• Montag, 23 Dezember 2024
  • 01:02 Uhr Frankfurt
  • 00:02 Uhr London
  • 19:02 Uhr New York
  • 19:02 Uhr Toronto
  • 16:02 Uhr Vancouver
  • 11:02 Uhr Sydney

Teranga Gold Reports Additional Golden Hill Drill Results, Including 12.28 g/t Gold Over 12 m and 11.29 g/t Gold Over 8 m at The Ma Prospect

13.09.2017  |  GlobeNewswire
Reverse Circulation Drilling at the Ma East Prospect Returns 2.50 g/t Gold Over 20 Metres

Ma Prospect is Developing into a Mineralised System That is More Than Two Kilometres in Length


TORONTO, Sept. 13, 2017 - Teranga Gold Corp. ("Teranga" or the "Company") (TSX:TGZ) (ASX:TGZ) is pleased to announce that early-stage drilling continues to yield high-grade, near-surface and deeper gold mineralization at its Golden Hill property in Burkina Faso, West Africa. Teranga, through its acquisition of Gryphon Minerals Ltd., has an earn-in agreement on the Golden Hill property with Boss Resources Limited (ASX:BOE) pursuant to which Teranga, as the operator, can earn an 80% interest in the joint venture upon delivery of a feasibility study and the payment of AUD2.5 million.

These most recent diamond drill results comprise the remaining phase two and initial phase three drill results at the Ma prospect, one of two new discoveries reported by Teranga in April. All of the Golden Hill prospects drilled by the Company to-date are located approximately 5 kilometres from a central point (see Figure 1 in Appendix 1).

The phase two and initial phase three drill programs continue to return excellent near-surface grades and widths at the Ma prospect, including:
  • 12 m @ 12.28 g/t Au including 4 m @ 34.04 g/t Au (GHDD-063)
  • 8 m @ 11.29 g/t Au including 3 m @ 29.09 g/t Au (GHDD-051)
  • 13 m @ 5.84 g/t Au including 3 m @ 18.82 g/t Au (GHDD-046)
  • 7 m @ 7.38 g/t Au including 1m @ 46.60 g/t Au (GHDD-055)
  • 17 m @ 2.52 g/t Au including 4 m @ 6.34 g/t Au (GHDD-059)
  • 9 m @ 4.81 g/t Au including 4 m @ 8.51 g/t Au (GHDD-061)

“These most recent results from Ma have provided some of the widest and highest grade intervals from our drilling campaigns to-date and added further on-strike extension to the west of previous drilling,” said David Mallo, Teranga’s Vice President, Exploration. “The positive drill results at Ma serve to confirm the along trend and initial down-dip continuity of grade and width from surface exposure to depths now approaching 60 to 70 metres at this quickly advancing prospect. Recent step-out drilling results located to the west of our previous drill success demonstrate a general strengthening of the mineralisation which remains open and will be followed-up further west and to depth in the near term.”

Continued Mr. Mallo, “In addition, our reverse circulation drilling program from the eastern part of our Ma prospect to the Ma East prospect, a distance of over 900 metres, is providing favorable results and adding substantially to our geological understanding of this sparsely explored area. We are still at an early stage of exploration and with these results recognize considerable upside for continued exploration success both along trend and to depth where the mineralized structures remain open to further expansion. We will continue to test the Ma structure along what is developing into a more than 2 kilometre long mineralised system.”

The Golden Hill property is comprised of three adjacent exploration permits covering 468 km2 located in southwest Burkina Faso in the central part of the Houndé Greenstone Belt. This belt hosts a number of high-grade gold discoveries, including the Siou, Yaramoko and Houndé deposits, the latter property being contiguous with Golden Hill. To the south of Golden Hill is another large land position where active exploration programs are well underway.


Ma Prospect: Phase Two and Three Diamond Drilling

At the Ma prospect, 30 diamond drill holes, GHDD-28 to 58, were completed during the phase one and two drill evaluations, testing the primary northwest trending Ma structure, a secondary parallel, northwest trending structure and north-south trending cross-structures. Gold mineralization at the Ma prospect is hosted in an extensive, favourably altered, pyritic, silicified and brecciated shear system within a sequence of mafic volcanics intruded by at least two distinct phases of granitic intrusive bodies.

