West African Resources Limited hits 6m at 9.2g/t Au from 15m at M1 South
Highlights
- RC drilling returns 6m at 9.2g/t Au from 15m, including 1m at 49.5g/t Au
- Results over 350m strike, open to the northwest
- Further round of step-out drilling at M1 North planned
- Drilling in progress at M1 South targeting deeper mineralisation at 100m vertical
- Feasibility study commenced – funded by $12.5m oversubscribed institutional capital raising
Managing Director Richard Hyde commented:
“Infill shallow RC drilling at the M1 South prospect has shown good continuity with strong results from TAN16-RC154 returning 6m at 9.2g/t Au from 15m, including 1m at 49.5g/t Au in the hanging wall zone, and 4m at 6.19g/t Au from 59m, including 2m at 10.36g/t Au in the footwall zone.
“New results confirm continuity of high grade open-pitable gold mineralisation at the M1 South prospect. Deeper drilling is currently in progress at M1 South, with one RC rig and two diamond rigs working.”
Click here for the ASX announcement
http://email.launchpadcreative.com.au/t/r-l-slkhkg-qyhlitldk-y/
www.westafricanresources.com