Preliminary metallurgical recoveries average 97.5% at M1 and M3 prospects
Highlights
- Preliminary metallurgical test work at M1 and M3 returns high recoveries for oxide samples
- Potential to add ounces to existing heap leach Probable Ore Reserve of 440,000oz gold
- Ausdrill on site, resource definition drilling at M1 and M3 underway
Managing Director Richard Hyde commented:
“Preliminary metallurgical test work on oxide samples from M1 and M3 has returned average recoveries of 97.5%. This demonstrates that oxides from M1 and M3 are amenable to conventional cyanide processing techniques.
“Heap leach test work is continuing – including coarse feed bottle rolls being completed in Q1 2016.
“Gold mineralisation at M1 and M3 is located less than 2km from the proposed heap leach starter pit at M5.”
Click here to view the announcement.
http://www.fscwire.com/sites/default/files/news_release_pdf/westafrican12212015.pdf
www.westafricanresources.com
Source: West African Resources Ltd (TSX Venture:WAF)
Maximum News Dissemination by FSCwire. http://www.fscwire.com
Copyright © 2015 Filing Services Canada Inc.