The phase three drill program began at the Ma prospect in early August and is ongoing. This drill program is a continuation of the previous drill phases, and is designed to further evaluate the currently outlined strike extent on regularly spaced sections, extend drilling further along trend and continue testing down dip depth extensions below the favourable gold mineralised intervals previously announced from drill phases one and two. The area of recent drilling focus, the westernmost portion of the Ma prospect, suggests that mineralization is strengthening here, having returned some of our strongest grade-width intersections to-date, and remains open to further expansion. To date, a minimum 1,420-metre extent along strike of the primary Ma structure has been intersected successfully by diamond drilling within the overall + 2,000-metre drilled extent that includes both our diamond and reverse circulation drilling (Figure 2 in Appendix 1).

Representative sections from the Ma prospect are included (see Figures 3, 4, 5, 6 and 7 in Appendix 1). These representative sections demonstrate the correlation and continuity observed for the mineralized structural zones from surface to drilled depths approaching 60-70 metres, and remains open. A complete listing of the drilling results reported in this news release, from the 11 holes comprising the last portion of the phase two drill results and initial 7 holes of the phase three drill program, is included in Table 1.

A complete listing of assays from all Ma prospect diamond drill holes completed to date are shown in an all-prospect combined results Table 3 in Appendix 1.


Ma / Ma East Prospects: RC Drilling

Immediately to the east of the Ma phase one, two and three diamond drill program, recent drill testing by a series of reverse circulation profiles and scout reverse circulation drill holes at the Ma East prospect, as well as between the Ma and Ma East prospects was undertaken (Figure 2 in Appendix 1). This drilling is designed to fill in a gap between our easternmost Ma prospect diamond drill program and the Ma East prospect. As well, it is used to evaluate the prospective surface results of the Ma East prospect, including re-orientation of drilling direction to fully assess all structural zones (Figure 8 in Appendix 1). Results from this evaluation program will assist in follow-up diamond drilling throughout the eastern portion of the Ma prospect.

Results for this reverse circulation scout-drill program, designed to evaluate the potential linking of the Ma and Ma East prospects, are outlined in Table 2, including the following highlight results:
  • 20 m @ 2.50 g/t Au including 8 m @ 4.65 g/t Au (GHRC-057)
  • 7 m @ 2.53 g/t Au including 2 m @ 4.29 g/t Au (GHRC-055)
  • 4 m @ 2.35 g/t Au (GHRC-054)


Other Activities & Next Steps

Diamond drilling (minimum 1,500 metres) is also underway at the Jackhammer Hill prospect. Prior to this current drilling, the Company has drilled only two scout holes here which included a previously reported diamond drill interval of 1.26 g/t Au over 5.2 metres in GHDD-001 (Table 4 in Appendix 1). The current drilling program is outlined on the Jackhammer Hill drill plan, Figure 9 in Appendix 1.

In addition to the ongoing drilling at Ma and Jackhammer Hill, drilling is also planned for both the Nihiri and Peksou prospects in the fourth quarter, following-up on favourable results from drilling evaluation programs earlier in the year. Geologic modeling and initial resource estimation for the most advanced prospects is also being planned for mid-year 2018.<


Drilling Results Tables

Table 1: Ma Prospect Drilling Results (Last 11 Phase Two Holes and Initial 7 Phase Three Holes)

