08.09.2015  |  FSCwire

Sudbury, Ontario (FSCwire) - Houston Lake Mining Inc. (TSX.V: HLM) - HLM is pleased to announce the remaining results of three (3) drill holes from a Phase III diamond drill program designed to define the upper extent of mineralization along the eastern extension between holes PL-13-001 and PL-010-14. The assay and collar data for the 3 holes reported are presented in Tables I and II, respectively.  A fouth hole, PL-022-15, drilled 100m to the east did not interesect pegmatite, however, the presence of tourmaline-rich aplite and quartz veins suggest proximity to the pegmatite body.

Highlights:

  • Diamond Drill Hole (DDH) PL-016-15 intersected 2.64% Li2O over 70.4 metre (m) from 77.45m to 147.85m including an Upper Intermediate Zone (UIZ) of 3.68% Li2O over 15.45m from 96.0 to 111.45m,
  • DDH PL-019-15 scissored from the south and 30m to the east of PL-016-15, intersected 2.25% Li2O over 70.55m from 103.15 to 173.70m including an 11.0m wide lithium-enriched zone averaging 3.03% Li2O from 123.0 to 134.0m,
  • Mineralization remains open to depth and along strike to the northwest and southeast.
  • Drill results suggest mineralization is plunging to the south-east and possibly present beneath hole PL-022-15 (100m east of known mineralization).

“We are extremely pleased with these in-fill drill results that complete the Phase III diamond drill program as they consolidate the inferred and indicated Resource Estimate announced January 28, 2015, and will likely expand the current mineral resource estimate’s tonnage(1).”, commented Trevor R. Walker, President of HLM. “There is a strong possibility that the pegmatite is plunging to the south-east, which if our theory is accurate, it would suggest that in addition to very high grades, the deposit could also have a very high size potential. The south-east plunge theory will become the new focus for a future drill program.”

The intersection summaries including the three drill holes general location and purpose are outlined in Table I below. The table also summarizes the lithium, cesium, tantalum and rubidium grades for the four drill holes by mineralogical zones for the pegmatite intersections.

Table I  – Core Length  Intercepts (Pakeagama Lake pegmatite)

DDH PL-016 -15

Designed to test from the NNE, the thickness of granite beneath hole PL-13-006 and to define the northern boundary of the metasediments intersected at depth in holes PL-13-001 and PL-013-14

Zone

Width (m)

Li2O (%)

Ta2O5 (ppm)

SnO2 (ppm)

Nb2O5 (ppm)

Rb2O (%)

Cs2O (%)

Geology

Lithium plus Tantalum and Rubidium enriched zones

77.45 – 147.85 m

70.40

2.64

90

63

39

0.28

0.04

UIZ/LIZ

Including 89.00 – 94.00 m

5.00

0.36

247

115

65

0.15

0.02

Aplite

Including 96.00 – 111.45 m

15.45

3.68

79

73

30

0.23

0.04

UIZ

Rubidium, Tantalum and Tin enriched zone

178.20 – 188.00 m

9.80

0.36

180

442

164

0.24

0.04

Aplite/granite

Including 182.85 – 188.00 m

5.15

0.51

293

787

265

0.31

0.05

Transition zone

195.35 – 229.00 m

33.65

0.49

157

328

85

0.29

0.05

CIZ/granite

Including 195.35 – 212.00 m

16.65

0.47

180

283

119

0.27

0.05

WZ/CIZ

Including 195.35 – 200.00 m

4.65

0.46

244

524

164

0.28

0.05

WZ

 
   

DDH PL-017 -15

Designed to test from the NNE, the upward extension of the LIZ intersected in hole PL-010-14.

