NexGen Intersects Widespread Mineralization at Arrow

18.11.2016  |  CNW

VANCOUVER, Nov. 18, 2016 /CNW/ - NexGen Energy Ltd. ("NexGen" or the "Company") (TSX:NXE, OTCQX:NXGEF) is pleased to report radioactivity results from 38 holes representing the conclusion of our highly successful summer drilling program on our 100% owned, Rook I property, Athabasca Basin, Saskatchewan.

At Arrow, strong mineralization continues to be drilled outside of the A2 High Grade Domain. Drill hole AR-16-112c2 intersected 39.0 m of total composite mineralization including 9.1 m of off-scale radioactivity (>10,000 cps with handheld RS-120 scintillometer) drilled below the grade shell of the A2 High Grade Domain. Drill hole AR-16-111c2 featured 5.0 m of minimum-greater-than-61,000 cps radioactivity also outside of the A2 High Grade Domain.  Additionally, drill hole AR-16-104c2 intersected 38.5 m of total composite mineralization including 5.05 m of off-scale radioactivity in the A2 shear with the strongest mineralization drilled 32 m below the A2 High Grade Domain.

With respect to infill drilling, the A2 shear continues to exceed expectations where scissor holes AR-16-106c1 and AR-16-111c1 intersected 63.0 m of total composite mineralization including 12.1 m of off-scale radioactivity and 49.5 m of total composite mineralization including 10.85 m of off-scale radioactivity, respectively. Significant mineralization in the A2 shear was also intersected in drill holes AR-16-104c3, -105c2, -106c2, -108c3, -108c4, -109c1, -109c3, -110c1 and -110c2 (see Figure 1).

Also at Arrow, the A3 shear has been significantly expanded where drill hole AR-16-105c1 intersected 70.5 m of total composite mineralization including 7.9 m of off-scale radioactivity. In addition, drill holes AR-16-105c2, -105c3, -110c1, -110c2 and -113c1 all intersected significant mineralization in the A3 shear (see Figure 2). In the A1 shear, AR-16-108c3 intersected 18.0 m of total composite mineralization including 3.5 m of off-scale radioactivity (see Figure 3).

At Harpoon, a total of 16 holes have been completed since the high grade discovery hole HP-16-08 was reported on August 11, 2016. Several holes intersected broad zones of mineralization including off-scale radioactivity beginning at approximately 200 m below surface. Drill hole HP-16-13 intersected 16.5 m of continuous mineralization including 2.95 m of off-scale radioactivity and HP-16-20 intersected 12.5 m of total composite mineralization including 2.15 m of off-scale radioactivity. The mineralized footprint at Harpoon has been traced over a strike length of at least 340 m on the Rook I property (Figure 5), and remains open in all directions.

A total of 53 assays remain pending from the 2016 drill program; 33 from Arrow (including four A2 Sub-Zone holes) and 20 holes from the Harpoon Discovery. In 2016 a total of 96,992 m were drilled at Rook I.  A total of 73,091 m were drilled at the Arrow Deposit (132,887 m in total to date), 7,285 m Harpoon and 16,616 m on regional targets along the Patterson Corridor. Once all pending 2016 assays are received for Arrow, the results will be incorporated into an updated NI 43-101 resource scheduled for release in H1 2017. In addition to the significant growth achieved during the year, the bulk of the A2 High Grade Domain has now been delineated at a drill hole spacing of 25 m x 25 m or less.

Highlights:

A2 High Grade Domain

  • Scissor Hole AR-16-111c2 (40 m up-dip and southwest from AR-15-44b) intersected 39.0 m of total composite mineralization including 12.8 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 60.0 m section (524.5 to 584.5 m), and featured 5.0 m of minimum-greater-than-61,000 cps.
  • Scissor hole AR-16-106c1 (97 m down-dip from AR-15-44b) intersected 63.0 m of total composite mineralization including 12.1 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 117.5 m section (407.5 to 525.0 m), and featured 2.5 m of minimum-greater-than-61,000 cps.  
  • Scissor hole AR-16-112c2 (126 m down-dip and southwest from AR-15-44b) intersected 37.0 m of total composite mineralization including 9.1 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 45.0 m section (567.0 to 612.0 m), and featured 1.65 m of minimum-greater-than-61,000 cps. 
  • Scissor hole AR-16-111c1 (77 m up-dip and southwest from AR-15-44b) intersected 49.5 m of total composite mineralization including 10.85 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 135.5 m section (436.0 to 571.5 m), and featured 1.0 m of minimum-greater-than-61,000 cps. 
  • Scissor hole AR-16-106c2 (116 m up-dip from AR-15-44b) intersected 41.0 m of total composite mineralization including 9.7 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 72.5 m section (424.0 to 496.5 m), and featured 0.5 m of minimum-greater-than-61,000 cps. 
  • Scissor hole AR-16-104c2 (130 m down-dip and southwest from AR-15-44b) intersected 38.5 m of total composite mineralization including 5.05 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 101.5 m section (631.5 to 733.0 m), and featured 0.5 m of minimum-greater-than-61,000 cps. 