Hole # Northing * Easting * Elevation Azimuth Dip EOH (m) Interval
(m)*
Core
length (m)*
Grade
(g/t Au)
GHDD-037 1237287 452474 425 025 -45 100 51-53 2 1.67
GHDD-042 1237442 452258 417 025 -45 92 46-48 2 1.25
56-58 2 1.76
GHDD-043 1237482 452196 403 025 -45 104 47-49 2 2.01
59-61 2 4.64
87-95 8 3.43
Including 90-93 3 8.02
Including 92-93 1 18.82
GHDD-046 1237714 451894 025 -45 104 15-16 1 11.12
24-26 2 3.59
44-57 13 5.84
Including 50-56 6 11.35
Including 53-56 3 18.82
GHDD-047 1237561 452074 025 -45 80 23-26 3 2.05
40-44 4 1.17
45-53 8 2.00
Including 49-52 3 4.23
GHDD-048 1237573 452005 025 -45 103 77-78 1 5.31
GHDD-049 1237632 451942 025 -45 104 38-39 1 2.46
97-103 6 1.30
Including 97-98 1 4.13
GHDD-051 1237718 452012 025 -45 86 15-17 2 1.46
24-32 8 11.29
Including 25-28 3 29.09
Including 25-26 1 72.75
GHDD-053 1237697 451929 025 -45 80 33-36 3 1.44
48-50 2 1.61
53-59 6 2.13
GHDD-055 1237161 452680 025 -45 90 41-48 7 7.38
Including 41-42 1 46.60
54-55 1 2.46
60-68 8 1.56
GHDD-057 1237245 452582 025 -45 60 47-48 1 9.33
GHDD-059 1237777 451863 017 -45 40 9-11 2 1.84
14-31 17 2.52
Including 22-30 8 4.20
Including 25-29 4 6.34
GHDD-060 1237698 451823 017 -45 100 36-40 4 1.04
84-89 5 2.30
GHDD-061 1237796 451821 017 -45 80 11-12 1 1.11
15-18 3 1.04
21-30 9 4.81
Including 21.25 4 8.51
GHDD-062 1237759 451804 017 -45 125 38-39 1 1.74
57-58 1 1.56
61-62 1 2.11
66-67 1 1.64
GHDD-063 1237777 451770 017 -45 125 43-55 12 12.28
Including 46-50 4 34.04
Including 46-48 2 57.68
GHDD-064 1237793 451732 021 -45 116 NSR
GHDD-065 1237757 451716 021 -45 128 55-56 1 2.79
70-71 1 5.90
76-84 8 2.64
Including 82-84 2 4.66
93-94 1 1.50
104-108 1 1.66
* Intervals calculated with a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. True widths are unknown. UTM's are WGS84-30N.
Intervals with grade x thickness (gram x metre) of 10 or higher are in bold.
NSR means no significant results.


Table 2: Ma / Ma East Prospects – RC Drilling Results

Hole # Northing * Easting * Elevation Azimuth Dip EOH (m) Interval
(m)*
Core
length (m)*
Grade
(g/t Au)
GHRC-038 1236943 452944 374 025 -55 70 0-2 2 0.94
Including 0-1 1 1.47
GHRC-039 1236908 452925 374 025 -55 70 8-14 6 1.81
Including 11-13 2 2.78
GHRC-040 1236873 452907 374 025 -55 70 29-35 6 1.39
Including 30-34 4 1.73
GHRC-041 1236946 453865 375 025 -55 70 20-24 4 0.94
44-45 1 2.35
GHRC-042 1237090 452846 382 025 -55 77 NSR
GHRC-043 1237056 452827 380 025 -55 70 41-43 2 1.07
GHRC-044 1237023 452803 380 025 -55 80 45-51 6 1.70
Including 45-47 2 2.58
GHRC-045 1236990 452786 380 025 -55 90 39-45 6 0.94
Including 44-45 1 2.48
48-54 6 1.34
Including 50-52 2 2.16
GHRC-046 1236902 4530014 371 025 -55 70 NSR
GHRC-047 1236835 452978 371 025 -55 70 6-7 1 1.04
26-29 3 1.70
32-33 1 1.04
GHRC-048 1236866 452994 371 025 -55 70 12-16 4 0.97
Including 12-14 2 1.30
GHRC-049 1237125 452863 383 025 -55 70 7-8 1 1.19
19-20 1 2.12
22-23 1 1.34
27-29 2 1.08
49-52 3 1.30
62-65 3 1.74
Including 64-65 1 3.61
GHRC-050 1236801 452949 372 025 -55 76 54-55 1 1.04
GHRC-051 1236674 453230 366 025 -55 70 NSR
GHRC-052 1236639 453211 367 025 -55 70 NSR
GHRC-053 1236606 453190 368 025 -55 76 18-22 4 0.98
Including 18-20 2 1.73
GHRC-054 1236573 453169 368 025 -55 70 12-16 4 2.35
GHRC-055 1236605 453116 370 025 -55 60 10-17 7 2.53
Including 14-16 2 4.29
GHRC-056 1236436 453163 368 063 -55 75 NSR
GHRC-057 1236168 453383 368 059 -55 70 7-10 3 1.01
16-29 13 1.50
35-55 20 2.50
Including 38-46 8 4.65
* Intervals calculated with a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. True widths are unknown. UTM's are WGS84-30N.
NSR means no significant results.


