• Freitag, 22 November 2024
  • 02:29 Uhr Frankfurt
  • 01:29 Uhr London
  • 20:29 Uhr New York
  • 20:29 Uhr Toronto
  • 17:29 Uhr Vancouver
  • 12:29 Uhr Sydney

Unity Completes Drilling at Miller's Crossing Lithium Project, Nevada

05.07.2016  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jul 5, 2016) - Unity Energy Corp. (TSX VENTURE:UTY)(FRANKFURT:UJN2) "Unity" or the "Company" is pleased to announce that it has completed first pass drilling (announced on June 14th, 2016) at its 100% owned Miller's Crossing Lithium Project in Southern Nevada. The drilling was intended to follow up on positive surface sampling, which was carried out in April 2016 and confirmed the presence of lithium in alluvial gravels and clays. The maximum values for lithium in sediments from the surface program was 81 ppm, with an average of 46 ppm (see NR of June 8th, 2016).

A total of 7 holes were completed, generating 22 intersections of interest. All holes encountered brown clays as well as silty brown sands and grey fine to coarse-grained sand intervals. In addition, two water samples were collected where the water table was encountered within each drillhole as well as selective sampling of salt at surface. Samples have been submitted for laboratory analysis, specifically targeting methods appropriate for detecting lithium, boron and potassium concentration in samples.

The samples have been shipped to WETLAB Western Environmental Testing Laboratory in Sparks, Nevada, an EPA accredited independent laboratory. Samples are to be analyzed for lithium, potassium, boron, and magnesium using Standard Methods for the Examination of Water and Wastewater, Online Edition, Methods for Determination of Organic Compounds in Drinking Water, EPA--600/4--79--020, and Test Methods for Evaluation of Solid Waste, Physical/Chemical Methods (SW846), Third Edition. Laboratory will use its own quality control and quality assurance protocols for sample analysis.

In addition, the Company has terminated its option for the Gulch Mine Uranium Project, so as to focus on the Carter Lake Uranium Project. Carter Lake is located in an exploration corridor located adjacent to the corridor that hosts the prolific PLS (Fission) and Arrow discoveries (Nexgen's).

Regarding the completion of the drill program, CEO Ian Graham commented, "The Company is very pleased to have completed this important phase of exploration, which will guide our subsequent endeavors at Miller's Crossing, including, if warranted, RC drilling and pump testing."

The technical contents of this news release have been prepared under the supervision of Dr. Peter Born, P. Geo. Dr. Born is a Qualified Person, as that term is defined in National Instrument 43-101, and has approved this news release.

On Behalf of the Company,

Anita Algie, President

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contact

Unity Energy Corp.
604-681-0004
www.unityenergycorp.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Bedford Metals Corp.
Bergbau
A3DZER
CA0762301012
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.