A3 Shear

  • Scissor hole AR-16-105c1 (41 m down-dip from AR-15-57c2) intersected 70.5 m of total composite mineralization including 7.9 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 136.0 m section (588.5 to 724.5 m).
  • Scissor hole AR-16-113c1 (64 m down-dip and northeast from AR-15-57c2) intersected 27.0 m of total composite mineralization including 3.2 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 137.5 m section (562.5 to 700.0 m).
  • Scissor hole AR-16-105c2 (26 m up-dip from AR-15-57c2) intersected 40.5 m of total composite mineralization including 3.1 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 83.0 m section (536.0 to 619.0 m).

A1 Shear

  • Hole AR-16-108c3 (198 m up-dip and northeast of AR-16-98c1) intersected 18.0 m of total composite mineralization including 3.5 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 60.0 m section (394.0 to 454.0 m).

Harpoon

  • Hole HP-16-13 (34 m down-dip and southwest of HP-16-08) intersected 16.5 m of continuous mineralization (212.5 to 229.0 m) including 2.95 m of total composite off-scale radioactivity (>10,000 to >61,000 cps).
  • Hole HP-16-20 (73 m up-dip and northeast of HP-16-08) intersected 12.5 m of total composite mineralization including 2.15 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 25.0 m section (183.5 to 208.5 m).

 

