• Montag, 23 Dezember 2024
  • 03:59 Uhr Frankfurt
  • 02:59 Uhr London
  • 21:59 Uhr New York
  • 21:59 Uhr Toronto
  • 18:59 Uhr Vancouver
  • 13:59 Uhr Sydney

Melkior Commences Diamond Drill Program on Carscallen Property near Timmins, Ontario

09.12.2015  |  Marketwire

OTTAWA, ONTARIO--(Marketwired - Dec. 9, 2015) - Melkior Resources Inc. ("Melkior") (TSX VENTURE:MKR)(OTC PINK:MKRIF)(FRANKFURT:MEK) would like to announce the commencement of a five hole, drill program on its 100% owned Carscallen gold project which is located approximately 25 kilometres west of the centre of Timmins, Ontario.

The first hole is located in the vicinity of the Aumo Shaft and on strike with a 2014 drill hole which intersected 39.2 g/t gold and 36.3 g/t silver over 0.3 metres. Recent surface samples (2015), were found to contain 1.73, 8.02 and 9.66 g/t gold. (Refer to Melkior's Press Releases; December 2, 2015, September 9, 2015 and February 18, 2015.)

The second hole will be drilled under a recent surface sample, found to contain 58.8 g/t gold on the Jowsey Vein. Nearby drill hole, CAR-86-2013 intersected 40.4 g/t gold over 0.65 metres about 30 metres south of the trace of the current hole.

Hole 3 is planned to intersect a new zone that has not been tested by drilling in the recent past. Surface samples (2015) from the Arsenic Zone were found to contain 1.30, 0.796, 0.479, 0.330 g/t gold.

The map below shows the relative locations of the proposed drill sites.

To view the map, please visit the following link: http://media3.marketwire.com/docs/1036191map.pdf

Two additional holes will be drilled to complete the program by mid-December.

The contents of this press release have been reviewed by Jens Hansen, P.Eng, President and Director and Wayne Holmstead, P.Geo, Qualified Persons as defined by National Instrument 43-101.

About Melkior:

Melkior is a mineral exploration company with gold exploration projects in West Timmins, Ontario and Launay, Quebec.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release may contain forward-looking statements that are subject to known and unknown risks and uncertainties that could cause actual results to vary materially from targeted results. Such risks and uncertainties include those described in Melkior's periodic reports including the annual report or in the filings made by Melkior from time to time with securities regulatory authorities.



Contact

Melkior Resources Inc.
Jens E. Hansen
President and CEO
613.680.1091
613.721.2919
info@melkior.com
www.melkior.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Melkior Resources Inc.
Bergbau
A2P0Z5
CA58549W3030
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.