Azarga Metals Reports New Drill Hole Assays Including Seven Meters of 244.1g/t Silver and 1.95% Copper
TSX-V: AZR
VANCOUVER, Sept. 19, 2016 /CNW/ - AZARGA METALS CORP. ("Azarga Metals" or the "Company") (TSX-V:AZR) announces assay results from drill-hole AM-001 at its Unkur Silver-Copper Project in the Zabaikalsky administrative region of eastern Russia.
AM-001 intersected 40 meters at 65.9g/t silver and 0.74% copper (ie, 124.1g/t silver equivalent or 1.58% copper equivalent using US$18.84/oz silver price and US$2.16/lb copper price and assuming 100% recoveries) from 82.5 meters to 122.5 meters. Within that intersection were two sub-sections of note, being:
- 22 meters at 111.9g/t silver and 1.13% copper (ie, 200.7g/t silver equivalent or 2.55% copper equivalent using US$18.84/oz silver price and US$2.16/lb copper price and assuming 100% recoveries) from 82.5 meters to 104.5 meters, which in turn included:
- 7 meters at 244.1g/t silver and 1.95% copper (ie, 397.4g/t silver equivalent or 5.05% copper equivalent using US$18.84/oz silver price and US$2.16 copper price and assuming 100% recoveries) from 85.5 meters to 92.5 meters.
Azarga Metals' president and CEO Dorian L. (Dusty) Nicol commented, "AM-001 exceeded expectations in terms of both thickness and grades. In particular, we are seeing the silver potential being confirmed compared to the historical data that had less information available for silver vis-à-vis copper."
AM-001's location extends the strike length a further 300 meters further north-northwest of previously reported drill-hole AM-003, which intersected 16 meters at 84.0 g/t silver and 0.79% copper (see news release dated 1 September 2016).
The results from AM-001 are extremely encouraging. It was drilled to confirm the results of historic hole C-118 which reported an intersection of 23 meters at 0.73% copper with no silver assay recorded. The historic hole had only 40% core recovery and the results from hole AM-001 (which had 95% core recovery) support the contention that historic drilling may have understated thickness and grade of the Unkur mineralization.
Note: Drill intercepts are reported as drilled and may not be representative of true thicknesses. Drill holes have been sited to attempt to intersect mineralization as close to perpendicular as possible, but there is not sufficient information about geometry of the mineralization at this time to estimate true thicknesses. A Quality Assurance / Quality Control program is part of the sampling program at Unkur. This program includes chain of custody protocols as well as systematic submittals of standards, duplicates and blank samples into the flow of samples produced by the sampling including check assays of approximately 10% of the samples by another certified laboratory. Samples were analyzed at SGS Vostok Limited in Chita, Russia. Check assays will be analyzed at ALS Geochemistry in Chita, Russia.
DRILLING UPDATE
Four additional drill-holes have been completed at Azarga Metals' Unkur Silver-Copper Project since the last drilling update of 1 September 2016, bringing the total completed drill-holes to eight. Assays for four of those holes have been received as per the map and tables below.
Table 1: Location details for Unkur phase one drilling program completed holes to date | ||||||||||||||||
Hole ID | East | North | RL | Dip | Azimuth | Hole | EOH | Recovery | ||||||||
AM-001 | 56.84 | 118.57 | 929m | 70° | 253° | DD | 401m | 95% | ||||||||
AM-003 | 56.84 | 118.57 | 931m | 70° | 254° | DD | 96m | 95% | ||||||||
AM-004 | 56.84 | 118.57 | 931m | 70° | 244° | DD | 383m | 95% | ||||||||
AM-005 | 56.84 | 118.57 | 930m | 70° | 242° | DD | 160m | 95% | ||||||||
AM-007 | 56.83 | 118.58 | 928m | 70° | 239° | DD | 80m | 95% | ||||||||
AM-009 | 56.82 | 118.58 | 976m | 70° | 236° | DD | 225m | 95% | ||||||||
AM-011 | 56.82 | 118.59 | 960m | 70° | 234° | DD | 179m | 95% | ||||||||
AM-013 | 56.82 | 118.59 | 1,000m | 70° | 231° | DD | 100m | 95% |
Table 2: Unkur phase one drilling program assays reported to date (incl. this report) | ||||||||||
Hole ID | Intersection | From | To | Silver | Copper | |||||
AM-001 | 40m | 82.5m | 122.5m | 65.9g/t | 0.74% | |||||
- AM-001 sub-section | 22m | 82.5m | 103.5m | 111.9g/t | 1.13% | |||||
- AM-001 sub-section | 7m | 85.5m | 92.5m | 244.1g/t | 1.95% | |||||
AM-003 | 16m | 56.5m | 72.5m | 84.0g/t | 0.79% | |||||
- AM-003 sub-section | 5m | 59.5m | 64.5m | 200.4g/t | 1.39% | |||||
AM-007 | 10m | 49.0m | 59.0m | 20.2g/t | 0.29% | |||||
Notes: n = full reported intersection and n = sub-section contained within the relevant full reported intersection. |
In addition to the above, data for drill-hole AM-005 has been collated showing no mineralization of interest. It is now understood that the hole was likely stopped short of the anticipated mineral horizon. A drill rig is currently being moved to drill a new hole (AM-017) approximately 50 meters to the west of AM-005.
FIRST PHASE DRILLING PROGRAM
Azarga Metals is now almost halfway through its first phase drilling program, which aims to drill approximately 3,000 cumulative linear meters. The two drill rigs currently at Unkur are expected to operate through the end of October. Assays for the program should continue to be received by the Company in the period through to December.
Further details of the first phase drilling program at Unkur were contained in the Company's news release of 2 June 2016.
UNKUR SILVER-COPPER PROJECT
Azarga Metals owns 60% of the Unkur Silver-Copper Project along with the right to acquire the remaining 40% in the future.
Sediment-hosted copper and silver mineralization has been identified across the 5,390 hectare project license area, in outcrops, trenches and by historical diamond drilling. The prior exploration outlined a large area of high-grade shallow stratiform sediment hosted copper and silver 20 to 50 meters thick over an area four to six kilometers long.
Further details concerning Unkur Silver-Copper Project are contained in a technical report filed by the Company as per its news release of 5 April 2016.
Qualified Person
The Company's President and Chief Executive Officer, Dorian L. (Dusty) Nicol, B.Sc. Geo, MA Geo, a Qualified Person as defined by NI 43-101, has reviewed and approved the exploration information disclosures contained in this Press Release.
About Azarga Metals Corp.
Azarga Metals is a mineral exploration and development company that owns 60% of the Unkur Silver-Copper Project in the Zabaikalsky administrative region in eastern Russia.
AZARGA METALS CORP.
"Dusty Nicol"
Dorian L. (Dusty) Nicol, President and CEO
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statement:
This news release contains forward-looking statements that are based on the Corporation's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current planned exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Corporation disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
SOURCE Azarga Metals Corp.
Contact
Doris Meyer, at +1 604 536-2711 ext 6, or visit www.azargametals.com