• Donnerstag, 28 November 2024
  • 03:32 Uhr Frankfurt
  • 02:32 Uhr London
  • 21:32 Uhr New York
  • 21:32 Uhr Toronto
  • 18:32 Uhr Vancouver
  • 13:32 Uhr Sydney

Erin Ventures Announces an Updated Mineral Resource Estimate for Its Piskanja Boron Project

29.11.2016  |  FSCwire

Victoria, British Columbia (FSCwire) - Erin Ventures Inc. [TSXV: EV] is pleased to announce an updated mineral resource estimate (MRE) for its 100% owned Piskanja boron deposit, located in Serbia. The updated mineral resource statement was authored by SRK Consulting (UK) Ltd. independent of Erin, is based on 32,880 metres of drilling (a total of 98 drill-holes), and has been prepared in accordance with Canadian Securities Administrators’ National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI"43-101”).

Highlights

  • The most recent infill drill program was successful in increasing the contained boron (i.e. 100% B2O3) in the Indicated Mineral Resource category by 41.2% or 700,000 tons (from 1.7M tons to 2.4M tons)
  • The Indicated Mineral Resource tonnage increased by 39.3% or 2.2M tons (from 5.6M tons to 7.8M tons) in the updated MRE vs the Maiden MRE
  • There is a global 2% increase in grade in B2O3 in the updated MRE when compared to the previous resource estimate
  • There is no material decrease in global tonnage nor contained B2O3 content in spite of SRK’s decision to increase the minimum mining thickness from 1.0 metre to 1.2 metre in the updated MRE

SRK Mineral Resource Statement as at 19 July 2016 for the Piskanja

Deposit prepared in accordance with CIM Standards

Mineral Resource Category1

Cut-off

Tonnage, Mt

B2O3

Grade, %

Contained

B2O3, Mt3

Indicated

12% B2O3

7.8

31.0

2.4

Inferred2

12% B2O3

3.4

28.6

1.0

 

Note: SRK has applied basic economic considerations to restrict the Mineral Resource to material that it considers has reasonable prospects for economic extraction by underground mining methods. This is primarily based on the results of SRK €Ÿs previous 2014 Preliminary Economic Assessment though SRK has reviewed this in the light of the updated geological model produced for this estimate.

1Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources in this news release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.

2The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.

3Contained metal figures and totals may differ due to rounding of figures.

Comparison to Previous Estimates:

In comparison to the previous SRK 2013 MRE for the Project, which was also reported at a cut-off grade of 12% B2O3 but above a minimum mining thickness of 1.0 m, this updated MRE (which is reported above a minimum mining thickness of 1.2 m) has more borate in the Indicated category (2.4Mt compared to 1.7 Mt) and less borate in the Inferred category (1.0Mt compared to 1.8 Mt). These changes are primarily due to some previously reported Inferred material being upgraded in to the Indicated category though there is also a slight reduction in B2O3 content for the Project as a whole from 3.5 Mt to 3.4 Mt (-4%) mainly as a result of a 6% reduction in tonnage. This change is primarily due to the infill drilling which has shown some of the thicker zones to be less continuous than previously assumed but also enabled the higher grade zones to be better delineated, which has reduced the tonnage slightly but at the same time slightly improved the grade (namely a global 2% increase in grade compared to the previous estimate).

Conclusions

The infill drilling and database verification work completed since the last MRE was produced has added further confidence to the geological model, enabled the borate distribution to be interpolated with more confidence grade distributions and allowed the reporting of an updated MRE which is similar in quantum, but is now more robust, than that previously produced.

There are, however, still areas of lower geological confidence which require more drilling and which may be subject to further revision in the future and there is also some associated work which could be done alongside or prior to more drilling to improve confidence in the estimate generally.

