• Samstag, 21 Dezember 2024
  • 06:06 Uhr Frankfurt
  • 05:06 Uhr London
  • 00:06 Uhr New York
  • 00:06 Uhr Toronto
  • 21:06 Uhr Vancouver
  • 16:06 Uhr Sydney

Orla Clarifies September 13, 2017 News Release

15.09.2017  |  Marketwire

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sep 15, 2017) - At the request of IIROC, Orla Mining Ltd. (TSX VENTURE:OLA) ("Orla" or the "Company") wishes to clarify the disclosure in its September 13, 2017 news release titled "Orla Intersects a Combined 104.8 Metres Grading 0.38 g/t Au and 1.71% Cu at the Cerro Quema Project, Panama". Hole CQDH-17-116 intersected 49.0m @ 0.50 g/t Au and 1.39% Cu from 41.0 to 90.0 metres and 55.8m @ 0.28 g/t Au and 1.99% Cu from 118.7 to 174.5 metres. The two intervals are separated by 28.7 metres with very low gold and copper values. The orientation and true thickness of mineralization is unknown.

The Company interprets these as two geologically similar higher-grade zones separated by a geologically distinct low-grade zone. There are sharp grade boundaries at both the upper and lower contacts of the low-grade zone.

Details for CQDH-17-116 are given on the table below:

Hole East North Az Dip Depth Intercepts
From to Width Au g/t Cu %
CQDH-17-116 554476 834623 246 -56 330.0 41.0 90.0 49.0 0.50 1.39
118.7 174.5 55.8 0.28 1.99
Including 126.0 143.5 17.5 0.56 5.26
188.0 199.5 11.5 0.29 0.65

Quality Control Protocols

All gold results were obtained by ALS Minerals (Au-AA23) using fire assay fusion and an atomic absorption spectroscopy finish. All samples are also analyzed for multi-elements, including silver and copper, using an Aqua Regia (ME-ICP41) method at ALS Laboratories in Peru. Samples with copper values in excess of 1% by ICP analysis are re-run with Cu AA46 aqua regia and atomic absorption analysis. Drill program design, Quality Assurance/Quality Control and interpretation of results are performed by qualified persons employing a Quality Assurance/Quality Control program consistent with NI 43-101 and industry best practices. Standards, blanks and duplicates are included approximately one every 25 samples for Quality Assurance/Quality Control purposes by the Company as well as the lab. Approximately 5% of sample pulps are sent to a secondary laboratory for check assays. The HQ diameter core is halved with a diamond saw.

Qualified Person

The technical information in this news release has been reviewed and approved by Mr. Hans Smit, P.Geo., Chief Operating Officer of Orla Mining Ltd., who is the Qualified Person for the technical information in this news release under NI 43-101 standards.

On behalf of the Board of Directors,

Marc Prefontaine, M.Sc., P.Geo., President & Chief Executive Officer

About Orla Mining Ltd.

Orla Mining is a mineral exploration company led by a group of seasoned mining executives with strong financial backing. The company's focus is to acquire mineral exploration opportunities where the Company's exploration and development expertise and corporate share structure could substantially enhance shareholder value. The 100% owned Cerro Quema project in Panama includes a near-term gold production scenario and significant exploration upside. Cerro Quema's 14,800 Ha concession boasts paved road access, a supportive local population and private land ownership. The Cerro Quema project is currently in the last stage of the permitting process for a proposed open pit mine and gold heap leach extraction facility. Please refer to the Cerro Quema Project - Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits dated August 22, 2014, which is available on SEDAR.

Forward-looking Statements

This news release contains certain "forward-looking statements" within the meaning of Canadian and United States securities legislation, including, without limitation, statements with respect to the Company's objectives and strategies. Forward-looking statements are statements that are not historical facts which address events, results, outcomes or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties. Certain material assumptions regarding such forward-looking statements are discussed in this news release, including without limitation, assumptions that the Company's activities will be in accordance with the Company's public statements and stated goals; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained and that there will be no significant disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: risks related to uncertainties inherent in the preparation of preliminary economic assessments, drill results and the estimation of mineral resources; and risks associated with executing the Company's objectives and strategies, including costs and expenses. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.



Contact

Marc Prefontaine
President & Chief Executive Officer
info@orlamining.com
www.orlamining.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Orla Mining Ltd.
Bergbau
A2DHZU
CA68634K1066
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.