned to resume in January and will initially include two additional holes to offset BHSE-171. Having now identified the mineralized zone through initial RC drilling, follow-up core drilling will sample the mineralized section to more accurately assess gold grade, stratigraphic and structural controls, and target geometry.

The program is also expected to include RC drilling at Windfall in order to test the strike extension and follow up on historic gold mineralization and the exploration target previously disclosed (December 17, 2014 press release).

Timberline's current gold resource estimate at Lookout Mountain, which was prepared by Mine Development Associates ("MDA") of Reno, Nevada, consists of:

Lookout Mountain Gold Resource(1)(2)(3)
Resource
Category
Short
Tons
Metric
Tonnes
Ounces of
Gold per
Ton (opt)
Grams of
Gold per
Tonne (g/t)
Gold
Ounces
Measured 3,043,000 2,761,000 0.035 1.20 106,000
Indicated 25,897,000 23,493,000 0.016 0.55 402,000
Measured & Indicated 28,940,000 26,254,000 0.018 0.62 508,000
Inferred 11,709,000 10,622,000 0.012 0.41 141,000
Notes:
(1) 0.006 opt (0.21 g/t) cut-off applied to oxidized material to capture mineralization potentially available to open pit extraction and heap leach processing. 0.030 opt (1.03 g/t) cut-off applied to unoxidized material to capture mineralization potentially available to open pit extraction and lower heap leach recoveries or sulfide processing.
(2) Rounding may cause apparent discrepancies.
(3) The effective date of the Lookout Mountain updated gold resource is February 20, 2013.

The full MDA Resource Estimate with various cut-off grades can be seen at http://timberline-resources.com/main.php?page=208.

Timberline's district-scale Eureka project is strategically located within the greater Eureka Mining District, just four miles from Barrick Gold's multi-million ounce Archimedes / Ruby Hill mine. The Eureka project features three distinct zones defined by structure and geochemistry and includes past-producing open pits, along with several untested zones and underexplored exploration targets. In addition to the estimated resources shown above, there is an exploration target totaling 185,000 - 200,000 ounces of gold at the Windfall structural trend that grades approximately 0.024 opt - 0.027 opt using a 0.010 opt cutoff. Detailed maps can be viewed at http://timberline-resources.com/main.php?page=194.

Note: A qualified person has not done sufficient work to classify the exploration target estimates as current mineral resources. The Company is not treating the exploration target estimates as current mineral resources and the exploration target estimates should not be relied upon. The management estimates of the exploration target at Windfall were determined based on drill results and geologic modeling using polygonal grade shells with a 0.01 ounce per ton cut-off and a non-statistical average grade calculation based on a weighted average grade within each polygon. The estimate is conceptual in nature, and there has been insufficient exploration drilling to define a mineral resource that may be categorized as an indicated, measured, or inferred resource. It is uncertain if further exploration will result in the target being delineated as a mineral resource as defined in NI 43-101.

Steven Osterberg, Ph.D., P.G., Timberline's Vice-President of Exploration, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical contents of this news release. He has verified the drill results and other data disclosed in this news release, including sampling, analytical and test data. Field work has been conducted under his supervision. The Timberline sampling and analysis program included an industry standard QA/QC program. After logging and cutting or dividing the sample intervals in half, the samples were picked up by Inspectorate America Corporation and taken to their ISO-9001 certified assay lab in Sparks, Nevada for analysis. The samples were analyzed for gold using a standard 30g fire assay with an AA finish. Samples returning a gold value in excess of 3 ppm were re-analyzed using a 30g fire assay with a gravimetric finish.

The Lookout Mountain mineral resources were modeled and estimated by MDA by evaluating the drill data statistically, utilizing geologic interpretations provided by Timberline to interpret gold mineral domains on cross sections spaced at 50- to 100-foot intervals across the extents of the Lookout Mountain mineralization, rectifying the mineral-domain interpretations on level plans spaced at 10-foot intervals, analyzing the modeled mineralization geostatistically to aid in the establishment of estimation parameters, and interpolating grades into a three-dimensional block model. Mike Gustin, CPG of MDA is a Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimate.

About Timberline Resources

Timberline Resources Corp. is focused on advancing and developing its 23 square mile Eureka project located within the Battle Mountain-Eureka gold trend in Nevada. The Company continues to advance the NI 43-101 resource of 508,000 ounces (M&I) and 141,000 ounces (Inferred) of gold at Lookout Mountain in addition to advancing the exploration target of 185,000 - 200,000 ounces of gold at the Windfall area into NI 43-101 compliance. Exploration potential across the project area occurs along three separate structural trends defined by distinct geochemical gold anomalies. The majority of the project area has yet to be drill tested. Historic production from heap leach mines took place at Lookout Mountain and Windfall mines, both located on the Company's Eureka project. Timberline also owns the Seven Troughs project in northern Nevada, known to be one of the state's highest grade, former producers, as well as a carried-to-production interest in the Butte Highlands high-grade underground gold project in Montana.

Timberline is listed on the NYSE MKT where it trades under the symbol "TLR" and on the TSX Venture Exchange where it trades under the symbol "TBR".

Cautionary note to U.S. investors concerning estimates of measured and indicated resources: This press release uses the terms "measured resources", "indicated resources" and "measured & indicated resources." We advise U.S. investors that while these terms are defined in and required by Canadian regulations, these terms are not defined terms under United States Securities and Exchange Commission ("SEC") Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures. The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into SEC Industry Guide 7 reserves.

Cautionary note to U.S. investors concerning estimates of inferred resources: This press uses the term "inferred resources". We advise U.S. investors that while this term is defined in and required by Canadian regulations, this term is not a defined term under SEC Industry Guide 7 and is normally not permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures. The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC. U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.

Forward-looking Statements

Statements contained herein that are not based upon current or historical fact are forward-looking in nature and constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such forward-looking statements reflect the Company's expectations about its future operating results, performance and opportunities that involve substantial risks and uncertainties. These statements include but are not limited to statements regarding the timing and results of the Company's continued exploration and drill program at South Eureka and Lookout Mountain, the timing of assay results from such drilling program being released, the Company's ability to expand and upgrade the South Eureka resource, the amount of drilling or the location of the drill holes, and the length of time it will take to drill. When used herein, the words "anticipate," "believe," "estimate," "upcoming," "plan," "target", "intend" and "expect" and similar expressions, as they relate to Timberline Resources Corp., its subsidiaries, or its management, are intended to identify such forward-looking statements. These forward-looking statements are based on information currently available to the Company and are subject to a number of risks, uncertainties, and other factors that could cause the Company's actual results, performance, prospects, and opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, whether or not the Company completes the acquisition of Wolfpack US, risks related to obtaining shareholder and regulatory approvals, market risks, risks and uncertainties related to mineral estimates, risks related to the inherently dangerous activity of mining, and other such factors, including risk factors discussed in the Company's Annual Report on Form 10-K for the year ended September 30, 2013. Except as required by Federal Securities law, the Company does not undertake any obligation to release publicly any revisions to any forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

Timberline Resources Corp.
Kiran Patankar
President and Chief Executive Officer
208-664-4859
info@timberline-resources.com
www.timberline-resources.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Timberline Resources Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.