• Samstag, 28 Dezember 2024
  • 19:18 Uhr Frankfurt
  • 18:18 Uhr London
  • 13:18 Uhr New York
  • 13:18 Uhr Toronto
  • 10:18 Uhr Vancouver
  • 05:18 Uhr Sydney

Scorpio Gold Reports Annual Gold Production at the Mineral Ridge Operation, Nevada

11.01.2018  |  GlobeNewswire

VANCOUVER, British Columbia, Jan. 10, 2018 (GLOBE NEWSWIRE) -- Scorpio Gold Corp. (“Scorpio Gold” or the “Company”) (TSX-V:SGN) announces its operating results for the full year and the fourth quarter (“Q4”) of 2017 at its 70% owned Mineral Ridge project, located in Nevada.

Total gold production in 2017 was 19,045 ounces, which slightly exceeded the Company’s low-end guidance of 19,000 ounces. The annual production for 2017 of 19,045 ounces represents a decrease of 48% over the prior year. Gold production in Q4 2017 totalled 3,709 ounces representing a decrease of 55% from Q4 of 2016. Mine production decreased in 2017 due to mining 47% fewer ore tonnes, although average grades were 9% higher as compared to the prior year.

Brian Lock, CEO, comments, “As previously announced, mining was suspended in the first week of November 2017. Earlier this month, the Company announced results from Mine Technical Services on the mineable, higher-grade mineralization in the existing pits at Mineral Ridge and a positive updated feasibility study, which supports the Company’s plans for the construction of a 4,000 TPD milling facility with CIL recovery and dry stack tailings circuit. Construction of the milling facility will begin once financing is obtained and the Plan of Operations Amendment and Water Pollution Control permit are approved and issued.”

Key Operating Statistics

Three months ending
December 31
Twelve months ending
December 31
2017 2016 Change 2017 2016 Change
Mining operations


Mary LC pit
Ore tonnes mined - 148,161 -100.0 % 315,242 553,402 -43.0 %
Waste tonnes mined - 977,246 -100.0 % 1,805,218 3,519,285 -48.7 %
Total mined - 1,125,407 -100.0 % 2,120,460 4,072,687 -47.9 %
Strip Ratio - 6.6 -100.0 % 5.7 6.4 -10.9 %
Satellite pits
Ore tonnes mined 24,290 6,028 303.0 % 78,854 196,802 -59.9 %
Waste tonnes mined 113,972 5,888 1,835.7 % 665,226 525,491 26.6 %
Total mined 138,262 11,916 1,060.3 % 744,080 722,293 3.0 %
Strip Ratio 4.7 1.0 370.0 % 8.4 2.7 211.1 %
Total producing pits
Ore tonnes mined 24,290 154,189 -84.2 % 394,096 750,204 -47.5 %
Waste tonnes mined 113,972 983,134 -88.4 % 2,470,444 4,044,776 -38.9 %
Total mined 138,262 1,137,323 -87.8 % 2,864,540 4,794,980 -40.3 %
Strip Ratio 4.7 6.4 -26.6 % 6.3 5.4 16.7 %
Pits under development
Ore tonnes mined - - 0.0 % 772 - 100.0 %
Waste tonnes mined - 160,672 -100.0 % 249,085 309,902 -19.6 %
Total mined - 160,672 -100.0 % 249,857 309,902 -19.4 %
Total mining operations
Ore tonnes mined 24,290 154,189 -84.2 % 394,868 750,204 -47.4 %
Waste tonnes mined 113,972 1,143,806 -90.0 % 2,719,529 4,354,678 -37.5 %
Total mined 138,262 1,297,995 -89.3 % 3,114,397 5,104,882 -39.0 %
Processing
Tonnes processed 30,259 142,101 -78.7 % 398,898 846,140 -52.9 %
Gold head grade (g/t) 1.92 1.37 40.1 % 1.57 1.44 9.0 %
Ounces produced
Gold 3,709 8,301 -55.3 % 19,045 36,879 -48.4 %
Silver 2,256 4,074 -44.6 % 10,203 16,950 -39.8 %
Crusher throughput (tonnes per day) 672 1,545 -56.5 % 1,254 2,312 -45.8 %
Recoverable(1) gold ounces placed on pad 1,212 4,301 -71.8 % 13,668 26,549 -48.5 %

(1) A weighted average metallurgical recovery factor has been applied to the estimated contained ounces crushed and placed on the leach pad based on the pit from which the ore was mined.

About Scorpio Gold

Scorpio Gold holds a 70% interest in the Mineral Ridge gold mining operation located in Esmeralda County, Nevada with joint venture partner Elevon, LLC (30%). Mineral Ridge is a conventional open pit mining and heap leach operation. Mining at Mineral Ridge was suspended in November 2017; however, the Company continues to generate limited revenues from residual but diminishing recoveries from the leach pads. Scorpio Gold also holds a 100% interest in the advanced exploration-stage Goldwedge property in Manhattan, Nevada with a fully permitted underground mine and 400 ton per day mill facility. The Goldwedge mill facility has been placed on a care and maintenance basis and can be restarted immediately when needed.

Scorpio Gold’s Chairman, Peter J. Hawley, PGeo, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the content of this news release.

ON BEHALF OF THE BOARD
SCORPIO GOLD CORPORATION

Chris Zerga,
President

For further information contact:
Chris Zerga, President
Tel: 604-678-9639
Email: czerga@scorpiogold.com

Website: www.scorpiogold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The Company relies on litigation protection for forward-looking statements. This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur, and include, without restriction, any statements regarding pending permit approval, planned financing and construction activities and planned future production. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements, including risks related to open pit mining, unanticipated changes in the mineral content of materials being mined; unanticipated changes in recovery rates; changes in project parameters; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; availability of skilled labour and the impact of labour disputes; delays in obtaining approval to the revised Plan of Operations, permits and governmental approvals; changes in metals prices; the availability of cash flows or financing to meet the Company’s ongoing financial obligations or to finance the construction of the mill facility; unanticipated changes in key management personnel; changes in general economic conditions; other risks of the mining industry; and those risk factors outlined in the Company’s Management Discussion and Analysis as filed on SEDAR. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty thereof.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Scorpio Gold Corp.
Bergbau
A3E2GX
CA80918M3021
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.