Competent Persons Statements

Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Mr. Mann has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (the “JORC Code”). Mr. Mann is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in this news release relating exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The RC and diamond core samples are assayed at the BIGGS Laboratory in Ouagadougou, Burkina Faso. Mr. Mann has consented to the inclusion in this news release of the matters based on his compiled information in the form and context in which it appears herein. See Appendix 2 for the JORC Code explanations relating to the results in this press release.


Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"), which reflects management's expectations regarding Teranga's future growth, results of operations (including, without limitation, future production and capital expenditures), performance (both operational and financial) and business prospects (including the timing and development of new deposits and the success of exploration activities) and opportunities. Wherever possible, words such as “objective to”, “likely”, “intend to”, “potential”, “belief”, “believe”, “expects”, “estimates”, “plans”, “anticipated”, “ability” and similar expressions or statements that certain actions, events or results “should”, or "will" have been used to identify such forward-looking information. Forward-looking statements include, without limitation, all disclosure regarding possible events, conditions or results of operations, future economic conditions and anticipated courses of action. Although the forward-looking statements contained in this press release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Teranga cannot be certain that actual results will be consistent with such forward-looking statements. Such forward-looking statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions and its expectations of future developments that management believe to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among other things, the ability to obtain any requisite governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic conditions, the ability to resettle the community within anticipated timeline, anticipated future estimates of free cash flow, and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other factors, such as project execution delays, many of which are beyond the control of Teranga, as well as other risks and uncertainties which are more fully described in Teranga's Annual Information Form dated March 30, 2017, and in other filings of Teranga with securities and regulatory authorities which are available at www.sedar.com. Teranga does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell Teranga securities. All references to Teranga include its subsidiaries unless the context requires otherwise.


About Teranga

Teranga is a multi-jurisdictional West African gold company focused on production and development as well as the exploration of more than 5,000 km2 of land located on prospective gold belts. Since its initial public offering in 2010, Teranga has produced more than 1.2 million ounces of gold from its operations in Senegal, which as of June 30, 2017 had a reserve base of 2.7 million ounces of gold. Focused on diversification and growth, the Company is advancing its Banfora development project and conducting extensive exploration programs in three countries: Burkina Faso, Senegal and Côte d’Ivoire. Teranga has a strong balance sheet and the financial flexibility to grow its business.

Steadfast in its commitment to set the benchmark for responsible mining, Teranga operates in accordance with the highest international standards and aims to act as a catalyst for sustainable economic, environmental, and community development as it strives to create value for all of its stakeholders. Teranga is a member of the United Nations Global Compact and a leading member of the multi-stakeholder group responsible for the submission of the first Senegalese Extractive Industries Transparency Initiative revenue report. The Company's responsibility report, is available at www.terangagold.com/responsibilityreport and is prepared in accordance with its commitments under the United Nations Global Compact and in alignment with the Global Reporting Initiative guidelines.


Contact Information
Richard Young Trish Moran
President & CEO Head of Investor Relations
T: +1 416-594-0000 | E: ryoung@terangagold.com T: +1 416-564-4290 | E: tmoran@terangagold.com


APPENDIX 1

Table 3: DDH Results For All Prospects (GHDD-001 to GHDD-065)