Zone

Width (m)

Li2O (%)

Ta2O5 (ppm)

SnO2 (ppm)

Nb2O5 (ppm)

Rb2O (%)

Cs2O (%)

Geology

Lithium plus Tantalum and Rubidium enriched zones

63.00 – 66.80 m (3)

3.80

1.94

161

230

62

0.46

0.03

LIZ

144.75 – 159.00 m

14.25

2.17

58

63

28

0.12

0.03

LIZ

Including 144.75 – 156.00 m

11.25

2.66

72

77

33

0.13

0.04

LIZ

173.30 – 188.60 m

21.30

1.60

97

79

28

0.41

0.01

LIZ

Including 173.30 – 188.60 m

15.30

2.12

102

85

29

0.30

0.01

LIZ

Rubidium plus Tantalum and Tin enriched zone

202.10 – 238.70 m

36.60

0.51

88

123

40

0.21

0.06

WZ/Aplite

Including 233.65 – 238.70 m

5.05

0.63

203

364

88

0.30

0.05

WZ/Aplite

DDH PL-019 -15

Designed to test from the south, the upward extension of the LIZ intersected in hole PL-010-14 from the south.

Zone

Width (m)

Li2O (%)

Ta2O5 (ppm)

SnO2 (ppm)

Nb2O5 (ppm)

Rb2O (%)

Cs2O (%)

Geology

Lithium plus Tantalum, Tin and Rubidium enriched zones

45.90 – 52.35 m(3)

6.45

1.99

204

514

88

0.30

0.04

LIZ

103.15 – 173.70 m

70.55

2.25

77

131

54

0.33

0.04

LIZ

Including 123.00 – 134.00 m

11.00

3.03

58

89

40

0.31

0.04

LIZ/UIZ

Including 153.00 – 170.00 m

17.00

2.47

73

94

57

0.25

0.02

LIZ

 

(1) The intervals in Table I are drill intersection widths. There is currently insufficient data to determine the true thickness of the pegmatite.

(2) Li20 content in the CIZ is predominantly associated with lithian micas and to a lesser extent (if any) in spodumene. Li2O content in the Li enriched zones is predominantly associated with spodumene.

(3)  There is insufficient data to determine if the noted intersection is a part of the Pakeagama pegmatite. Due to the intercept’s spatial location it is unknown if the mineralization indicates another pegmatite at this time.   

n/a = Not applicable

The Upper Intermediate (UIZ), Central Intermediate (CIZ), Lower Intermediate Zones (LIZ) and Wall Zone (WZ) were previously described in the July 2, 2013 Press Release.  Zones of sodic aplite are present in all holes and vary in width from tens of centimetres to several metres, and contain significant concentrations of Ta, Rb and Cs. 

Noteworthy observations are that the NNE (footwall) boundary with the metasediments is consistent and predictable while the SSW (hanging wall) contact with the granite is somewhat erratic and complicated by granitic blocks and rafts, and appears to have been variably affected (metasomatized) by the pegmatite intrusion event(s).  The mineralized pegmatite remains open along strike to the WNW and ESE, and at depth.  Granitic blocks/rafts mapped on surface appear to diminish with depth. The scissor pairs of DDH-16 and 19 and DDH-10 and 17 indicate that the pegmatite zone is at minimum 40m wide, sub-vertical and appears to be plunging under the granite blocks intersected in the shallower holes.

 Table II– Collar Locations for Diamond Drill Hole (DDH) 

DDHNo

NAD83 (Zone 15N)

Elevation (mASL)

Azimuth

Inclination

Total Depth (m)

Easting

Northing

PL-016-15

474635

5827978

316

210

-60

247.5

PL-017-15

474664

5827978

320

180

-60

267.0

PL-019-15

474636

5827869

314

000

-60

195.0

PL-022-15

474746

5827819

315

015

-45

220.5

 