Table 1: Higher Grade A2 Sub-Zone Angled Drill Holes




2015

AR-15-
59c22

AR-15-
54c12

AR-15-
58c12

AR-15-
622

AR-15-
44b2

AR-15-
49c22

AR-15-
57c32

Total composite mineralization =

75.5m

42.0m

86.0m

143.0m

135.6m

73.5m

62.5m

Total Off-scale (>10,000 to 29,999 cps)3 =

11.4m

5.9m

14.3m

17.8m

30.3m

15.7m

4.4m

Total Off-scale (>30,000 to 60,999 cps)3 =

4.5m

3.0m

3.9m

10.6m

7.8m

5.2m

2.5m

Total Off-scale (>61,000 cps)3 =

1.0m

0.5m

2.0m

2.0m

1.5m

2.2m

1.8m

Assay Result (U3O8) =

36.5m
at
10.11%

27.5 m
at
10.09%

11.0m
at
30.62%

78m 
at
10.00%

56.5m
at
11.55%

59.5m
at
10.13%

31.5m
at
10.03%

and

15.5m
at
10.01%



Winter 2016

AR-16-
81c32

AR-16-
76c42

AR-16-
76c12

AR-16-
76c32

AR-16-
63c12

AR-16-
63c32

AR-16-
86c12

AR-16-
74c12

AR-16-
63c22

AR-16-
91c22

AR-16-
64c32

AR-16-
64c22

AR-16-
64c12

AR-16-
72c22

AR-16-
78c12

AR-16-
78c42

Total composite mineralization =

48.5m

105.7m

73.5m

67.5m

55.5m

147.0m

90.0m

88.0m

138.0m

89.0m

102.0m

76.0m

74.0m

93.0m

64.0m

120.5m

Total Off-scale (>10,000 to 29,999 cps)3 =

5.2m

19.9m

14.8m

14.9m

6.9m

22.1m

8.8m

21.2m

17.1m

13.4m

18.8m

16.0m

10.3m

7.0m

11.6m

25.8m

Total Off-scale (>30,000 to 60,999 cps)3 =

4.0m

1.0m

2.8m

5.0m

0.5m

3.0m

2.3m

1.2m

9.9m

6.0m

2.5m

4.7m

3.7m

0.5m

3.0m

6.2m

Total Off-scale (>61,000 cps)3 =

2.5m

0.0m

5.3m

4.5m

0.0m

0.5m

2.0m

0.0m

13.9m

3.0m

0.0m

5.5m

0.0m

1.7m

2.5m

5.5m

Assay Result (U3O8) =

23m 
at
17.19%

10m 
at
5.15%

67.5m
at
11.29%

50m 
at
15.05%

8m 
at
20.15%

15m 
at
8.28%

19.0m
at
20.40%

47m 
at
3.41%

42m 
at
15.20%

40.5m
at
12.69%

14m 
at
10.30%

48.5m
at
11.15%

12.5m
at
20.4%

33.5m
at
4.65%

37.5m
at
12.94%

37.5m
at
17.60%

and

14.5m
at
5.08%

and

16m
 at
2.21%

46.5m
at
12.99%

and

11.0m
at
4.08%



Summer 2016

AR-16-
92c32

AR-16-
112c2

AR-16-
111c2

AR-16-
98c22

AR-16-
106c1

AR-16-
93c22

AR-16-
96c22

AR-16-
91c42

AR-16-
108c21

Total composite mineralization =

49.5m

37.0m

39.0m

85.0m

63.0m

69.5m

60.5m

78.5m

69.5m

Total Off-scale (>10,000 to 29,999 cps)3 =

7.1m

5.45m

5.8m

3.3m

7.8m

8.15m

8.9m

6.1m

17.05m

Total Off-scale (>30,000 to 60,999 cps)3 =

1.4m

2.0m

2.0m

1.0m

1.8m

1.5m

3.5m

2.05m

0.5m

Total Off-scale (>61,000 cps)3 =

2.3m

1.65m

5.0m

5.75m

2.5m

1.5m

1.0m

1.5m

0.5m

Assay Result (U3O8) =

12m  
at
12.02%

Pending

Pending

55m 
 at
10.12%

Pending

12m 
 at
20.21%

10m 
 at
15.73%

12m
 at
16.70%

Pending

14m
 at
18.21%

and


1 radioactivity results previously released

2 radioactivity and assays results previously released

3 minimum radioactivity using RS-120 gamma spectrometer

Assay results shown are high grade sub-intervals of composite assay lengths at a cut-off grade of 0.01% U3O8 and may include up to 2m of internal dilution

All intervals are core lengths, true thicknesses are yet  to be determined




 

Activities & Financial

  • The summer 2016 program is now concluded and preparations for a fully-funded significant winter drilling program to begin in January 2017 are well underway.  
  • An updated NI 43-101 resource estimate on the Arrow Deposit is scheduled for the first half of 2017.
  • The Company has cash on hand of approximately $74 million.

Drill hole location maps and long sections are shown in Figures 1 to 6. Summaries of Arrow and Harpoon mineralized drill intervals are provided in Tables 2 and 3.

Garrett Ainsworth, Vice-President, Exploration and Development, commented: "Drilling across the mineralized shears at Arrow has significantly expanded the known extents of mineralization which remains largely open, while also meeting or exceeding our expectations on infill drilling.  The recent Harpoon Discovery continues to return impressive results, and remains open in all directions.  We have begun analyzing the drill data in preparation for an aggressive winter 2017 drill program."     

Leigh Curyer, Chief Executive Officer, commented: "The exploration and delineation progress made at the Arrow Deposit, and on the rest of the Rook I property in 2016 has been outstanding. The continuity of mineralization as well as the ability of the deposit to continue expanding throughout 2016 will culminate in an updated resource estimate in H1 2017.  Whilst drilling just shy of 100,000 m in 2016 has delivered further optimization of Arrow and a significant new discovery in Harpoon, substantial drilling is still required in the future prior to being in a position to ultimately estimate the true extent of Arrow.  Further, the Company has undertaken studies that will continue into 2017 to form the basis of a maiden pre-feasibility study scheduled for release in H2 2017 .  With $74 million in the treasury we remain in a very strong financial position to execute our objectives well into the future." 

Table 2: Arrow Deposit Drill Hole Data

Drill Hole

Athabasca
Group -
Basement
Unconformity
Depth (m)

Handheld Scintillometer Results (RS-120)

Hole ID

Azimuth

Dip

Total
Depth
(m)

From (m)

To (m)

Width (m)