Hole # Northing * Easting * Elevation Azimuth Dip EOH (m) Interval
(m) *
Core
length (m) *
Grade
(g/t Au)
MA
GHDD-008 1237670 452122 408 055 -45 65 23.0-24.0 1.0 1.16
GHDD-009 1237602 452159 398 055 -45 80 31.0-32.0 1.0 2.05
58.0-61.0 3.0 1.60
GHDD-010 1237505 452175 399 039 -45 122 39.5 - 46.0 6.5 2.67
Including 40.0 - 42.0 2.0 5.03
52.0 - 55.0 3.0 8.86
81.0 - 87.0 6.0 1.39
100.0 - 103.0 3.0 0.97
116.0 - 117.0 1.0 1.52
GHDD-011** 1237408 452333 434 024 -45 62 29.2 - 40.0** 9.8 1.92
Including 29.2 - 34.5 5.3 2.62
Including 32.8 - 34.5 1.7 6.06
GHDD-012 1237377 452363 440 020 -45 92 30.0 - 31.0 1.0 3.93
34.0 - 41.0 7.0 1.81
Including 34.0 - 37.0 3.0 2.94
GHDD-013 1237342 452435 437 024 -45 88 23.0 - 26.0 3.0 1.22
79.0 - 80.0 1.0 1.51
GHDD-014 1237297 452457 428 024 -45 63 45.0 - 54.0 9.0 1.55
Including 53.0 - 54.0 1.0 9.20
GHDD-015 1237231 452621 412 020 -45 66 20.9 - 28.8 7.9 2.71
Including 26.2 - 28.8 3.6 5.24
56.0 - 58.0 2.0 1.77
GHDD-016 1236966 452873 375 040 -45 59 11.0 - 15.0 4.0 1.27
26.0 - 28.0 2.0 2.73
GHDD-017 1237758 451855 382 039 -45 111 32.0 - 37.2 5.2 5.16
Including 34.0 - 37.2 3.2 7.38
GHDD-018 1237607 452249 406 020 -45 80 25.0 - 26.0 1.0 1.99
GHDD-019 1237675 452205 412 279 -45 80 NSR
GHDD-020 1237687 452084 408 024 -45 80 23.6 - 28.5 4.9 3.64
Including 25.9 - 27.9 2.0 7.60
GHDD-029 1237524 452149 397 025 -45 70 36.0-41.0 5.0 1.50
Including 38.0-39.0 1.0 5.11
GHDD-030 1237351 452393 438 025 -45 83 30.0-31.0 1.0 3.15
33.0-39.0 6.0 1.40
Including 36.0-38.0 2.0 2.24
64.0-65.0 1.0 2.93
GHDD-031 1237217 452656 409 025 -45 60 22.0-35.0 13.0 1.30
Including 24.0-31.0 7.0 1.95
Including 26.0-28.0 2.0 2.70
GHDD-032 1237148 452798 392 025 -45 94 44.0-46.0 2.0 1.01
GHDD-033 1237188 452725 405 025 -45 95 50.0-52.0 2.0 1.99
56.0-67.0 11.0 1.80
Including 58.0-61.0 3.0 2.79
GHDD-034 1237178 452725 406 025 -45 80 36.0-37.0 1.0 1.34
GHDD-035 1237253 452544 416 025 -45 80 40.0-41.0 1.0 1.21
GHDD-036 1237251 452506 420 025 -45 80 NSR
GHDD-037 1237287 452474 425 025 -45 100 51.0-53.0 2.0 1.67
GHDD-038 1237263 452441 426 025 -45 101 78.0-82.0 4.0 3.38
GHDD-039 1237304 452417 431 025 -45 77 54.0-57.0 3.0 1.02
63.0-64.0 1.0 1.76
GHDD-040 1237344 452347 442 025 -45 83 64.0-73.0 9.0 4.04
Including 67.0-70.0 3.0 9.44
79.0-81.0 2.0 1.63
GHDD-041 1237373 452315 439 025 -45 92 64.0-72.0 8.0 1.36
Including 66.0-68.0 2.0 3.04
78.0-79.0 1.0 2.50
GHDD-042 1237442 452258 417 025 -45 92 46.0-48.0 2.0 1.25
56.0-58.0 2.0 1.76
GHDD-043 1237482 452196 403 025 -45 104 47.0-49.0 2.0 2.01
59.0-61.0 2.0 4.64
87.0-95.0 8.0 3.43
Including 90.0-93.0 3.0 8.02
Including 92.0-93.0 1.0 18.22
GHDD-044 1237472 452155 399 025 -45 122 72.0-74.0 2.0 3.13
95.0-102.0 7.0 1.31
Including 96.0-99.0 3.0 2.18
111.0-112.0 1.0 2.51
GHDD-045 1237736 451839 382 025 -45 102 49.0-56.0 7.0 1.31
Including 51.0-54.0 3.0 2.49
GHDD-046 1237714 451894 387 025 -45 104 15.0-16.0 1.0 11.12
24.0-26.0 2.0 3.59
44.0-57.0 13.0 5.84
Including 50.0-56.0 6.0 11.35
Including 53.0-56.0 3.0 18.82
