• Freitag, 22 November 2024
  • 18:08 Uhr Frankfurt
  • 17:08 Uhr London
  • 12:08 Uhr New York
  • 12:08 Uhr Toronto
  • 09:08 Uhr Vancouver
  • 04:08 Uhr Sydney

Lake Shore Gold Reports Continued Drilling Success at 144 Gap, Discovers New Gold Mineralization at 144 South

28.10.2015  |  Marketwire

TORONTO, ONTARIO--(Marketwired - Oct. 28, 2015) -

  • First underground hole into western portion of 144 Gap Zone intersects 6.85 gpt/59.2 m

  • Additional underground delineation holes in northeast portion of 144 Gap Zone intersect 79.52/8.3m, 10.91 gpt/11.9 m, 5.19 gpt/13.3 m, 5.29 gpt/18.1 m, 5.36 gpt/ 28.1 m, 6.98 gpt/36.1 m, 6.05 gpt/31.5 m, 11.64 gpt/8.9 m and 4.39 gpt/37.9 m

  • Surface delineation holes targeting top portion of 144 Gap Zone intersect 12.13 gpt/13.8 m, 6.58 gpt/28.1 m, 5.76 gpt/24.5 m, 4.96 gpt/20.4, 4.78 gpt/13.9 m, 4.06 gpt/21.7 m, 4.29 gpt/15.1 m, 4.78 gpt/13.0 m and 3.23 gpt/ 16.9 m

  • Surface drilling at 144 South discovers new zones of gold mineralization 450 metres below and northeast of previous drilling (Key intercepts: 3.11 gpt/19.1 m, 5.38 gpt/3.6 m, 4.27 gpt/7.3 m, and 9.59 gpt/ 3.0 m)

Lake Shore Gold Corp. (TSX:LSG) (NYSE MKT:LSG) ("Lake Shore Gold" or the "Company") today announced results from 60 holes and 11 wedge cuts (39,050 metres) of new surface and underground drilling at the 144 Trend. Of the holes being reported, 40 holes and nine wedge holes (13,945 metres) were completed as part of a detailed delineation program at the 144 Gap Zone designed to gain information in support of establishing a first resource estimate by early in 2016. Of the 40 holes, 39 holes (7,165 metres) were from underground drills working off the now completed exploration drift from Thunder Creek into the 144 Gap area, while one hole and nine wedge holes (6,780 metres) were drilled from surface. The remaining holes include 20 surface holes and two wedge holes (25,438 metres) were drilled mainly at the 144 Gap SW Zone and 144 South in order to advance the company's geological model and evaluate potential new targets for exploration to the southwest of the 144 Gap Zone.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "Today's drill results are very significant and include additional high-grade intercepts from delineation drilling at the 144 Gap Zone and the discovery of new zones of mineralization at 144 South, approximately 1.6 km further away. As with our initial underground drill results in the 144 Gap area released in September, the holes released today are similar to, and in some cases better than, the results from earlier surface drilling in the same areas. We are also very pleased with initial results from our surface exploration program, which continues to demonstrate our ability to identify new zones of gold mineralization as we move to the southwest from the 144 Gap Zone and highlights the considerable potential of the 144 Trend to host multiple gold deposits. With our exploration drift completed, we now have six underground drills operating at the 144 Gap Zone and remain on track to achieve our objective of releasing a first resource early in 2016."

Among significant results received from new underground delineation holes (see Table 1.) that were collared from the recently completed exploration drift from Thunder Creek were 6.85 gpt/ 59.2 metres ("m") from HW820-055 (see Figures 3 and 4). This hole represents the first hole drilled from underground to test the western portion of the 144 Gap Zone. Results also included 79.52 gpt/8.3 m, including 1000 gpt/0.6 m in HW820-16, 26.09 gpt/7.8 m in HW820-10, 5.29 gpt/18.1 m and 5.97 gpt/17.7 m in HW820-13, 5.36 gpt/28.1 m in HW820-18, 11.64 gpt/8.9 m and 6.98 gpt/36.1 m in HW820-19, 6.05 gpt/31.5 m in HW82-31 and 10.91 gpt/11.9 m, 5.19 gpt/13.3 m and 4.15 gpt/19.5 m in HW820-020 (see Figures 3 and 5). These additional holes were drilled near the east portion of the 144 Gap Zone between the 700 and 950 metre levels in order to follow up on initial results from underground drilling announced on September 16, 2015 (see press release entitled "Lake Shore Gold Reports High-Grade Intersections From Initial Underground Drilling at 144 Gap Zone").