CPS Range

AR-16-102c3

327

-70

795.00

129.60

370.00

374.00

4.00

<500 -  3150

378.50

385.50

7.00

<500 -  22500

388.00

403.00

15.00

<500 -  26000

406.50

408.50

2.00

<500 -  4500

415.00

418.00

3.00

<500 -  33000

447.50

448.00

0.50

<500 -  560

452.50

453.00

0.50

<500 -  530

464.00

467.00

3.00

<500 -  830

470.00

475.50

5.50

<500 -  6200

541.50

544.00

2.50

<500 -  16500

626.50

629.00

2.50

<500 -  1400

657.50

658.00

0.50

<500 -  530

692.50

693.00

0.50

<500 -  520

708.00

713.50

5.50

<500 -  20000

716.00

736.00

20.00

<500 -  37000

741.50

742.00

0.50

<500 -  720

AR-16-104c2

327

-70

936.00

128.80

514.50

519.50

5.00

<500 -  4000

554.00

556.50

2.50

<500 -  2000

563.00

565.00

2.00

<500 -  900

572.50

573.50

1.00

<500 -  750

579.00

579.50

0.50

<500 -  570

592.50

599.50

7.00

<500 -  2800

602.50

603.00

0.50

<500 -  550

607.00

609.00

2.00

<500 -  2300

612.00

615.50

3.50

<500 -  840

631.50

660.00

28.50

<500 -  >61000

667.00

668.50

1.50

<500 -  5100

684.00

684.50

0.50

<500 -  870

693.00

694.00

1.00

<500 -  1300

696.50

699.50

3.00

<500 -  1300

703.00

706.50

3.50

<500 -  9600

732.50

733.00

0.50

600 -  1000

AR-16-104c3

327

-70

858.00

128.80

517.00

517.50

0.50

<500 -  800

526.00

526.50

0.50

<500 -  7000

533.50

537.00

3.50

<500 -  3000

541.00

543.50

2.50

<500 -  12000

549.00

550.00

1.00

<500 -  4500

553.50

554.00

0.50

<500 -  520

556.50

558.50

2.00

<500 -  22000

563.00

564.50

1.50

<500 -  700

573.00

598.50

25.50

<500 -  2400

601.00

602.50

1.50

<500 -  980

606.00

606.50

0.50

<500 -  630

612.00

616.50

4.50

<500 -  1000

634.00

636.50

2.50

<500 -  900

640.00

648.00

8.00

<500 -  3100

655.00

655.50

0.50

<500 -  570

661.50

663.00

1.50

<500 -  950

668.50

673.00

4.50

<500 -  >61000

676.50

680.00

3.50

<500 -  16000

682.50

697.50

15.00

<500 -  >61000

707.00

719.00

12.00

<500 -  27000

723.00

751.50

28.50

<500 -  26000

754.00

778.00

24.00

<500 -  20000

AR-16-105c1

327

-70

963.00

129.00

482.00

489.00

7.00

<500 -  2400

493.50

502.00

8.50

<500 -  6650

537.00

538.00

1.00

<500 -  1600

542.50

545.00

2.50

<500 -  13000

547.50

550.00

2.50

<500 -  26000

552.50

554.00

1.50

<500 -  7500

557.50

559.00

1.50

<500 -  7600

564.50

569.00

4.50

<500 -  2150

575.50

580.00

4.50

<500 -  17000

588.50

589.00

0.50

1500 -  40000

593.50

597.50

4.00

<500 -  6300

600.00

604.00

4.00

<500 -  49000

609.00

616.00

7.00

<500 -  59000

619.00

632.50

13.50

<500 -  >61000

635.50

636.50

1.00

<500 -  3600

641.50

652.50

11.00

<500 -  >61000

656.50

670.00

13.50

<500 -  3200

672.50

673.00

0.50

<500 -  900

691.00

691.50

0.50

<500 -  560

705.50

718.00

12.50

<500 -  38000

722.00

724.50

2.50

<500 -  4850

738.50

770.00

31.50

<500 -  33000

773.50

774.50

1.00

<500 -  1300

816.00

817.00

1.00

<500 -  700

849.50

852.50

3.00

<500 -  5200

858.00

858.50

0.50

<500 -  1500

911.00

911.50

0.50

<500 -  1900

915.00

915.50

0.50

<500 -  840

AR-16-105c2

327

-70

840.00

129.00

452.50

456.50

4.00

<500 -  680

462.00

463.00

1.00

<500 -  1230

473.00

473.50

0.50

<500 -  1950

476.50

478.00

1.50

<500 -  1180

482.00

482.50

0.50

<500 -  600

507.00

507.50

0.50

<500 -  1290

526.50

529.50

3.00

<500 -  5200

536.00

536.50

0.50

900 -  14500

541.00

543.50

2.50

<500 -  25500

560.50

564.50

4.00

<500 -  26700

571.00

585.00

14.00

<500 -  52500

588.50

595.50

7.00

<500 -  57400

598.00

604.50

6.50

<500 -  8820

607.00

612.50

5.50

<500 -  2780

618.50

619.00

0.50

<500 -  650

639.50

640.00

0.50

<500 -  1200

664.50

665.50

1.00

<500 -  1150

668.50

681.00

12.50

<500 -  >61000

692.00

693.50

1.50

<500 -  4300

697.50

715.50

18.00

<500 -  >61000