GHDD-047 1237561 452075 395 025 -45 80 23.0-26.0 3.0 2.05
40.0-44.0 4.0 1.17
45.0-53.0 8.0 2.00
Including 49.0-52.0 3.0 4.23
GHDD-048 1237573 452005 393 025 -45 103 77.0-78.0 1.0 5.31
GHDD-049 1237632 451942 390 025 -45 104 38.0-39.0 1.0 2.46
97.0-103.0 6.0 1.31
Including 97.0-98.0 1.0 4.13
GHDD-050 1237650 452065 399 025 -45 71 36.0-38.0 2.0 1.58
50.0-52.0 2.0 3.98
GHDD-051 1237718 452013 402 025 -45 86 15.0-17.0 2.0 1.46
24.0-32.0 8.0 11.29
Including 25.0-28.0 3.0 29.09
Including 25.0-26.0 1.0 72.75
GHDD-052 1237678 451876 385 025 -45 101 74.0-82.0 8.0 2.04
Including 79.0-82.0 3.0 4.02
GHDD-053 1237697 451929 389 025 -45 80 33.0-36.0 3.0 1.44
48.0-50.0 2.0 1.61
53.0-59.0 6.0 2.13
GHDD-054 1237179 452641 407 025 -45 80 44.0-45.0 1.0 1.20
59.0-60.0 1.0 1.95
GHDD-055 1237161 452680 411 025 -45 90 41.0-48.0 7.0 7.38
Including 41.0-42.0 1.0 46.60
54.0-55.0 1.0 2.46
60.0-68.0 8.0 1.56
GHDD-056 1237202 452698 413 025 -45 60 27.0-33.0 6.0 1.05
Including 31.0-32.0 1.0 1.73
GHDD-057 1237245 452582 419 025 -45 60 47.0-48.0 1.0 9.33
GHDD-058 1237213 452567 415 025 -45 89 54.0-60.0 6.0 1.62
Including 55.0-57.0 2.0 2.82
80.0-81.0 1.0 2.33
GHDD-059 1237777 451863 382 017 -45 40 9.0-11.0 2.0 1.84
14.0-31.0 17.0 2.52
Including 22.0-30.0 8.0 4.20
Including 25.0-29.0 4.0 6.34
GHDD-060 1237698 451823 381 017 -45 100 36.0-40.0 4.0 1.04
84.0-89.0 5.0 2.30
GHDD-061 1237796 451821 380 017 -45 80 11.0-12.0 1.0 1.11
15.0-18.0 3.0 1.04
21.0-30.0 9.0 4.81
Including 21.0-25.0 4.0 8.51
GHDD-062 1237759 451804 380 017 -45 125 38.0-39.0 1.0 1.74
57.0-58.0 1.0 1.56
61.0-62.0 1.0 2.11
66.0-67.0 1.0 1.54
GHDD-063 1237777 451770 380 017 -45 125 43.0-55.0 12.0 12.28
Including 46.0-50.0 4.0 34.04
Including 46.0-48.0 2.0 57.68
GHDD-064 1237793 451732 380 021 -45 116 NSR
GHDD-065 1237757 451716 380 021 -45 128 55.0-56.0 1.0 2.79
70.0-71.0 1.0 5.90
76.0-84.0 8.0 2.64
Including 82.0-84.0 2.0 4.66
93.0-94.0 1.0 1.50
104.0-105.0 1.0 1.66
NAHIRI
GHDD-021 1233908 450542 367 065 -50 115 35.0-45.0 10.0 1.89
Including 43.0-45.0 2.0 5.18
GHDD-022 1233926 450582 366 065 -60 50 NSR
GHDD-023 1233793 450684 360 065 -50 92 21.0-23.0 2.0 2.14
25.0-26.0 1.0 1.07
27.0-28.0 1.0 1.62
29.0-30.0 1.0 1.06
46.0-47.0 1.0 1.44
GHDD-024 1233779 450653 360 065 -50 96 NSR
GHDD-025 1233853 450621 364 065 -50 78 33.0-41.0 8.0 2.09
Including 33.0-34.0 1.0 12.14
GHDD-026*** 1233838 450587 366 065 -50 66 4.0-38.0*** 34.0*** 6.08
Including 9.0-23.0*** 14.0*** 12.38
Including 20.0-21.0 1.0 140.3
GHDD-027 1233726 450717 360 065 -50 71 NSR
GHDD-028 1233741 450755 359 065 -50 23 LOST HOLE
PEKSOU
GHDD-003 1227814 452129 299 200 -50 83 27.0-63.0 36.0 2.32
Including 47.0-59.0 12.0 3.70
Including 58.0-59.0 1.0 11.19
GHDD-004**** 1227774 452167 298 200 -50 98 11.0-93.0 82.0**** 1.43
Including 23.0-24.0 11.0 2.55
And 89.0-93.0 4.0 5.76
GHDD-005 1227650 452364 297 020 -50 59 15.0-23.0 8.0 5.97
Including 18.0-21.0 3.0 13.46
GHDD-006 1227598 452364 297 020 -50 55 26.0-32.0 6.0 20.33
Including 26.0-28.0 2.0 56.16