Among significant results from surface delineation drilling to date (see Table 2.) are 12.13 gpt/13.8 m in Hwy-15-94W2, 6.58 gpt/28.1 m in Hwy-15-48W3, 4.78 gpt/13.0 m in Hwy-15-84W2, 5.76 gpt/24.5 m and 4.78 gpt/13.9 m in Hwy-15-87W3, 4.96 gpt/20.4m and 8.47 gpt/5.3m in Hwy-15-84W4, 4.06 gpt/21.7 m and 4.29 gpt/15.1 m in Hwy-15-94W1 and 3.23 gpt/16.9 m in Hwy-15-106W1. The new holes were drilled to test a 150 metre strike length on the west portion of the 144 Gap Zone between the 450 and 700 metre levels.

An additional 20 surface holes and two wedge holes were drilled mainly at the 144 Gap SW Zone and 144 South to advance the Company's geological model to the Southwest of the 144 Gap Zone. Results at both locations were successful and indicated similar rock types to those found at the 144 Gap Zone. In addition, results at 144 South included the identification of new zones of gold mineralization. Among the results at 144 South are 3.11 gpt/19.1 m, 5.38 gpt/3.6 m, 5.30 gpt/2.7 m and 4.22 gpt/2.7 m in Hwy-15-142, 4.27 gpt/7.3 m in Hwy-15-142W2 and 9.59 gpt/3.0 m in Hwy-15-148. Intersections from these holes are located approximately 100 to 200 metres northeast and 450 metres below previously reported results from Hwy-12-45 and Hwy-11-28 (see press release dated January 21, 2013).

Interpretation of drill results from the 144 Gap Zone continues to suggest that the zone is closely associated with a broad zone of hydrothermal alteration and deformation measuring up to 100 m wide containing multiple syenite porphyry intrusions and quartz veining, with pyrite, scheelite, galena and visible gold. Based on results received to date, the 144 Gap Zone is confirmed to have minimum strike and dip lengths of 400 m. The results from new drilling at 144 South indicate the presence of similar rock types, alteration and mineralization at distances up to 1.6 km to the southwest of the 144 Gap at elevations above the new 820 exploration drift.

Qualified Person

The Qualified Person ("QP") for Lake Shore Gold's drill program at the 144 is Eric Kallio, Senior Vice-President Exploration, P.Geo. Mr. Kallio, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Quality Control

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than 10 grams per tonne gold, the sample is fire assayed with a gravimetric finish. Select zones with visible gold are tested by pulp metallic analysis. NQ size surface drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. BQ size underground drill core is either saw cut or whole core sampled. The drill core is transported in security sealed bags for preparation to the ALS Minerals analytical facility located in Val d'Or Quebec for fire assay. This ALS Minerals facility is registered ISO 9001-2008 (CERT-0051527) and is SCC ISO/IEC 17025:2005 Accredited (#689). Most underground drill core is analyzed by Activation Laboratories Ltd. (Actlabs) in Timmins, Ontario. Actlabs is an ISO/IEC 17025:2005 Accredited laboratory.

About Lake Shore Gold

Lake Shore Gold is a Canadian-based gold producer with wholly owned operations in the Timmins Gold Camp. The Company produces gold from two mines, Timmins West and Bell Creek, with material being delivered for processing to the Bell Creek Mill. In addition to current operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.

