• Montag, 22 Juli 2024
  • 18:34 Uhr Frankfurt
  • 17:34 Uhr London
  • 12:34 Uhr New York
  • 12:34 Uhr Toronto
  • 09:34 Uhr Vancouver
  • 02:34 Uhr Sydney

Oremex Silver Inc. Files Updated Resource Estimate for its Tejamen Silver Project in Durango Mexico

02.02.2016  |  The Newswire

Toronto, February 2, 2016 / TheNewswire / Oremex Silver Inc. (TSXV:OAG) ("Oremex" or the "Company") announced today that it has filed an updated National Instrument 43-101 technical report in respect of its Tejamen silver project in Durango, Mexico (the "Report"). The report was prepared by Gustavson Associates, LLC of Lakewood, Colorado ("Gustavson") and provides and updated resources estimate (as of December 10, 2015) for the project. The Report provides an estimated inferred resource of 19.8 million tonnes containing 28.7 million ounces of silver at 45.0 g/t and 15,700 ounces of gold at 0.025 g/t. The Report will be filed under the Company's profile on SEDAR at www.SEDAR.com.

The Report supersedes the "Technical Report - Tejamen Silver Property Durango State, Mexico Preliminary Mining Assessment", dated October 3, 2006 (the "Snowden Report") prepared by Snowden Mining Industry Consultants Inc. The preliminary economic assessment contained in the Snowden Report is no longer current and should not be relied on.

Summary of Tejamen Resource Estimate (effective December 10, 2015)

Inferred Mineral Resources

Cutoff g/t Ag

TONNES

Ag g/t

Ag Cont Oz

Au g/t

Au Cont Oz

Los Mantos

20

9,192,000

56.0

16,540,000

0.034

9,900

15

11,093,000

49.4

17,610,000

0.031

11,200

10

12,879,000

44.3

18,330,000

0.029

12,200

Cerro Prieto

20

6,790,000

45.7

9,970,000

0.016

3,500

15

7,760,000

42.2

10,520,000

0.016

4,000

10

8,590,000

39.3

10,860,000

0.016

4,300

Total

20

16,663,000

50.2

26,923,000

0.026

13,900

15

19,838,000

45.0

28,706,000

0.025

15,700

10

22,847,000

40.7

29,928,000

0.023

17,200

The 15 g/t Ag cutoff was chosen based on the value of the rock corresponding to the mining potential for a bulk cyanide heap leaching system at an operating cost of US$5/tonne. At today's silver price of US$14.00 to US$15.00/oz., a one half Troy ounce or 15 g/t Ag cutoff is appropriate for an inferred mineral resource. This is based on silver grades without contribution of gold.

The Snowden Report included a resource estimate at Tejamen of 22.6 million tonnes containing 48.6 million ounces of silver at 66.9 g/t and 36,400 ounces of gold at 0.05 g/t. The decrease in the mineral resource disclosed in the Report resulted from the careful examination by Gustavson of the geology and controls on the distribution of the silver with a more restrictive search on the steeper and higher grade feeder vein structures than was previously used.

All samples collected by Oremex were prepared in the ALS Chemex facility in Guadalajara, Mexico and assayed in the ALS Chemex facility in Vancouver, Canada. The ALS Chemex laboratory in Guadalajara is ISO 9001:2000 certified and the Vancouver facility is ISO 9001:2000 and ISO 17025 certified.

Qualified Person

Mr. Donald E. Hulse, P.E, SME-RM of Gustavson Associates, LLC, and an independent Qualified Person, has approved the scientific and technical information disclosed in this press release.

About Oremex Silver Inc.

Oremex is a Canadian company focusing on the exploration and development of silver projects along a highly productive mineralized belt in Mexico. The Company has a portfolio of silver projects including a mineral resource of 27.8 million ounces of silver (19.8 million tonnes at 45.0 g/t Ag) at its Tejamen deposit.

For further information, please contact:

Allan Folk

Interim Chief Executive Officer

Oremex Silver Inc.

E: Afolk.bb@gmail.com

www.oremexsilver.com

Cautionary Note Regarding Forward-Looking Statements

Forward-Looking Statements: The above contains forward-looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward-looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry. Forward-looking statements in this release include statements regarding future exploration programs, operation plans, geological interpretations, mineral tenure issues and mineral recovery processes. Although we believe the expectations reflected in our forward looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

/NOT FOR DISTRIBUTION TO UNITED STATES WIRE SERVICES OR DISSEMINATION IN THE UNITED STATES/

Copyright (c) 2016 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Monarca Minerals Inc.
Bergbau
A2DYWF
CA60916Q1090

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.