• Montag, 23 Dezember 2024
  • 01:28 Uhr Frankfurt
  • 00:28 Uhr London
  • 19:28 Uhr New York
  • 19:28 Uhr Toronto
  • 16:28 Uhr Vancouver
  • 11:28 Uhr Sydney

Cartier Intersects Three Visible Gold-bearing Zones on Chimo Mine Property

01.12.2016  |  Marketwire

VAL-D'OR, QUEBEC--(Marketwired - Dec 1, 2016) - Cartier Resources Inc. (TSX VENTURE:ECR) ("Cartier") announces that it has completed a drill programme on the East Block of the Chimo Mine property. Visible gold grains were observed in three (3) structures over drill core lengths ranging from 0.2 to 1.7 meters.

The programme, consisting of six drill holes for a total of 2,517 m, aimed at testing the eastern extension of the 5M zone, the main gold-bearing structure of the Chimo Mine. The Chimo Mine, situated 45 km east of Val-d'Or produced 379,012 ounces of gold (Source: MRNF, DV 85-05 to 97-01) of which two thirds were extracted from the 5M zone.

The drill holes intersected the 5M zone characterized by graphite-chlorite-biotite zones and numerous smoky quartz veins and veinlets with disseminated arsenopyrite. The 5M zone is now traced up to 700 m east of the Chimo shaft and remains open at depth.

In addition, to the 5M zone, several structures with gold-bearing potential (presence of smoky quartz-biotite-tourmaline veins, disseminated and semi-massive arsenopyrite-pyrrhotite) were intersected and represent extensions of other known gold-bearing zones on the project.

Core mapping and sampling has been completed. Samples for the first two holes have been sent to the laboratory and assays are pending. Samples from the four remaining holes will be sent to the laboratory over the next few days.

« Our first diamond drill programme on the Chimo Mine project was successful in demonstrating the continuity of the main gold-bearing 5M zone up to 700 meters east of the shaft » commented Philippe Cloutier, President and CEO, adding « as well as intersecting the 5M zone, several structures with gold-bearing potential were intersected of which three show visible gold ».

Quality Assurance / Quality Control

The scientific and/or technical information presented in this press release has been reviewed and approved by Mr. Gaétan Lavallière, P. Geo., Ph. D., and Vice President for Cartier. Mr. Lavallière is a qualified person as defined by National Instrument 43-101.

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.



Contact

Cartier Resources Inc.
Philippe Cloutier, P.Geo.
President and CEO
819 856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com
Investor Relations:
Relations Publiques Paradox
514 341-0408


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Cartier Resources Inc.
Bergbau
A0M056
CA1467721082
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.