 
Table 1. New Drilling Results - Underground Holes
Hole   Depth   Section       From   To   Interval   Grade   Comments
Number   (m)           (m)   (m)   (m)   (gpt)  
HW820-010   108   8825 N                        
                63.0   70.8   7.80   26.09   VG Noted
            incl.   67.0   70.8   3.80   48.56    
                81.0   89.8   8.80   3.22    
            incl.   81.0   81.5   0.50   27.80    
HW820-013   144   8825 N                        
                64.0   82.1   18.10   5.29   VG Noted
            incl.   77.7   80.6   2.90   13.56    
                101.9   119.6   17.70   5.97    
            incl.   104.0   106.1   2.10   12.22   VG Noted
HW820-014   231   8825 N                        
                69.4   73.7   4.30   3.20    
                170.8   172.0   1.20   7.63    
HW820-016   250   8875 N                        
                107.7   116.0   8.30   79.52    
            incl.   107.7   108.3   0.60   1000.00   VG Noted
                126.2   136.2   10.00   5.81   VG Noted
                142.0   154.6   12.60   3.36    
            incl.   153.8   154.6   0.80   20.20   VG Noted
                167.6   175.1   7.50   4.99    
            incl.   170.5   172.8   2.30   11.95    
HW820-017   252   8875 N                        
                86.8   91.2   4.40   11.10    
            incl.   88.5   89.5   1.00   32.90   VG Noted
                127.6   143.6   16.00   4.66    
            incl.   142.5   143.6   1.10   24.01   VG Noted
HW820-018   252   8875 N                        
                127.9   156.0   28.10   5.36    
            incl.   132.7   135.9   3.20   10.70   VG Noted
            and incl.   147.7   156.0   8.30   8.14    
            which incl.   153.1   156.0   2.90   14.79    
HW820-019   258   8875 N                        
                66.5   75.4   8.90   11.64    
            incl.   66.5   67.0   0.50   118.50   VG Noted
                95.3   97.5   2.20   9.39    
                112.4   148.5   36.10   6.98    
            incl.   112.4   113.4   1.00   114.78   VG Noted
            and incl.   135.2   137.0   1.80   27.70   VG Noted
                180.0   188.4   8.40   4.35    
            which incl.   187.8   188.4   0.60   22.40    
HW820-020   270   8875 N                        
                71.7   74.6   2.90   4.61    
                113.2   132.7   19.50   4.15    
            incl.   118.7   119.7   1.00   42.20   VG Noted
                140.4   153.7   13.30   5.19    
                191.1   203.0   11.90   10.91    
HW820-022   168   8775 N                        
                64.3   66.3   2.00   18.95    
HW820-024   195   8775 N                        
                66.7   70.2   3.50   15.02    
            incl.   66.7   67.4   0.70   64.10   VG Noted
HW820-026   192   8775 N                        
                147.3   149.7   2.40   27.30    
            incl.   149.2   149.7   0.50   131.00   VG Noted
HW820-029   220   8775 N                        
                124.7   129.0   4.30   4.66    
            incl.   127.1   129.0   1.90   9.54    
HW820-030   222   8775 N                        
                103.5   106.0   2.50   27.62    
HW820-031   201   8825 N                        
                72.6   80.7   8.10   3.14    
            incl.   80.1   80.7   0.60   28.60    
                97.3   128.8   31.50   6.05    
            incl.   99.3   105.2   5.90   15.90    
            which incl.   103.2   105.2   2.00   41.55    
            and incl.   126.8   128.8   2.00   15.40    
HW820-032   201   8825N                        
                51.7   58.1   6.40   2.54    
                62.5   66.1   3.60   4.06    
                79.0   84.2   5.20   3.20    
HW820-033   201   8825N                        
                57.5   59.0   1.50   4.20    
                81.5   84.3   2.80   6.42    
HW820-034   221   8725 N                        
                110.5   111.5   1.00   6.32    
                195.0   197.7   2.70   16.84    
HW820-035   225   8725 N                        
                104.0   106.0   2.00   5.29    
                182.2   184.3   2.10   21.41   VG Noted
HW820-037   252   8725 N                        
                134.4   139.7   5.30   3.49    
                208.6   216.0   7.40   5.44    
            incl.   208.6   210.4   1.80   18.36    
HW820-051   342   8875 N                        
                119.7   128.1   8.40   6.03    
            incl.   119.7   120.3   0.60   69.80   VG Noted
                140.9   143.6   2.70   5.50    
HW820-052   270   8875 N                        
                77.9   89.8   11.90   5.72    
                95.3   115.8   20.50   4.73   VG Noted
                127.7   140.4   12.70   3.98    
            incl.   137.4   140.4   3.00   9.34    
                152.4   168.2   15.80   3.33    
            incl.   152.4   154.0   1.60   14.22   VG Noted
                213.4   217.5   4.10   3.06    
                237.9   247.3   9.40   6.10    
HW820-053   300   8825 N                        
                92.0   103.0   11.00   7.35    
            incl.   92.0   93.5   1.50   24.87   VG Noted
            and incl.   101.9   102.5   0.60   35.60   VG Noted
                128.0   131.0   3.00   4.51    
HW820-054   300   8825 N                        
                112.7   115.7   3.0   3.08    
                130.1   134.7   4.6   6.48    
                144.7   154.8   10.1   5.30    
HW820-055   258   8575 N                        
                107.4   166.6   59.20   6.85    
            incl.   117.1   119.6   2.50   22.51   VG Noted
            and incl.   139.3   140.0   0.70   140.00   VG Noted
            and incl.   147.6   151.5   3.90   18.95    
Notes: 
1) True Widths are not reported at this time.
2) Assay reports are reported uncut.
3) The following generated low assays values: HW820-001, HW820-011, HW820-015, HW820-021, HW-820-23, HW820-025, HW820-27, HW820-028, HW830-036.
   
