• Donnerstag, 18 Juli 2024
  • 17:31 Uhr Frankfurt
  • 16:31 Uhr London
  • 11:31 Uhr New York
  • 11:31 Uhr Toronto
  • 08:31 Uhr Vancouver
  • 01:31 Uhr Sydney

Marathon Announces Aggressive 60,000-meter Drilling Program for Accelerated Resource Growth, Valentine Lake Gold Camp

31.05.2017  |  Marketwire

TORONTO, ON--(Marketwired - May 31, 2017) - Marathon Gold Corp. ("Marathon" or the "Company") (TSX: MOZ) is excited to announce the Company's plans for exploration and development activities at the Valentine Lake Gold Camp following the recent closing of the bought deal financing which generated gross proceeds of $18.6 million. The net proceeds of the offering will allow Marathon to continue infill, extension and exploration drilling at the Valentine Lake Gold Camp, advance the metallurgical programs, and increase the ongoing environmental work at the property in preparation for future mine permitting, among other activities as set out in additional detail within the final short form prospectus of the Company dated May 16, 2017. Marathon has increased staff and expanded facilities at the Valentine camp as we commence our expanded exploration program.

Highlights of New Program:

  • 60,000-meter drill program focused primarily on the Marathon Deposit
  • Three drills on site, with a fourth to be added in the third quarter of 2017
  • Prospecting a 7-kilometer area to the northeast of the Victory Deposit, where historical gold showings warrant additional work
  • Advanced environmental studies for future mine permitting
  • Additional metallurgical work to optimize recoveries for conventional milling and heap leaching
  • Updated property wide resource update expected in Q3 2017 followed by a PEA in Q4 2017

"We now have the financial capacity needed to move the Valentine Lake Gold Camp to the next level including an expanded drill campaign, continued exploration of deeper mineralization and prospecting work throughout the entire property," commented Phillip Walford, President and CEO of Marathon. "We plan to complete a 60,000 meter drill campaign at the Valentine Lake Gold Camp which will allow us to expand the Marathon Deposit along strike to the southwest and to depth. This is going to be a very busy year for us as we look to significantly expand the property wide resource."

The company is also happy to announce the following new drill results from the Marathon Deposit at the Valentine Lake Gold Camp:

  • Drill hole MA-17-176 intersected 118 meters grading 1.56 g/t Au including higher grade intervals of 22 meters grading 3.58 g/t Au and some narrower high grade intercepts as well. Deeper in the hole a 15 meter intersection grading 2.73 g/t Au contained 4 meters of 7.28 g/t Au.
  • Drill hole MA-17-177 intersected the mineralized corridor as planned at 190 meters and intersected numerous small zones with good grades including 7 meters grading 4.82 g/t Au and 2 meters grading 11.11 g/t Au.
  • Drill hole MA-17-178 intersected the mineralized corridor at 200 meters and encountered 89 meters grading 1.84 g/t. This intersection has several intervals of good grade including 4 meters of 14.1 g/t and 9 meters of 5.07 g/t Au. This hole is still in progress with the last reportable intersection from 531-534 meters grading 10.03 g/t Au.

TABLE 1: Significant fire assay intervals from drill holes MA-17-176 to MA-17-178, Marathon Gold Deposit, Valentine Lake Gold Camp.

 
DDH   Section   From   To   Core Length (m)   True Thickness (m)   Gold g/t
MA-17-176   17330   129   132   3   2.9   1.42
        141   259   118   112.1   1.56
including       141   142   1   1   15.19
including       148   150   2   1.9   4.58
including       204   226   22   20.9   3.58
including       229   231   2   1.9   3.41
        397   412   15   14.3   2.73
including       397   401   4   3.8   7.28
including       422   425   3   2.9   4.5
        447   451   3   2.9   1.33
MA-17-177   17140   191   194   3   2.9   1.92
        201   204   3   2.9   2.38
        246   253   7   6.7   4.82
including       247   249   2   1.9   11.11
        271   281   10   9.5   1.64
including       273   275   2   1.9   6.94
        412   415   3   2.9   3.39
        437   450   13   12.4   1.6
including       443   447   4   3.8   3.42
        468   472   4   3.8   3.13
        497   500   3   2.9   2.81
        521   524   3   2.9   3.38
        537   544   7   6.7   2.87
including       543   544   1   1   11.45
        548   551   3   2.9   3.25
MA-17-178   17100   86   90   4   3.8   2.98
        207   210   3   2.9   1.15
        220   223   3   2.9   1.64
        323   326   3   2.9   3.01
        339   428   89   84.6   1.84
including       339   343   4   3.8   14.1
including       359   360   1   1   6.53
including       410   419   9   8.6   5.07
including       426   428   2   1.9   6.41
        461   465   4   3.8   2.02
        507   510   3   2.9   2.44
        531   534   3   2.9   10.03
                         