Including 27.0-28.0 1.0 96.08
GHDD-007 1227598 452401 297 020 -50 65 8.0-10.0 2.0 3.22
32.0-37.0 5.0 2.79
Including 35.0-36.0 1.0 9.49
JACKHAMMER HILL
GHDD-001 1229970 452784 325 131 -55 106 89.8-95.0 5.2 1.26
GHDD-002 1230021 452822 328 135 -55 125 3.0-4.0 1.0 1.48
* Intervals calculated with a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. Sampling used lithologic contacts for the initial drill program, standard metre-metre sampling will be utilized in future. True widths are unknown. UTM's are WGS84-30N
** Interval includes 2 metres of no recovery (34.5-36.5) where hole intersected an artisanal opening
*** During the drilling of the mineralized interval of 4 to 38 metres in drill hole GHDD-026, there were four metre-by-metre samples for which no recovery was reported: (11-12 m, 12-13m, 15-16 m and 19-20m). As such, both the 34-metre and 14-metre intervals reported in the above Table include these four metres without sample material available for analysis. Each of these individual samples have been given a nil value in the reported interval calculations.
**** Drill hole GHDD-004 was designed as a test of the continuity of mineralization identified by historic RC drilling and to provide a continuous drill hole through the primary mineralization hosting Granitic Intrusive and across the contact with the Mafic Volcanics. As demonstrated in Figure 9, drill hole GHDD-004 was drilled in large part down the trend of mineralization and is an exaggerated width. However, this hole has in part, confirmed the continuity of grade down trend, extended the known depth of gold mineralization considerably deeper than previous historic drilling and has greatly improved the confidence in the geologic model of Peksou which will guide future drilling.
NSR means no significant results.


Figure 1: Golden Hill Property – Prospect Location Plan Map
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_1

Figure 2: Ma Prospect – Drill Pla
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_2

Figure 3: Ma Prospect – Representative Drill Section (A-A’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_3

Figure 4: Ma Prospect – Representative Drill Section (B-B’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_4

Figure 5: Ma Prospect – Representative Drill Section (C-C’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_5

Figure 6: Ma Prospect – Representative Drill Section (D-D’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_6

Figure 7: Ma Prospect – Representative Drill Section (E-E’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_7

Figure 8: Ma Prospect (Ma East) – Representative Drill Section (F-F’)
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_8

Figure 9: Jackhammer Hill Prospect– Drill Plan
http://www.terangagold.com/TGZ_PR_Sept_13_17_Golden_Hill_Figure_9
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Teranga Gold Corp. (CDI)
Bergbau
-
-

weitere Unternehmen:

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.