• Sonntag, 24 November 2024
  • 22:24 Uhr Frankfurt
  • 21:24 Uhr London
  • 16:24 Uhr New York
  • 16:24 Uhr Toronto
  • 13:24 Uhr Vancouver
  • 08:24 Uhr Sydney

Calibre Mining Announces Additional Trenching Results Including 8.45 Metres Grading 3.42 g/t Gold from the 100% Owned Montes de Oro Gold Project, Nicaragua

14.01.2015  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan 14, 2015) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce results from the current phase of exploration activities on the 100% owned, high-grade Montes de Oro Gold Project, and additional gold targets within the Siuna District, Nicaragua.

Highlights

  • Three additional trenches were completed in the northern half of the 400 metre by 600 metre gold in soil anomaly on the Montes de Oro Project.

  • Step-out trench MTR14-030 located 300 metres north of trench MTR13-009 (52.3 metres grading 7.07 g/t Au) intersected 8.45 metres grading 3.42 g/t Au and 11.34 g/t Ag, Additional trenching is planned to further extend and define gold mineralization at the Montes de Oro Gold Project

  • A 25 line kilometre ground magnetic survey was completed in Q4 2014

  • An Induced Polarization (IP) Survey consisting of five lines each 1.2 kilometres in length is underway and will be completed in January 2015

  • Sampling and Geological Mapping has been commenced on a series of targets which have similar geological and geochemical features to Monte de Oro

President and CEO, Greg Smith stated: "The results of the additional trenching and ground geophysical programs at Montes de Oro continue to further define the gold mineralization in preparation for drilling of this high priority, 100% owned gold project. In addition to Montes de Oro, Calibre has identified several additional 100% Calibre owned gold targets in the Siuna District which will be further defined by the on-going work programs."

New Trench Results - Monte de Oro Project

Trench ID From (m) To (m) Length (m) Au (g/t) Ag (g/t)
MTR14-030 1.85 10.30 8.45 3.42 11.34
MTR14-031 8.30 15.00 6.70 0.11 0.15
MTR14-032 12.50 14.50 2.00 2.63 0.15
Notes; - Intervals are trench lengths / true width are estimated to be 80-90% of lengths
- Length weighted averages from uncut assays.

The Montes de Oro target is a 400 metre by 650 metre gold (and multi-element) in soil anomaly which has been successfully tested by trenching with results including 52.3 metres grading 7.1 g/t Au, 27.5 metres grading 4.92 g/t Au and 33.5 metres grading 2.10 g/t Au. Work to date at Montes de Oro has defined two high-grade, sub-parallel gold mineralized zones: one 250 metres long and one 500 metres long. Both zones are open for expansion.

Trench MTR14-030, located 300 metres north of trench MTR13-009 which intersected 52.3 m grading 7.07 g/t Au, exposed silicified and argillic altered diorite with variable quartz veining averaging 8.45 metres grading 3.42 g/t Au and 11.34 g/t Ag. The gold and silver values are associated with elevated levels of zinc, lead, arsenic, iron, and copper. Trench MTR14-031 was completed 250 metres north-east of trench MTR14-030 and intersected low grade halo mineralization including 6.70 metres grading 0.11 g/t Au - an extension to this trench is planned. Trench MTR14-032 was completed 300 metres north of trench MTR14-031 and sampling returned 2.00 metres grading 2.63 g/t Au.

In Q4 2014 Calibre completed a ground magnetic geophysical program consisting of 25 line kilometres of surveying which covered the entirety of the 600 metre by 450 metre gold in soil anomaly. The survey highlighted highly magnetic zones interpreted to be associated with strongly magnetic intrusive rocks and possibly with concentrations of pyrrhotite which has been shown to be associated with elevated gold values at Montes de Oro. The on-going IP survey consists of five survey lines each 1.2 kilometres in length covering an area which includes the complete strike length (500 metres) of the mineralization between trenches MTR13-009 and MTR14-030.

Additional work is also underway on a series of gold targets with similar geological and geochemical characteristics to the Montes de Oro discovery. Exploration in Q1 2015 will include rock and soil sampling and geological mapping at Rosquilete (8 km north-west of Montes de Oro), San Miguelito (3km north-east of Montes de Oro), and Cerro Aza (5km south-west of Montes de Oro).

The Siuna District is located in the south-west portion of the Borosi Concessions and contains the past producing La Luz Mine that produced 17.1 million tonnes of ore grading 4.14 g/t gold (2.3 million ozs gold). Approximately one kilometre south of the La Luz Mine, Calibre has defined an NI 43-101 Inferred Mineral Resource, at the Cerro Aeropuerto gold-silver deposit at a 0.6 g/t AuEq cutoff of 6.0 million tonnes grading 3.64 g/t gold and 16.16 g/t Ag containing 707,750 ozs gold and 3.1 million ozs silver (see Calibre News Release dated February 28, 2011). Montes de Oro is located 10 kilometres north of the La Luz Mine.

Updated maps detailing the current exploration programs will be posted on the Company's web site at www.Calibremining.com.

Calibre is committed to best practice standards for all exploration, sampling and trenching activities. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Acme Labs (a Bureau Veritas Group Company) in Managua, Nicaragua for sample preparation and then to Acme Labs in Vancouver, Canada for gold fire assay and ICP-MS multi element analyses.

The technical content in this news release was read and approved by Gregory Smith, P.Geo, President and CEO of the Company who is the Qualified Person as defined by NI 43-101.

About Calibre Mining Corp.

Calibre controls a 100% interest in 253 km2 of mineral concessions in the Mining Triangle of Northeast Nicaragua. Additionally the Company has an option agreement with IAMGOLD covering 176 km2 of concessions, joint venture exploration programs underway with B2Gold Corp. on 322.3 km2 of concessions which includes the Primavera gold-copper porphyry discovery and the Minnesota Gold Zone, and has optioned the 33.6 km2 Rosita gold-copper-silver project to Alder Resources Ltd. Major shareholders of Calibre include gold producer B2Gold Corp., Pierre Lassonde and Management.

Calibre Mining Corp.

Greg Smith, P.Geo., President and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements

This news release contains certain forward-looking statements, Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or does not expect", "is expected", anticipates" or "does not anticipate" "plans", "estimates" or "intends" or stating that certain actions, events or results " may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be "forward-looking statements". Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to materially differ from those reflected in the forward-looking statements.

Safe Harbor Statement under the United States Private Securities Litigation Reform Act of 1995: Except for the statements of historical fact contained herein, the information presented constitutes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements including but not limited to those with respect to the price of gold, potential mineralization, reserve and resource determination, exploration results, and future plans and objectives of the Company involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of Atlas to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.



Contact

Calibre Mining Corp.
Ryan King
604 628-1012
www.calibremining.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Calibre Mining Corp.
Bergbau
A2N8JP
CA13000C2058
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.