720.50

723.00

2.50

<500 -  12000

AR-16-105c3

327

-70

933.50

129.00

489.50

492.50

3.00

<500 -  2100

530.00

531.00

1.00

<500 -  3400

542.00

542.50

0.50

<500 -  1400

562.50

565.00

2.50

<500 -  6200

567.50

571.50

4.00

<500 -  24000

575.50

577.00

1.50

<500 -  4000

620.00

621.00

1.00

<500 -  8400

627.50

628.00

0.50

<500 -  520

632.50

639.00

6.50

<500 -  14000

644.50

645.50

1.00

<500 -  8000

648.50

662.00

13.50

<500 -  22000

665.50

666.50

1.00

<500 -  700

669.50

675.50

6.00

<500 -  34000

678.00

685.00

7.00

<500 -  14000

687.50

690.00

2.50

<500 -  14000

694.50

705.00

10.50

<500 -  6200

715.50

716.00

0.50

<500 -  520

741.00

741.50

0.50

<500 -  550

747.50

748.50

1.00

<500 -  3500

760.00

760.50

0.50

<500 -  600

768.00

769.00

1.00

<500 -  2300

775.50

776.00

0.50

<500 -  2600

782.00

790.00

8.00

<500 -  8500

796.50

797.50

1.00

<500 -  2100

801.50

804.50

3.00

<500 -  8000

810.00

811.00

1.00

<500 -  1600

815.00

815.50

0.50

<500 -  550

834.50

835.00

0.50

<500 -  550

851.50

852.00

0.50

<500 -  900

AR-16-106c1

327

-69

795.00

132.20

407.50

408.00

0.50

<500 -  525

427.50

434.50

7.00

<500 -  3400

439.50

447.50

8.00

<500 -  3300

452.00

453.00

1.00

<500 -  1600

462.50

469.00

6.50

<500 -  3900

473.50

512.00

38.50

<500 -  >61000

523.50

525.00

1.50

<500 -  1400

546.00

548.50

2.50

<500 -  1500

598.00

599.50

1.50

<500 -  1200

616.00

616.50

0.50

<500 -  510

631.00

631.50

0.50

<500 -  830

683.00

696.00

13.00

<500 -  2500

699.50

703.50

4.00

<500 -  23000

707.00

709.50

2.50

<500 -  980

721.00

721.50

0.50

<500 -  1380

727.50

728.00

0.50

<500 -  640

752.00

752.50

0.50

<500 -  550

AR-16-106c2

327

-69

822.00

132.20

424.00

427.50

3.50

<500 -  2300

430.00

436.50

6.50

<500 -  2100

439.50

443.50

4.00

<500 -  1600

451.00

468.50

17.50

<500 -  >61000

474.50

481.50

7.00

<500 -  58000

489.50

490.50

1.00

<500 -  1300

495.00

496.50

1.50

<500 -  2500

511.00

511.50

0.50

<500 -  1300

571.00

571.50

0.50

<500 -  580

577.00

580.00

3.00

<500 -  1500

589.00

589.50

0.50

<500 -  760

645.00

645.50

0.50

<500 -  530

701.50

702.00

0.50

<500 -  750

757.00

768.50

11.50

<500 -  10500

AR-16-107c1

327

-70

945.50

121.90

480.50

481.00

0.50

<500 -  630

537.50

538.00

0.50

<500 -  570

547.00

549.50

2.50

<500 -  670

607.50

608.00

0.50

500 -  10500

661.50

662.00

0.50

<500 -  830

702.50

704.50

2.00

<500 -  4800

709.00

709.50

0.50

500 -  16000

713.50

723.50

10.00

<500 -  54500

731.50

734.50

3.00

<500 -  3200

747.00

747.50

0.50

<500 -  520

782.50

783.00

0.50

<500 -  2000

788.50

789.50

1.00

<500 -  530

794.00

794.50

0.50

<500 -  550

800.00

807.50

7.50

<500 -  6700

833.00

835.00

2.00

<500 -  1100

841.50

842.00

0.50

500 -  2000

AR-16-108c3

147

-70

960.50

115.50

394.00

394.50

0.50

<500 -  720

398.50

415.50

17.00

<500 -  >61000

453.50

454.00

0.50

<500 -  650

522.50

533.50

11.00

<500 -  2100

537.00

564.00

27.00

<500 -  >61000

655.00

659.00

4.00

<500 -  1200

667.50

668.50

1.00

<500 -  630

671.00

675.00

4.00

<500 -  8400

679.00

681.50

2.50

<500 -  42000

692.50

697.00

4.50

<500 -  1510

703.50

704.00

0.50

<500 -  790

708.00

708.50

0.50

<500 -  520

725.50

726.00

0.50

<500 -  530

841.00

841.50

0.50

<500 -  800

848.00

854.00

6.00

<500 -  10500

AR-16-108c4

147

-70

927.50

115.50

391.50

394.00

2.50

<500 -  2100

398.00

415.00

17.00

<500 -  >61000

456.00

457.00

1.00

<500 -  520

475.00

475.50

0.50

<500 -  550

508.50

519.00

10.50

<500 -  9800

522.50

557.50

35.00

<500 -  >61000

563.00

569.50

6.50

<500 -  1700

573.00

574.50

1.50

<500 -  880

578.50

579.00

0.50

<500 -  1400

591.00

592.00

1.00

<500 -  960

