• Freitag, 22 November 2024
  • 07:04 Uhr Frankfurt
  • 06:04 Uhr London
  • 01:04 Uhr New York
  • 01:04 Uhr Toronto
  • 22:04 Uhr Vancouver
  • 17:04 Uhr Sydney

Drilling Commences at Eskay’s SIB Property

07.07.2017  |  FSCwire

Toronto, Ontario (FSCwire) - Toronto, July 7, 2017 – Eskay Mining Corp. (“Eskay” or the “Company”) (TSX-V:ESK) is pleased to announce that diamond drilling at its 4,400 hectare SIB property in northwestern British Columbia, Canada, is now underway.  This season’s drill campaign is part of a three year program in which Silver Standard Resources Inc. (“Silver Standard”) has committed to spend $3.7 million in the first year, and in which a total of between 6,000 and 9,000 meters of drilling is expected to be drilled using two drill rigs (for further information on the option to Silver Standard, see the Company’s Press Release dated April 26, 2017).

The SIB property drilling will target highly prospective precious metals-enriched VMS-style mineralization south along trend from Barrick’s Eskay Creek mine, which was the world’s richest volcanogenic massive sulphide (VMS) deposit in terms of precious metals grades--it produced 3.3 million ounces of gold and 159 million ounces of silver from 2.18 million tonnes of ore between 1994 and 2008, as previously reported by Barrick Gold Corp.. 1  The mineralization and resources previously reported for the Eskay Creek Mine are not necessarily indicative of the mineralization, if any, hosted on the Company’s property. The 2017 drill campaign’s relatively deep holes (average approximately 900 meters) will target Eskay-style mineralization beneath the Lulu zone, which in previous and generally shallow drilling returned intercepts ranging up to 14.4 g/t gold and 1,060 g/t silver across 14.3 meters, and 10.8 g/t gold and 766 g/t silver across 24.8 meters  2, 3.  These high-grade intersections were of stratiform, Eskay-style sulphide-sulphosalt bearing mudstone occurring in close association with Eskay Creek rhyolite.  Limited deep drilling by the Company in 2008 and 2010 indicate that similar volcanic and volcano-sedimentary host rocks, including the geochemically distinctive Eskay rhyolite, occur at depth beneath the Lulu zone, in the footwall of the Coulter Creek thrust fault, which truncates the Lulu zone at depth.  Results from the Company’s deep drilling conducted in 2008 included an intersection of 25.2 meters at a grade of 2.13 g/t gold, 4.0 g/t silver, 0.174% zinc and 0.124% lead. 4 at 488 meters depth in the footwall to the thrust.  The footwall stratigraphy, however, remains incompletely tested along what is a nearly 4 kilometer long trend, and this trend is the primary target of the program.

Eskay and Silver Standard plan to systematically drill-test the prospective volcanic package beneath the Coulter Creek fault by drilling widely-spaced, deeper holes from surface. This work will be supported by down-hole geophysics to detect proximal mineralization and by lithogeochemical sampling to map the distinctive alteration patterns common to VMS deposits.

Charles J. Greig, P. Geo., a member of the Company’s Advisory Team, is a Qualified Person under the definition of National Instrument 43-101.  Mr. Greig has reviewed and approved the technical information in this press release.

For further information regarding the SIB Property, see the Company’s Press Releases of October 17, 2016, August 8, 2016, May 9, 2016 and January 23, 2013.

Footnotes:

1.  BC Geological Survey MINFILE Database (http://minfile.gov.bc.ca/Summary.aspx?minfilno=104B++008).

2.  McGuigan, P. J. (2002) Technical Report on the Eskay Properties of Heritage Explorations Ltd. And Glenfred Holdings Inc.

3.  Rebagliati, C. M. et al (1991) Diamond Drill Report on the Sib 1-16, 20-39 and Polo 1-13 Claims.

4.  McKinley, S. D. (2008) 2008 Exploration on the Eskay Property.

About Eskay Mining Corp:

Eskay Mining Corp. (TSX-V:ESK) is a TSX Venture Exchange listed company, headquartered in Toronto, Ontario.  Eskay is an exploration company focused on the exploration and development of precious and base metals in British Columbia in a highly prolific, poly metallic area known as the Eskay Rift Belt located in the “Golden Triangle”, 70km northwest of Stewart, BC.  The Company currently holds mineral tenures in this area comprised of 177 claims (130,000 acres). 

All material information on the Company may be found on its website at www.eskaymining.com and on SEDAR at www.sedar.com.

For further information, please contact:

Mac Balkam                                                                                                                            T: 416 907 4020

President & Chief Executive Officer                                                                       E:  macbalkam@aol.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Press Release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/EskayMiningPRJuly72017.pdf

Source: Eskay Mining Corp. (TSX Venture:ESK)

To follow Eskay Mining Corp. on your favorite social media platform or financial websites, please click on the icons below.


Maximum News Dissemination by FSCwire. http://www.fscwire.com

Copyright © 2017 Filing Services Canada Inc.






Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Eskay Mining Corp.
Bergbau
A0YDPM
CA2964371066
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.