TORONTO, April 03, 2018 (GLOBE NEWSWIRE) -- Fura Gems Inc. (TSX-V:FURA) (OTC:FUGMF) (FRA:BJ43) is re-releasing a condensed version of its news release which was issued on March 21, 2018 to ensure that all of its shareholders and potential investors are aware of the important announcement that Fura has commenced its Bulk Sampling Program at the Coscuez emerald project in Boyacá, Colombia (the “Coscuez Emerald Mine”) and has mined a total of 1,720 carats of emeralds to date. Please see Fura’s news release dated March 21, 2018 for further details.
|
Key Highlights
- The Bulk Sampling Program has been initiated and total of 30,000 tons of material from the mineralized body are expected to be collected in the first phase of the program on or before December 31, 2018 using existing tunnels;
- During the initial phase of bulk sampling, a total of 1,720 carats of emeralds were mined, out of which 826 carats were high quality emeralds;
- Detailed geological and topographic survey programs have been initiated and to date, 24 historical workable tunnels, consisting of 17km, have been surveyed and mapped out of 23km; and
- The Fura management team has started designing the pilot wash-plant to support the bulk sampling process with a rated capacity of 30 tons per hour (“tph”) and the Company expects such plant to be commissioned on or before June 30, 2018.
Dev Shetty, President & CEO of Fura, commented:
“Fura has achieved an important milestone by commencing the bulk sampling mining operation at the Coscuez emerald mine within eight weeks of the completing the acquisition of the mine.”
“The initial production of 1,720 carats of emeralds, including 826 carats of top quality emeralds, during the early stage of the program further confirms the quality of the Coscuez emerald mine. We will continue to build our geological knowledge of the license area and also strive to modernize the Coscuez emerald mine. Fura has now become the first publicly listed company in the world to commence a bulk sampling operation in Colombia, the world’s largest supplier of emeralds.”
Bulk Sampling Program
Prior to Fura’s acquisition of the Coscuez Emerald Mine, the previous management used small-scale underground mining methods, such as blasting of the mineralization zone within the carbonaceous shale, chiseling of the calcite veins within the carbonaceous shale and focusing on the manual extraction of emeralds present on the calcite veins. The mine has historically been operated using non-mechanized methods without a wash-plant for the washing of the mined mineralized body or recording of grade and tons mined.
The Bulk Sampling Program was initiated the second week of February 2018 and Fura plans to mine a total of 30,000 tons of material as a part of this program. The program will be completed in two phases and will continue until December 31, 2018.
The main objective of a Bulk Sampling Program is to collect representative samples from the mineralized body at different levels from all accessible tunnels and workings within the license area. The data collected from the program will then be modeled to understand the mineralized body grade and accordingly, if conclusive, a large-scale mining plan can be devised.
Photos accompanying this announcement are available at
http://www.globenewswire.com/NewsRoom/AttachmentNg/ca456856-706a-4fcc-8833-0a00e186718f
http://www.globenewswire.com/NewsRoom/AttachmentNg/5e1e25a6-42f4-4efb-9de9-bac7f824a933
http://www.globenewswire.com/NewsRoom/AttachmentNg/f204a3cb-81a3-48bc-a2e4-8b57a44b841e
Initial Production during the Bulk Sampling Program
During the first phase of the Bulk Sampling Program, a total of 1,720 carats have been discovered, out of which 826 carats are of high quality
A photo accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/0abd693a-878d-42de-b5b9-9b22e814adc2
Pilot Wash Plant
Fura has started working on the design of the Pilot Wash-Plant to support the bulk sampling process with a rated capacity of 30 tph and with an annualized capacity of 100,000 tons per annum. The Company expects the plant to be commissioned on or before June 30, 2018.
Cautionary Note Regarding Mining Operations
The Company cautions that it is not basing its production decision on a feasibility study of mineral reserves demonstrating economic and technical viability, and as a result there is increased uncertainty and there are multiple technical and economic risks of failure which are associated with this production decision. These risks, among others, include areas that are analyzed in more detail in a feasibility study, such as applying economic analysis to resources and reserves and a number of specialized studies in areas such as mining and recovery methods, market analysis, and environmental and community impacts.
For more information about Fura Gems Inc., please contact:
Fura Gems Inc. | |
Dev Shetty - President & Chief Executive Officer | Tel: +971 (0) 4 240 8760 dev.shetty@furagems.com |
Vikram Pathak – Investor Relations | Tel: +1-647-276-7816 vikram.pathak@furagems.com |
Public Relations | |
Tavistock (UK) Jos Simson / Barney Hayward | Tel: +44-207-920-3150 fura@tavistock.co.uk |
Investor Relations Renmark Financial Communications Inc. Barry Mire, Vice President | Tel.: 416-644-2020 or 514-939-3989 bmire@renmarkfinancial.com |
About Fura Gems Inc.
Fura Gems Inc. is a gemstone mining and marketing company which is engaged in the mining, exploration and acquisition of gemstone licences. Fura’s headquarters are located in Toronto, Canada and its administrative headquarters are located in the Almas Tower, Dubai. Fura is listed on the TSX Venture Exchange under the ticker symbol “FURA”.
Fura is engaged in the exploration of resource properties in Colombia and owns a 76% interest the Coscuez emerald mine in Boyacá, Colombia and a 100% interest in the emerald licence ECH -121. Fura is involved in the exploration and mining of rubies in Mozambique through its 80% effective interest in the four ruby licences (4392, 3868, 3869 and 6811) that it acquired in November 2017.
Qualified Person
Ricardo A. Valls, M.Sc., P.Geo., of Valls Geoconsultant, Toronto, Ontario, a Qualified Person as defined by National Instrument 43-101, has reviewed the scientific and technical information disclosed in this news release and has approved its dissemination. Mr. Valls is considered independent of Fura.
Regulatory Statements
This press release may contain “forward looking information” within the meaning of applicable Canadian securities legislation. Forward looking information includes, but is not limited to, statements with respect the mineralization as the Coscuez Emerald Mine, the prospectivity of the Coscuez Emerald Mine, the Company’s ability to complete the Bulk Sampling Program, the results of the Bulk Sampling Program, the Company’s ability to commission the pilot-wash plant, the Company’s ability to develop the Coscuez Emerald Mine, the market price of Emeralds and other gemstones, the Company’s exploration activities and mining activities and the Company’s performance. Generally, forward looking information can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of exploration activities; regulatory risks; risks inherent in foreign operations, uncertainties with respect to the Coscuez deposit, which has never been subject to modern mining methods nor any comprehensive feasibility study; legacy environmental risks, title risks and other risks of the mining industry. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.