606.50

613.50

7.00

<500 -  >61000

622.00

627.00

5.00

<500 -  3100

632.00

633.00

1.00

<500 -  1300

657.00

659.00

2.00

<500 -  800

752.00

755.00

3.00

<500 -  3500

757.50

761.00

3.50

<500 -  3000

769.50

770.00

0.50

<500 -  580

788.50

790.00

1.50

<500 -  5300

801.50

802.00

0.50

<500 -  510

829.50

830.00

0.50

<500 -  750

AR-16-109c1

327

-70

861.50

119.70

393.00

393.50

0.50

<500 -  6100

524.50

525.50

1.00

<500 -  1800

528.00

530.50

2.50

<500 -  710

539.50

541.50

2.00

<500 -  18000

576.50

578.50

2.00

<500 -  2600

581.00

581.50

0.50

<500 -  700

584.00

587.00

3.00

<500 -  1400

591.50

594.00

2.50

<500 -  1800

597.50

598.50

1.00

<500 -  1100

602.00

602.50

0.50

<500 -  1900

643.50

657.50

14.00

<500 -  38000

677.00

677.50

0.50

<500 -  1000

687.50

688.00

0.50

<500 -  510

697.00

698.00

1.00

600 -  1600

706.50

709.50

3.00

<500 -  800

717.00

718.00

1.00

<500 -  2600

731.50

732.00

0.50

<500 -  510

737.00

741.50

4.50

<500 -  5500

748.00

753.50

5.50

<500 -  3800

757.50

761.00

3.50

<500 -  980

AR-16-109c2

327

-70

816.50

119.70

494.50

495.00

0.50

<500 -  3000

504.50

505.50

1.00

<500 -  11600

512.00

512.50

0.50

<500 -  2400

518.50

519.00

0.50

<500 -  5650

522.00

523.00

1.00

<500 -  2200

532.00

534.00

2.00

<500 -  22000

537.00

541.50

4.50

<500 -  26000

546.50

548.50

2.00

<500 -  1100

552.00

553.00

1.00

<500 -  3600

572.00

574.50

2.50

<500 -  3300

580.50

581.50

1.00

<500 -  1300

589.50

590.00

0.50

<500 -  2500

594.50

596.50

2.00

<500 -  5600

607.50

608.00

0.50

<500 -  830

615.50

616.50

1.00

<500 -  520

640.50

641.50

1.00

<500 -  4100

645.00

655.00

10.00

<500 -  16000

673.00

673.50

0.50

<500 -  1800

683.50

685.50

2.00

<500 -  6800

688.50

689.00

0.50

<500 -  800

AR-16-109c3

327

-70

873.50

119.70

475.00

475.50

0.50

<500 -  640

491.00

493.00

2.00

<500 -  5800

500.50

501.00

0.50

<500 -  900

509.00

510.50

1.50

<500 -  11000

513.50

514.50

1.00

<500 -  16000

522.50

523.00

0.50

<500 -  1600

531.00

531.50

0.50

<500 -  11000

539.00

539.50

0.50

<500 -  1100

552.00

553.00

1.00

<500 -  2000

559.00

559.50

0.50

700 -  6900

577.00

578.50

1.50

<500 -  2500

617.00

620.50

3.50

<500 -  2250

626.00

640.00

14.00

<500 -  >61000

651.00

653.50

2.50

<500 -  2600

665.50

670.50

5.00

<500 -  2400

673.50

677.00

3.50

<500 -  1900

688.00

695.50

7.50

<500 -  1800

AR-16-110c1

327

-70

863.50

132.10

452.50

460.00

7.50

<500 -  30000

465.00

465.50

0.50

<500 -  980

479.50

481.50

2.00

<500 -  35000

490.00

493.00

3.00

<500 -  32000

509.50

510.00

0.50

<500 -  17000

519.50

522.50

3.00

<500 -  20000

525.50

532.50

7.00

<500 - >61000

536.50

541.00

4.50

<500 -  1300

543.50

544.50

1.00

<500 -  900

551.00

555.00

4.00

<500 -  1000

559.00

564.00

5.00

<500 -  2500

627.50

633.00

5.50

<500 -  >61000

645.00

648.00

3.00

<500 -  3000

652.50

653.50

1.00

<500 -  8900

666.50

667.00

0.50

<500 -  1000

679.00

688.00

9.00

<500 -  2400

692.50

693.00

0.50

<500 -  850

AR-16-110c2

327

-70

939.50

132.10

500.00

502.50

2.50

<500 -  44000

534.50

535.00

0.50

2600 -  32000

548.00

554.50

6.50

<500 -  38000

564.50

569.00

4.50

<500 -  1300

572.00

572.50

0.50

<500 -  560

644.00

648.00

4.00

<500 -  1850

651.00

652.00

1.00

<500 -  1000

656.50

666.00

9.50

<500 -  30000

675.50

678.00

2.50

<500 -  3550

688.00

689.00

1.00

<500 -  950

697.50

698.50

1.00

<500 -  2100

704.00

707.00

3.00

<500 -  11500

710.50

711.00

0.50

<500 -  3000

719.00

723.00

4.00

<500 -  7300

726.50

733.50

7.00

<500 -  21500

741.50

742.00

0.50

<500 -  1500

766.50

768.00

1.50

<500 -  920

798.00

798.50

0.50

<500 -  1750

855.00

859.50

4.50