In comparison to the MRE reported in November 2013, the database for the updated MRE (dated October 2016) includes an additional 12 drill-holes (for 3,458 m of diamond drilling) of infill drilling on a 50 metre by 50 metre grid. As this drill program was designed to increase the confidence level of the contained B2O3 over a known section of the deposit only and not designed to aid the expansion of the known footprint of the deposit, it was not surprising that the resulting updated MRE reflects no material change to the overall contained quantity of B2O3 (in all categories) in the deposit. However, as the deposit remains unbounded to the west and south, there remains the potential to increase the current mineral resources by targeting exploration programmes designed to delineate extensions to the existing mineralisation model at the peripheries of the deposit.

To view the graphic in its original size, please click here

To view the graphic in its original size, please click here

The Mineral Resource Estimate Update describing the details of the resource estimate will be immediately available under Erin's profile on SEDAR at www.sedar.com, and on the Company's website www.erinventures.com.

The updated Mineral Resource Statement reported herein was prepared in conformity with the Canadian Institute of Mining (CIM) "Estimation of Mineral Resource and Mineral Reserves Best Practices Guidelines". The technical report, will be filed on SEDAR, and will contain more information with respect to the key assumptions, parameters, methods and risks of determination associated with the Mineral Resource Estimate.

On behalf of the Board of Directors,

Blake Fallis, General Manager

Qualified Persons

The technical information in this release was prepared and approved by James E Wallis, M.Sc. (Eng), P. Eng., a director of Erin, who is a Qualified Person under National Instrument 43-101.

The responsible person for the updated MRE report is Dr Mike Armitage C.Eng C.Geol, who is a full time employee of SRK Consulting, a Qualified Person in accordance with the CIM Definition Standards on Mineral Resources and Reserves (CIM Standards), and independent of Erin Ventures.

About Erin Ventures Inc.

Erin Ventures Inc. is an international mineral exploration and development company with boron assets in Serbia and gold assets in North America. Headquartered in Victoria, B.C., Canada, Erin's shares are traded on the TSX Venture Exchange under the symbol "EV". For detailed information please see Erin's website at www.erinventures.com or the Company's filed documents at www.sedar.com.

For further information, please contact:             Erin’s Public Quotations                                  

Erin Ventures Inc.                                                     Canada                           USA                

Blake Fallis, General Manager                                 TSX Venture: EV             SEC12G3-2(B)#82-4432

Phone: 1-250- 384-1999 or 1-888-289-3746            OTCBB:ERVFF

www.erinventures.com                                             Europe                                       

                                                                                   Berlin: EKV       

                                                                                   

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements: This release contains forward looking statements.  The words "believe," "expect," “feel,” "plan," "anticipate," “project,” “could,” “should” and other similar expressions generally identify forward-looking statements.  Readers are cautioned not to place undue reliance on these forward-looking statements.  These forward-looking statements are subject to a number of risks and uncertainties including, without limitation, variations in estimated costs, the failure to discover or recover economic grades of minerals, and the inability to raise the funds necessary, changes in external market factors including commodity prices, and other risks and uncertainties.  Actual results could differ materially from the results referred to in the forward-looking statements. This list is not exhaustive of the factors that may affect any of the Company's forward-looking information. These and other factors made in public disclosures and filings by the Company should be considered carefully and readers should not place undue reliance on the Company's forward-looking information. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

Mineral resources are not mineral reserves and do not have demonstrated economic viability. "Inferred Resources" have a great amount of uncertainty as to their existence, and economic and legal feasibility. Investors are cautioned not to assume that all or any part of an inferred mineral resource reported in this news release will ever be upgraded to a higher category or to reserves. U.S. persons are advised that while mineral resources are recognized under Canadian regulations, the U.S. Securities and Exchange Commission does not recognize them. U.S. persons are also cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable.



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/ErinNov292016.pdf

Source: Erin Ventures Inc. (TSX Venture:EV)

To follow Erin Ventures Inc. on your favorite social media platform or financial websites, please click on the icons below.


Maximum News Dissemination by FSCwire. http://www.fscwire.com

Copyright © 2016 Filing Services Canada Inc.






Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Boron One Holdings Inc.
Bergbau
A3D7GE
CA10002E1060
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.