• Sonntag, 22 Dezember 2024
  • 23:17 Uhr Frankfurt
  • 22:17 Uhr London
  • 17:17 Uhr New York
  • 17:17 Uhr Toronto
  • 14:17 Uhr Vancouver
  • 09:17 Uhr Sydney

Piedmont Secures Site For Lithium Chemical Plant

05.07.2018  |  PR Newswire

NEW YORK, July 5, 2018 /PRNewswire/ --

  • Acquisition of Heavy-Industrial zoned property in Kings Mountain, North Carolina
  • Short truck haul from proposed mine and concentrator sites
  • Immediate access to major rail, power, gas, and highway infrastructure
  • Permitting activity for lithium chemical plant expected to commence in Q3 2018
  • Site acquisition advances vertically-integrated lithium chemicals production strategy
  • Lithium chemical plant will focus on production of battery-grade quality lithium hydroxide

Piedmont Lithium Ltd. ("Piedmont" or "Company") (ASX:PLL; NASDAQ: PLLL) is pleased to advise that the Company has acquired a 60.6-acre parcel in Kings Mountain, North Carolina as a potential site for its planned lithium chemical plant.  This acquisition represents an important step in the development of the vertically-integrated Piedmont Lithium Project located in North Carolina, USA.

The lithium chemical plant site is approximately a 20-mile truck haul from the Company's proposed spodumene mine and concentrator, minimizing the freight cost for concentrate delivery to the proposed facility.  Zoned heavy-industrial, the plant site has direct access to a Norfolk Southern rail line, Interstate I-85 and US Highway 29.  The site also has natural gas and power transmission immediately adjacent to the property.

The site will be included in the Company's scoping study which is on track for completion in Q3 2018.  The planned lithium chemical plant will convert Piedmont Lithium-produced spodumene concentrate to lithium chemicals, with a focus on battery grade lithium hydroxide.  Lithium hydroxide commands a pricing premium relative to lithium carbonate, and recent studies have reported that lithium hydroxide produced from spodumene has a production cost advantage relative to production from brines.  Piedmont Lithium will commence permitting of the lithium chemical plant upon completion of the Scoping Study.

Keith D. Phillips, President and Chief Executive Officer, said, "We are very pleased to have identified such an attractive site for our downstream operations.  The site is a short drive from our core mining and concentration properties, it is the proper scale for our contemplated lithium chemical production operations, and it offers all the infrastructure one would seek for such a facility. Piedmont is focused on building an integrated lithium chemical operation in North Carolina, and this site will be an integral part of our plans."

For further information, contact:

Keith D. Phillips

Anastasios (Taso) Arima

President & CEO

Executive Director

T: +1 973 809 0505

T: +1 347 899 1522

E: kphillips@piedmontlithium.com

E: tarima@piedmontlithium.com

 

View original content with multimedia:http://www.prnewswire.com/news-releases/piedmont-secures-site-for-lithium-chemical-plant-300676541.html

SOURCE Piedmont Lithium Ltd.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Piedmont Lithium Inc.
Bergbau
A3CQ2G
AU000000PLL5

weitere Unternehmen:

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.