<500 -  8300

AR-16-111c1

327

-69

819.50

122.00

436.00

437.50

1.50

<500 -  570

441.00

442.00

1.00

<500 -  800

450.50

454.50

4.00

<500 -  1500

496.00

496.50

0.50

<500 -  900

501.00

538.50

37.50

<500 -  >61000

544.50

545.50

1.00

<500 -  1350

548.00

548.50

0.50

<500 -  800

568.00

571.50

3.50

<500 -  1100

750.00

757.00

7.00

<500 -  4000

760.00

765.00

5.00

<500 -  870

789.50

794.00

4.50

<500 -  850

802.00

805.00

3.00

<500 -  1150

AR-16-111c2

327

-69

857.50

122.00

417.50

420.00

2.50

<500 -  1250

428.00

434.50

6.50

<500 -  2400

454.50

455.50

1.00

<500 -  860

466.00

466.50

0.50

<500 -  680

524.50

527.00

2.50

<500 -  1350

529.50

531.00

1.50

<500 -  700

536.00

565.00

29.00

<500 -  >61000

569.00

569.50

0.50

<500 -  540

574.50

575.50

1.00

<500 -  4000

580.50

584.50

4.00

<500 -  1700

690.50

708.50

18.00

<500 -  11500

AR-16-112c1

327

-70

771.50

121.60

404.00

405.00

1.00

<500 -  600

459.50

460.00

0.50

<500 -  530

467.00

470.00

3.00

<500 -  830

478.50

483.50

5.00

<500 -  5650

487.00

488.00

1.00

<500 -  1300

551.00

551.50

0.50

<500 -  550

555.00

558.00

3.00

<500 -  690

568.00

573.50

5.50

<500 -  2000

577.00

583.00

6.00

<500 -  >61000

599.00

600.00

1.00

<500 -  1250

620.00

620.50

0.50

<500 -  720

627.50

630.50

3.00

<500 -  2500

638.00

642.00

4.00

<500 -  990

AR-16-112c2

327

-70

876.50

121.60

475.50

476.00

0.50

<500 -  3100

491.50

492.50

1.00

<500 -  2600

506.50

512.00

5.50

<500 -  8200

567.00

567.50

0.50

<500 -  580

572.00

607.50

35.50

<500 -  >61000

611.00

612.00

1.00

<500 -  1600

AR-16-113c1

327

-70

879.50

138.40

520.50

521.50

1.00

<500 -  2800

562.50

563.50

1.00

<500 -  6800

569.00

569.50

0.50

<500 -  1700

576.50

579.50

3.00

<500 -  1000

583.50

584.50

1.00

<500 -  1600

589.50

593.50

4.00

<500 -  1200

598.00

598.50

0.50

<500 -  540

602.00

604.00

2.00

<500 -  41000

609.00

624.00

15.00

<500 -  >61000

700.00

702.00

2.00

<500 -  930

707.00

708.50

1.50

<500 -  13000

711.00

712.50

1.50

<500 -  950

719.50

720.50

1.00

<500 -  1150

734.50

735.50

1.00

<500 -  580

740.00

740.50

0.50

<500 -  1100

749.00

753.50

4.50

<500 -  3700

760.00

760.50

0.50

<500 -  850

764.00

771.00

7.00

<500 -  44000

810.50

813.00

2.50

<500 -  4200

815.50

820.00

4.50

<500 -  6500

AR-16-113c2

327

-70

960.50

138.40

543.00

544.00

1.00

<500 -  2500

589.00

589.50

0.50

1500 -  45000

600.50

601.00

0.50

<500 -  1050

608.50

614.00

5.50

<500 -  10500

618.00

619.00

1.00

<500 -  32000

624.50

629.50

5.00

<500 -  8000

635.00

636.00

1.00

<500 -  14000

644.50

645.50

1.00

<500 -  4500

648.50

658.00

9.50

<500 -  3600

664.50

666.00

1.50

<500 -  2200

674.00

678.00

4.00

<500 -  1300

697.00

700.50

3.50

<500 -  1500

706.00

707.00

1.00

<500 -  1900

712.50

716.50

4.00

<500 -  920

729.00

729.50

0.50

<500 -  650

733.00

737.00

4.00

<500 -  5200

753.00

755.00

2.00

<500 -  8000

760.00

760.50

0.50

<500 -  510

802.50

807.00

4.50

<500 -  5200

844.50

845.00

0.50

<500 -  5300

885.00

886.50

1.50

<500 -  8400

895.00

895.50

0.50

<500 -  750

 

Parameters:

  • Maximum internal dilution 2.00 m downhole
  • All depths and intervals are meters downhole, true thicknesses are yet to be determined
  • "Anomalous" means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • "Off-scale" means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • Where "Min cps" is <500 cps, this refers to local low radiometric zones within the overall radioactive interval

 

Table 3: Harpoon Discovery Drill Hole Data

Drill Hole

Athabasca
Group -
Basement
Unconformity
Depth (m)

Handheld Scintillometer Results (RS-120)

Hole ID

Azimuth

Dip

Total
Depth
(m)

From (m)

To (m)

Width (m)

