• Freitag, 29 November 2024
  • 04:41 Uhr Frankfurt
  • 03:41 Uhr London
  • 22:41 Uhr New York
  • 22:41 Uhr Toronto
  • 19:41 Uhr Vancouver
  • 14:41 Uhr Sydney

Feasibility Studies Progressing to Plan - Study Manager Appointed

07.07.2016  |  FSCwire

Vancouver, British Columbia (FSCwire) - Asiamet Resources Ltd. ("ARS" or the “Company”) is pleased to advise that excellent progress is being made on the key long lead time items required for the Beruang Kanan Main (“BKM”) feasibility study. Field programs are now fully operational and Mr Mark Young, a proven leader of mineral resources and infrastructure developments globally, has been appointed to lead the owners team for the study.

Mark is a Principal of VCI Development and holds a Bachelor of Engineering (Minerals Processing) from the University of Queensland, with post graduate qualifications in applied finance and investment, along with strategy and business management, from the London School of Economics.  He has led project teams in numerous countries and commodities for both entrepreneurial explorer-developers and major mining companies. Over the past ten years, he has been extensively involved in greenfield mine developments, including the Amaam coal project in Russia for Tigers Realm Coal and BHP Billiton's major potash developments in Canada.  He has also worked on BHP Billiton's Chilean copper projects and on Rio Tinto’s coal and iron ore operations in Australia.

At the BKM site a comprehensive Resource infill and extension drilling program is underway to upgrade a majority of the Inferred Mineral Resource i.e. 49.7million tonnes grading 0.6% Cu containing 657 million pounds of copper at (0.2% Cu reporting cut), to the Measured and Indicated Mineral Resource categories. Four drills are operational with 13 holes/1585 meters of diamond core drilling completed to date. Two large diameter (PQ size) core holes have also been completed to collect fresh bulk samples for detailed metallurgical testwork. Approximately 100 holes/9000 meters of Resource drilling and 15 holes/2000 meters of metallurgy drilling is planned. First assay results are expected within the next week.

The Company has also contracted a number of the key consultants and service providers required to oversee the long lead time items of the feasibility study and work programs in each of the key disciplines are underway. The various consultants and a summary of the work scope for each is provided below. Local Indonesian consultants, service providers and manpower are being utilized wherever possible.

PT Indodrill Indonesia: Large diameter core drilling (metallurgy samples)

PT Intertek Utama Services: Drilling and Environmental Assays

Hackman & Associates: Geology and Mineral Resources

  • Drill program design
  • Resource Modelling and Mineral Resource Estimation. 

Millermet and CORE Laboratories: Detailed metallurgical test-work program, interpretations and evaluation comprising

  • Overall copper recovery evaluation
  • Resource-wide assessment of ore treatment characteristics and variability
  • Short-column and Long-column Leach tests
  • Solvent extraction analysis
  • Quantitative mineralogical assessments
  • Comminution and agglomeration tests
  • Geo-mechanical assessments and composite derivations
  • Materials handling assessments
  • Geochemical assessments
  • Leach kinetics characterization
  • Geotechnical, geo-mechanical, geochemical and water management design criteria
  • Basis of design for crushing and agglomeration, heap leach and SX-EW facilities
  • Process selection and block flow diagrams including process simplification assessment

PT Lorax: Environmental Geoscience and Hydrology

  • Geochemical assessment and waste rock properties characterization
  • Hydrology and groundwater surveys
  • Development of environmental controls basis of design criteria, including water and waste dump management parameters

Asiamet Resources CEO Tony Manini commented

”The BKM feasibility study represents a major de-risking phase for the project, the outcomes of which will be used by a wide range of stakeholders, including potential financiers, to assess the project’s viability. Securing the services of such a highly experienced study manager as Mark Young to lead this critically important phase in the life of the project is extremely pleasing. We have also assembled a first class team of consultants and service providers and now look forward to advancing the studies and progressively receiving results, which will be reported as they become available. A comprehensive infill and extension drilling program is well underway and we anticipate receiving and reporting the first drill results from this exciting program shortly.

As the feasibility study work programs are being advanced, important corporate activities continue to be progressed. Renewal of existing permits and conversion of licences for the Beutong and Jelai projects are in the final stages of processing and corporate joint venture - partnership initiatives to ensure we are well placed to complete the feasibility studies are actively being pursued. We look forward to providing all our stakeholders with regular updates and a strong news flow during this exciting next stage of the Company’s development.”

Qualified Person

Data disclosed in this press release have been reviewed and verified by ARS’s qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules.

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Deputy Chairman and CEO

For further information please contact:

-Ends-

Tony Manini


Deputy Chairman and CEO, Asiamet Resources Ltd.
Telephone: +61 3 8644 1300
Email: tony.manini@asiametresources.com

FlowComms Limited

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / Mehrdad@flowcomms.com
 

Asiamet Resources Nominated Adviser


RFC Ambrian Limited

Andrew Thomson / Oliver Morse

Telephone: +61 8 9480 2500

Email: Andrew.Thomson@rfcambrian.com / Oliver.Morse@rfcambrian.com

VSA Capital Limited


Andrew Raca / Justin McKeegan

Telephone: +44 20 3005 5004 / +44 20 3005 5009

Email: araca@vsacapital.com

Optiva Securities Limited


Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company’s current expectations and estimates. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “suggest”, “indicate” and other similar words or statements that certain events or conditions “may” or “will” occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements.   Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices.  There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.  Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/Asiamet07062016.pdf

Source: Asiamet Resources Ltd. (TSX Venture:ARS, AIM:ARS) www.asiametresources.com

Maximum News Dissemination by FSCwire. http://www.fscwire.com

Copyright © 2016 Filing Services Canada Inc.






Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Asiamet Resources Ltd.
Bergbau
A14XBY
BM04521V1038
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.