 
Table 2. New Drilling Results - Surface Holes
Hole   Depth           From   To   Interval   Grade   Comments
Section  
Number   (m)           (m)   (m)   (m)   (gpt)    
HWY-15-130   1104   8250                        
SW Zone               869.5   872   2.50   4.27    
            incl.   870.5   871   0.50   20.90    
HWY-15-135   1125   8300                        
SW Zone               853.3   854.3   1.00   6.72    
HWY-15-137   1198   8125                        
SW Zone               919.4   921.9   2.50   4.06    
            incl.   920.9   921.9   1.00   9.94    
HWY-15-140   1449   7200                        
144-South               1004   1005.5   1.50   5.30    
HWY-15-142   1215   7100                        
144-South               848.1   849.1   1.00   5.06    
                861.5   880.6   19.10   3.11   VG
            incl.   865   865.5   0.50   30.50    
                896   897.2   1.20   4.24    
                911.4   915   3.60   5.38   VG
                945.7   948.4   2.70   5.30    
                952.8   955.5   2.70   4.22    
HWY-15-142W2   1210   7100                        
144-South   819m           906   909.8   3.80   3.82   VG
beyond
wedge
 
                928.6   935.9   7.30   4.27    
            incl.   932.9   933.4   0.50   26.90    
HWY-15-143   1199   8325                        
SW Zone               895.6   906   10.4   3.19    
                931.2   935.4   4.2   3.71    
                963.7   965.7   2.00   3.21    
HWY-15-145   1201   7150                        
144-South               901.3   902.7   1.40   5.93    
                919.4   921.4   1.50   5.35    
                939.8   941   1.20   4.29    
                946.1   949.2   3.10   4.27    
HWY-15-145W1   1170   7150                        
144-South   773m           912.5   914   1.50   3.71    
beyond
wedge
 
HWY-15-146   1237   8325                        
SW Zone               982.8   986.4   3.60   3.10    
                1003.1   1004.3   1.20   4.91    
                1021   1024   3.00   6.07    
            incl.   1023   1024   1.00   14.9    
HWY-15-147   1165   7100                        
144-South               896.3   900.1   3.80   3.19    
                952.8   954   1.20   6.43    
HWY-15-148   1236   7050                        
144-South               936   939   3.00   9.59    
HWY-15-150   1089   7100                        
144-South               669.9   671   1.10   4.46    
HWY-14-48W3   1144   8650                        
144-GAP   595m           810.9   813.5   2.60   8.07    
beyond
wedge
 
            incl.   811.8   812.5   0.70   23.30    
                817.7   819.7   2.00   10.71   VG
            incl.   819.1   819.7   0.60   31.60    
                827   829   2.00   13.38    
                861.3   863.5   2.20   4.28   VG
                869.3   871   1.70   5.21   VG
                883.9   912   28.10   6.58   VG
            incl.   895.6   897.1   1.50   27.83    
            incl.   907   908   1.00   37.30    
                915.8   917.8   2.00   4.78    
                934   937.8   3.80   10.73    
            incl.   934   935.5   1.50   19.90    
HWY-14-48W4   1105   8650                        
144-GAP   637m           815   828   13.00   3.02    
    beyond
wedge
      incl.   826.7   828   1.30   7.39    
                843.3   844.4   1.10   6.82   VG
                898   899   1.00   12.30    
                922.5   925.8   3.30   4.34   VG
HWY-15-84W2   1066   8625                        
144-GAP   576m           749   751.7   2.70   11.19   Veins + VG
beyond
wedge
 
            incl.   750.6   751.7   1.10   23.84    
                781   794   13.00   4.78    
            incl.   789.9   792.1   2.20   9.13    
                815   840   25.00   2.65   VG
            incl.   815   820   5.00   4.09    
                894.2   895.9   1.50   5.93    
                1045.1   1046.5   1.40   5.92    
HWY-15-84W4   997   8625                        
    478m           751.9   755   3.10   5.00    
beyond
wedge
 