CPS Range

HP-16-09

305

-70

387.00

141.00

No Significant Intersections

HP-16-10

305

-70

351.00

136.00

240.00

244.00

4.00

<500 -  6800

HP-16-11

305

-70

330.00

135.00

249.00

256.00

7.00

<500 -  5300

HP-16-12

305

-70

398.00

129.00

218.50

223.00

4.50

<500 -  800

228.00

230.00

2.00

<500 -  830

232.50

235.00

2.50

<500 -  2650

239.00

240.00

1.00

<500 -  960

243.50

244.50

1.00

<500 -  650

HP-16-13

0

-90

369.00

N/A

212.50

229.00

16.50

<500 -  >61000

HP-16-14

0

-90

276.00

129.20

206.00

216.50

10.50

<500 -  6600

HP-16-15

0

-90

288.00

N/A

195.50

196.00

0.50

<500 -  800

HP-16-16

0

-90

297.00

133.60

195.00

198.00

3.00

<500 -  50000

HP-16-17

0

-90

364.00

133.50

208.00

213.50

5.50

<500 -  9000

HP-16-18

0

-90

342.00

133.80

189.50

203.50

14.00

<500 -  18000

HP-16-19

0

-90

294.00

134.50

182.00

187.50

5.50

<500 -  41000

193.00

194.00

1.00

<500 -  6100

HP-16-20

0

-90

330.00

N/A

183.50

193.50

10.00

<500 -  >61000

206.00

208.50

2.50

<500 -  600

HP-16-21

0

-90

275.00

137.10

172.00

176.50

4.50

<500 -  18000

HP-16-22

0

-90

324.00

N/A

191.50

208.50

17.00

<500 -  >61000

HP-16-23

0

-90

288.00

N/A

No Significant Intersections

HP-16-24

0

-90

303.00

N/A

215.50

219.00

3.50

<500 -  17000

 

Parameters:

  • Maximum internal dilution 2.00 m downhole
  • All depths and intervals are meters downhole, true thicknesses are yet to be determined
  • "Anomalous" means >500 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • "Off-scale" means >10,000 cps (counts per second) total count gamma readings by gamma scintillometer type RS-120
  • Where "Min cps" is <500 cps, this refers to local low radiometric zones within the overall radioactive interval

Due to the large number of drill holes reported in this news release we have moved the drill hole summaries to the NexGen Energy Ltd. website, which can be viewed here: http://nexgenenergy.ca/news/

Technical Information

Natural gamma radiation in drill core reported in this news release was measured in counts per second (cps) using a Radiation Solutions Inc. RS-120 gamma-ray scintillometer. The reader is cautioned that total count gamma readings may not be directly or uniformly related to uranium grades of the rock sample measured; they should be used only as a preliminary indication of the presence of radioactive minerals. All intersections are downhole. True thicknesses are yet to be determined.

Split core samples will be taken systematically, and intervals will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis. All samples sent to SRC will be analyzed using ICP-MS for trace elements on partial and total digestions, ICP-OES for major and minor elements on a total digestion, and fusion solution of boron by ICP-OES. Mineralized samples are analyzed for U3O8 by ICP-OES and select samples for gold by fire assay. Assay results will be released when received and after stringent internal QA/QC protocols are passed.

All scientific and technical information in this news release has been prepared by or reviewed and approved by Mr. Garrett Ainsworth, P.Geo., Vice President – Exploration & Development for NexGen. Mr. Ainsworth is a qualified person for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), and has verified the sampling, analytical, and test data underlying the information or opinions contained herein by reviewing original data certificates and monitoring all of the data collection protocols.

For details of the Rook I Project including the quality assurance program and quality control measures applied and key assumptions, parameters and methods used to estimate the mineral resource set forth above please refer to the technical report entitled "Technical Report on the Rook 1 Property, Saskatchewan, Canada" dated effective April 13, 2016 (the "Rook 1 Technical Report") prepared by Mark B. Mathisen and David Ross, each of whom is a "qualified person" under NI 43-101. The Rook I Technical Report is available for review under the Company's profile on SEDAR at www.sedar.com.

About NexGen

NexGen is a British Columbia corporation with a focus on the acquisition, exploration and development of Canadian uranium projects. NexGen has a highly experienced team of uranium industry professionals with a successful track record in the discovery of uranium deposits and in developing projects through discovery to production.

NexGen owns a portfolio of highly prospective uranium exploration assets in the Athabasca Basin, Saskatchewan, Canada, including a 100% interest in Rook I, location of the Arrow Discovery in February 2014, Bow Discovery in March 2015 and Harpoon Discovery in August 2016. The Arrow Deposit's maiden Inferred mineral resource estimate is 201.9 M lbs U3O8 contained in 3.48 M tonnes grading 2.63% U3O8.

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation.  "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, the proposed use of proceeds and planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the price of uranium, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, pending assay results may not be consistent with preliminary results, discretion in the use of proceeds, alternative sources of energy, aboriginal title and consultation issues, reliance on key management and other personnel, potential downturns in economic conditions, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

SOURCE NexGen Energy Ltd.



Contact
Leigh Curyer, Chief Executive Officer, NexGen Energy Ltd., +1 604 428 4112, lcuryer@nexgenenergy.ca, www.nexgenenergy.ca; Travis McPherson, Corporate Development Manager, NexGen Energy Ltd., +1 604 428 4112, tmcpherson@nexgenenergy.ca, http://www.nexgenenergy.ca
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
NexGen Energy Ltd.
Bergbau
A1WZPW
CA65340P1062
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.