• Samstag, 23 November 2024
  • 03:07 Uhr Frankfurt
  • 02:07 Uhr London
  • 21:07 Uhr New York
  • 21:07 Uhr Toronto
  • 18:07 Uhr Vancouver
  • 13:07 Uhr Sydney

Drilling Intersects 4.0 M of 4.79 g/t Au and 2.0 M of 6.29 g/t Au at Carolin - Company Begins Target Definition Underground

15.12.2016  |  The Newswire
November 15, 2016 - New Carolin Gold Corporation (the "Company" or "New Carolin") (TSXV: LAD) (OTCBB LADFF) is pleased to announce the remaining results from the Phase I surface drill program completed at the Company's Ladner Creek project in the fall of 2016.


Highlights of this work program include:

-Hole CM-005 intersected 3.0m of 3.08 g/t Au

-Hole CM-007 intersected16.0m of 1.12 g/t Au including 2.0m of 4.57 g/t Au and including 1.0m of 6.73 g/t Au.

-Hole CM-008 intersected 23.0m of 1.18 g/t Au including 2.0m of 6.29 g/t Au

-Hole CM-009 intersected 35.0m of 1.07 g/t Au including 7.0m of 3.19 g/t Au and including 1.0m of 5.90 g/t Au

-Hole CM-010 intersected 7.5m of 2.43 g/t Au including 1.5m of 5.51 g/t Au

-Hole CM-012 intersected 4.0m of 4.79 g.t Au including 2.0m of 5.91 g/t Au.

These holes were designed to test for gold mineralization both above and to the east of the Carolin Mine Zone. Due to the proximity of the Underground workings holes were targeted approximately 30m away from the mine workings to avoid intersected open areas of the underground.

Hole CM-012 intersected 5 distinct mineralized zones east of the current mine workings. One intercept - 4.0m of 4.79 g/t Au is located approximately 40m east of the mine workings at the 935 level and provides key geological controls to join CM-012 with historical hole OG-15 (an additional 35m east of the mine workings) which intersected 6.3m of 5.41 g/t Au. CM-012 also ended in gold mineralization.

Hole CM-007 intersected 2.0m of 4.57 g/t Au including 1.0m of 6.73 g/t Au approximately 40m above the Carolin Mine Workings and up-dip of historical hole OG-34 which intersected 17.2m of 5.14 g/t Au and 10.5m of 5.48 g/t Au in two distinct zones- both located outside of the current Carolin Resource Estimate. Hole CM-007 ended in mineralization and was terminated due to it's proximity to the underground workings. CM-007 also intersected 4 additional mineralized zones in the top 300 meters of the hole. These intercepts are above the Carolin Mine Workings and are considered new targets for future exploration. A complete list of results is provided in Table 1.


Table 1. Composite assay results

Hole Number 		Width (m)* 	From 	To 	Au (g/t) 
CM-005 8.00 40.00 48.00 1.64
CM-005 including 3.00 43.00 46.00 3.08
CM-005 and including 1.00 45.00 46.00 3.95
CM-006 1.00 62.00 63.00 2.59
CM-007 9.00 186.00 195.00 1.46
CM-007 including 2.00 189.00 191.00 2.13
CM-007 and 16.00 308.00 324.00 1.12
CM-007 including 4.00 320.00 324.00 3.08
CM-007 and including 2.00 320.00 322.00 4.57
CM-007 and including 1.00 320.00 321.00 6.73
CM-008 7.00 80.00 87.00 1.10
CM-008 including 1.00 86.00 87.00 4.19
CM-008 and 23.00 117.00 140.00 1.18
CM-008 including 9.00 117.00 126.00 2.55
CM-008 and including 2.00 124.00 126.00 6.29
CM-009 35.00 85.00 120.00 1.07
CM-009 including 10.00 89.00 99.00 2.62
CM-009 and including 7.00 91.00 98.00 3.19
CM-009 and including 1.00 91.00 92.00 5.90
CM-010 7.50 13.50 21.00 2.43
CM-010 including 5.50 13.50 19.00 3.01
CM-010 and including 1.50 13.50 15.00 5.51
CM-011 anomalous gold values
CM-012 3.50 27.50 31.00 2.72
CM-012 and 5.00 38.00 43.00 1.10
CM-012 including 1.00 39.00 40.00 2.17
CM-012 and 10.00 106.00 116.00 2.05
CM-012 including 4.00 112.00 116.00 4.79
CM-012 and including 2.00 114.00 116.00 5.91
CM-012 and 6.25 194.00 200.25 1.06
CM-012 including 2.00 196.00 198.00 2.73

* width represents core length. True width has not been established. All composite intervals are calculated using a 0.10 g/t Au cut-off grade with <= 1.0m of internal waste dilution.


The surface drill program was successful in showing continuity of the gold zones away from the historical underground workings and has provided the Company with important geological controls. With surface drill results in hand the next phase of work from underground can be more clearly defined and enable the Company to better test higher grade zones of mineralization which are not easily accessed from surface.

All technical information for the Carolin Mine Project is obtained and reported under a formal quality assurance and quality control (QA/QC) program. A quality control gold standard of known value was randomly inserted every 25 samples along with a blank (zero grade material) and a duplicate sample. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. Samples were transported to a secure storage facility in Hope B.C. and shipped to Activation Labs in Kamloops, B.C. an accredited mineral analysis laboratory for preparation and analysis utilizing both fire assay and metallic screen methods.

Mr. R. Bob Singh, P.Geo, Exploration Manager, is the qualified person responsible for the technical content of this news release.


About New Carolin Gold Corp.

New Carolin Gold Corp. is a Canadian-based brownfields development company focused on the exploration, evaluation and development of our 100% owned property, consisting of 144 square kilometers of contiguous mineral claims and crown grants collectively known as the Ladner Gold Project. The Company is currently executing exploration programs on the property which is located 2 hours by freeway from Vancouver near Hope, British Columbia, in the prospective and under-explored Coquihalla Gold Belt. The Company has an existing mine permit, water licenses and tailings facility in place, as well as 10.5 kilometers of underground tunnels for exploration access. The Ladner Gold Project is host to several historic gold producers, including the Carolin Mine, Emancipation Mine, Arum Mine, Ward Mine, and Pipestem Mine, in addition to numerous artisan workings and gold prospects that typically exploit high grade visible gold mineralization.

For additional information, please visit the Company's website at www.newcarolingold.com.


ON BEHALF OF THE BOARD OF DIRECTORS

"Robert L. Thast"
President & Chief Executive Officer



Phone: 604.542.9458
Cell: 604.220.5031
E-mail: ceo@newcarolingold.com
Web site: www.newcarolingold.com


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or the accuracy of this press release.


Caution concerning forward-looking information

This news release may contain forward-looking statements that are based on the Company's expectations, estimates and projections regarding its business and the economic environment in which it operates. These statements are not guarantees of future performance and involve risks and uncertainties that are difficult to control or predict. Therefore, actual outcomes and results may differ materially from those expressed in these forward-looking statements and readers should not place undue reliance on such statements. Statements speak only as of the date on which they are made, and the Company undertakes no obligation to update them publicly to reflect new information or the occurrence of future events or circumstances, unless otherwise required to do so by law.

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
New Carolin Gold Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.