                813   833.4   20.40   4.96   VG
            incl.   819.7   820.2   0.50   96.00    
                834.9   840.2   5.30   8.47   VG
            incl.   836.4   836.9   0.50   18.95    
                861   863   2.00   19.66    
            incl.   862   863   1.00   38.70    
                878   882.4   4.40   3.58   VG
                889.5   891.7   2.20   8.71   VG
            incl.   891.2   891.7   0.50   26.50    
HWY-15-87W3   1002   8625                        
144-GAP   623m           812.4   826.3   13.90   4.78    
beyond
wedge
 
            incl.   818.2   820   1.80   17.9    
                849.9   873   24.50   5.76    
            incl.   849.9   850.9   1.00   48.60    
            incl.   870   870.5   0.50   37.40    
HWY-15-94W1   1093   8600                        
144-GAP   577m           810.4   825.5   15.10   4.29    
beyond
wedge
 
            incl.   821   821.7   0.70   19.50    
            incl.   825   825.5   0.50   37.10    
                842.1   863.8   21.70   4.06   VG
            incl.   846.9   847.8   0.90   15.35    
HWY-15-94W2   1031   8600                        
144-GAP   632m           800.4   804.4   4.00   5.02    
beyond
wedge
 
                829.9   843.7   13.80   12.13   VG
            incl.   829.9   834.5   4.60   26.61    
                872   874.8   2.80   4.39   VG
                895.8   897.7   1.90   8.12    
HWY-15-106W1   1044   8600                        
144-GAP   544m           784.8   792.7   7.90   4.39    
beyond
wedge
 
            incl.   792.2   792.7   0.50   27.40    
                797.7   798.7   1.00   6.47    
                816.4   817.9   1.50   4.70    
                834.2   851.1   16.90   3.23    
            incl.   834.2   835.7   1.50   13.05    
                                 
HWY-15-106W2   978   8600                        
144-GAP   578m           724   725.3   1.30   8.42    
beyond
wedge
 
                819.9   828.1   8.20   4.70    
            incl.   827.1   828.1   1.00   20.70    
                851.5   853.5   2.00   11.29    
            incl.   852.2   852.7   0.50   29.60    
Notes: 
 
1) HWY-15-84W1 (54m drilled), HWY-15-84W3 (219m drilled), HWY-15-87W2 (167m drilled), and HWY-15-142W1 (3m drilled) were terminated prior to target, due to wedge installation difficulties.
2) The following holes generated low assay values: HWY-15-120 (1540m), HWY-15-131 (1119m), HWY-15-133 (1215m), HWY-15-136 (1035m), HWY-15-138 (1122m), HWY-15-139 (1376m), HWY-15-141 (1297), HWY-15-144 (1254m), HWY-15-149 (1167m), and HWY-15-151 (1043m).
3) Results from HWY-15-132 and HWY-15-134 were reported earlier.
4) Assays are reported uncut.
5) True Widths are not reported at this time.
6) Section number determined by Collar Location.
   

To view Figure 1. Key Drilling Targets and Geology at Timmins West Complex, please visit: http://media3.marketwire.com/docs/1030262fig1.jpg

To view Figure 2. Level Plan - Surface Exploration Results, please visit: http://media3.marketwire.com/docs/1030262fig2.jpg

To view Figure 3. Plan View - 144 Gap Zone showing new underground drill holes, please visit: http://media3.marketwire.com/docs/1030262FIG3F.pdf   

To view Figure 4. Cross Section (8575E) - New Drill Holes - Western Portion of 144 Gap Zone, please visit: http://media3.marketwire.com/docs/1030262FIG4F.pdf  

To view Figure 5. Cross Section (8875E) - New Drill Holes - Northeast Portion of 144 Gap Zone, please visit: http://media3.marketwire.com/docs/1030262FIG5F.pdf  



Contact

Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298

Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Lake Shore Gold Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.