Due Diligence

All scientific and technical information in this release has been reviewed and approved by Peter J. Vanstone, P.Geo., the qualified person (QP) under the definitions established by National Instrument 43-101.  Under HLM’s QA/QC procedures, the diamond drill contract specified NQ-sized drill core providing a 47.6 mm diameter sample.  The drill holes were oriented perpendicular to the strike of the pegmatite and drilled continuously across it.  Sample security and chain of custody started with the removal of core from the core tube and boxing of drill core at the drill site.  The boxed core remained under the custody of the drill contractor until it was transported from the drill to the secure on-site Core Shack facility by either the drill contractor or one of the Company’s designated personnel.  At the on-site Core Shack, core boxes were opened and inspected to ensure correct boxing and labelling of the core by the drill contractor, photographed and then re-closed.  The core was stored securely until moved into the Core Shack for processing. The company geologists logged the core, and then marked and tagged it for sampling and splitting.  Each core sample was assigned a tag with a unique identifying number.  Sample lengths are typically one meter, but can be less depending on zone mineralogy and boundaries.  The Core was then re-closed and shipped to the company’s off-site core splitting facility in Sudbury, Ontario.  Core marked for splitting was cut using a diamond core saw with a mounted jig to assure the core was cut lengthwise into equal halves.  Half of the core was sent to an analytical laboratory for quantitative analysis of select elements.  The remaining half of the core is retained and incorporated into HLM’s secure, off-site core library.

All samples were assayed by Activation Laboratories Ltd. (“Actlabs”), an ISO accredited laboratory in Ancaster, Ontario. Sample blanks along with tantalum, lithium, rubidium and cesium certified reference material was routinely inserted into the sample stream in accordance with industry recommended practices. Field duplicate samples were also taken in accordance with industry recommended practices.

About the PAK Lithium Project

The PAK Lithium Project lies close to the boundary between two geological sub-provinces of the western Superior geologic province in northwestern Ontario and hosts a rare metals pegmatite deposit. The deposit is an LCT (lithium- cesium- tantalum) type pegmatite. These types of pegmatites have been the principal source of hard rock lithium, tantalum, rubidium and cesium ores mined in the world but there are comparatively few commercially-viable deposits.

HLM is actively exploring its 100% owned and optioned project which contains the Pakeagama Lake pegmatite. The deposit is one of the highest grade lithium deposits in North America which has a current Indicated Resource of 2.45 million tonnes of 1.81% Li2O Eq.

and Inferred Resource of 5.91 million tonnes of 2.01% Li2O Eq. which has a technical/ceramic grade spodumene with low inherent iron (below 0.1% Fe2O3)[1]. The deposit has adjacent zones that are enriched in rubidium and tantalum. HLM is also evaluating the phased co-production of rubidium and tantalum concentrates once lithium mineral production has been commercialized.

The deposit has a known 400m strike length with an estimated true width varying from 10m to 125m with a sub-vertical orientation. The resource remains open to depth and along strike to the northwest and southeast. The Phase III, 1,500m diamond drill program was conducted with the objective to upgrade the lithium Indicated mineral resource to a Measured category, and to possibly upgrade the Inferred mineral resource to a Measured and Indicated category.

About Houston Lake Mining Inc.
HLM’s goal is to become a fully integrated lithium, rubidium and tantalum producer through the development of the PAK Rare Metals Project in Ontario, Canada .  The Company's strategy is to take advantage of the global shift towards electric/hybrid vehicles and high quality consumer electronics by becoming a raw material supplier of the elements required for the pursuit of sustainable energy and other applications in high-tech electronics and metal alloys. Combined, HLM’s Board of Directors and Management have over 300 years of finance, exploration and mining experience to facilitate the Company’s goal.

HLM has a total of 108,043,248 common shares issued and outstanding. For additional information, please visit the company website at www.houstonlakemining.com.

Company Contact Information

Trevor R. Walker, President                                                                                  Henry J. Kloepper, CEO        

2736 Belisle Drive                                                                                                    T. +001 416.520.0187

Val Caron, ON.

P3N 1B3 CANADA

T. +001 705.897.7622

F. +001 705.897.7618

Forward-looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, Investors should review the Company’s registered filings what are available at www.sedar.com.
 

[1] See HLM Press Release January 28, 2015 titled “HLM Announces an Upgraded NI 43-101 Resource Estimate for the PAK Rare Metals Project in Ontario, Canada.



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/HoustonLakeSept82015.pdf

Source: Houston Lake Mining Inc. (TSX Venture:HLM) http://www.houstonlakemining.com/

Maximum News Dissemination by FSCwire. http://www.fscwire.com

Copyright © 2015 Filing Services Canada Inc.






Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Frontier Lithium Inc.
Bergbau
A2ANKZ
CA35910P1099

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.