Acknowledgments

Marathon acknowledges the financial support of the JEA Program, Department of Natural Resources, Government of Newfoundland and Labrador. The Research & Development Corporation of Newfoundland and Labrador has granted approximately 40% of the costs of the current seismic program to Marathon Gold and we appreciate this support.

Quality Assurance-Quality Control ("QA/QC")

Sherry Dunsworth, M.Sc., P. Geo., SVP of Exploration, Marathon's Qualified Person, has reviewed the contents for accuracy and has approved this press release on behalf of Marathon. Thorough QA/QC protocols are followed including the insertion of blanks and standards at regular intervals in each sample batch. Drill core is cut in half with one half retained at site, the other half tagged and sent to Eastern Analytical Limited in Springdale, Newfoundland. All reported core samples are analyzed for Au by fire assay (30g) with AA finish. All samples above 0.10 g/t Au in economically interesting intervals are further assayed using metallic screen to mitigate the presence of coarse gold. Significant mineralized intervals are reported in Table 1 as core lengths and estimated true thickness (80% to 95% of core length).

About Marathon

Marathon is a Toronto based gold exploration company rapidly advancing its 100% owned Valentine Lake Gold Property located in Newfoundland, one of the top mining jurisdictions in the world. The Valentine Lake Gold Property currently hosts four near-surface, mainly pit-shell constrained, deposits with measured and indicated resources totaling 1,388,200 oz. of gold at 1.91 g/t and inferred resources totaling 766,500 oz. of gold at 2.24 g/t. The majority of the resources occur in the Marathon and Leprechaun deposits, which also have resources below the pit shell. Both deposits are open to depth and on strike. Gold mineralization has been traced down over 350 metres vertically at Leprechaun and almost a kilometer at Marathon. The four deposits outlined to date occur over a 20-kilometer system of gold bearing veins, with much of the 24,000-hectare property having had little detailed exploration activity to date. Drilling in 2017 is continuing to focus on expanding the Marathon Deposit at surface and to depth.

The Valentine Lake Gold Property is accessible by year-round roads and is located in close proximity to Newfoundland's electrical grid. Marathon maintains a 50-person all-season camp at the property. Recent metallurgical tests have demonstrated 93% to 98% recoveries via conventional milling and 50% to 70% recoveries via low cost heap leaching at both the Leprechaun and Marathon Deposits.

To find out more information on the Valentine Lake Gold Camp please visit www.marathon-gold.com.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION

Except for statements of historical fact relating to Marathon Gold Corp., certain information contained herein constitutes "forward-looking statements". Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as "expects", "anticipates", "plans", "believes", "considers", "intends", "targets", or negative versions thereof and other similar expressions, or future or conditional verbs such as "may", "will", "should", "would" and "could". We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Marathon Gold Corp.'s public filings, which may be accessed at www.sedar.com. Other than as specifically required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events, results or otherwise.

Image Available: http://www.marketwire.com/library/MwGo/2017/5/30/11G140034/Images/May_31st_Longitudinal-723468c7ed83a0f59891705b53b3508e.jpg
Image Available: http://www.marketwire.com/library/MwGo/2017/5/30/11G140034/Images/May_31st_2017_Drill_Map-e408964f1c23b6f2ac38429d53d1900b.jpg



Contact

For more information, please contact:
Christopher Haldane
Investor Relations Manager
Tel: 1-416-987-0714
E-mail: chaldane@marathon-gold.com

Phillip Walford
President and Chief Executive Officer
Tel: 1-416-987-0711
E-mail: pwalford@marathon-gold.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Marathon Gold Corp.
Bergbau
A0YH1U
CA56580Q1028

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.