• Samstag, 23 November 2024
  • 02:22 Uhr Frankfurt
  • 01:22 Uhr London
  • 20:22 Uhr New York
  • 20:22 Uhr Toronto
  • 17:22 Uhr Vancouver
  • 12:22 Uhr Sydney

Sierra Metals Announces Filing of NI 43-101 Technical Report on the Preliminary Economic Assessment Report for its Bolivar Mine in Mexico with a 67% Output Expansion Yielding a 550% Return on Investment

23.08.2018  |  CNW

TORONTO, Aug. 23, 2018 - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) (NYSE AMERICAN: SMTS) ("Sierra Metals" or "the Company") has filed a technical report prepared in accordance with National Instrument 43-101 ("NI 43-101") on the Bolivar Mine (the "Report"). The Report supports the disclosure made by the Company in its news release dated July 9, 2018 entitled "Sierra Metals Announces Positive Preliminary Economic Assessment Results for a 67% Output Expansion at its Bolivar Mine in Mexico to 5,000 Tonnes Per Day Yielding a Return on Investment of 550%."

The Report is based on technical inputs from various independent consulting groups, including; SRK, Redco, Transmin Metallurgical Consultants and Anddes and was compiled under National Instrument 43-101 standards by Mining Plus Peru SAC. There are no material differences in the Preliminary Economic Assessment results contained in the Report from those disclosed in the July 9, 2018 news release.

This subsequent report is based on the results from a 43-101 Technical Report on the Bolivar Mine dated June 28, 2018 with an effective date of October 31, 2017 entitled "NI 43-101 Technical Report on Resources and Reserves Bolivar Mine Mexico", that was prepared by independent SRK Consulting (U.S.), Inc.

The Report included PEA results with:

  • After-tax Net Present Value (NPV): US$214 Million at an 8% discount rate
  • Return on Investment (ROI): 550%
  • After-tax Payback Period: 3.4 years
  • Life of Mine Capital Cost: US$96 Million
  • Net After-tax Cash Flow: US$303 Million
  • Total Operating Unit Cost: US$21.18/tonne
  • Plant Processing Rate: 5,000 tonnes per day (TPD)
  • Average Copper Recovery Rate 85%
  • Mine Life: 11 years based on existing Mineral Resource Estimate
  • Life of Mine Copper Payable Production: 252,507,942 pounds

The Report dated August 21, 2018 with an effective date of October 31, 2017 is entitled "NI 43-101 Preliminary Economic Assessment (PEA) for the Bolivar Mine, Mexico" and was prepared by independent consultant Mining Plus Peru SAC.

Signed by Qualified Persons:

Enrique Rubio, Ph.D.

Giovanny Ortiz, BSc, PGeo, FAusIMM CP

Augusto Chung, FAusIMM CP

The information in this announcement regarding the PEA results included in the Report is qualified in its entirety by reference to the Report. The Report is available for review on SEDAR (www.sedar.com), EDGAR (www.SEC.gov) and the Company's website (www.sierrametals.com).

Quality Control

All technical data contained in this news release has been reviewed and approved by:

Gordon Babcock, P.Eng., Chief Operating Officer and a Qualified Person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Americo Zuzunaga, MAusIMM CP (Mining Engineer) and Vice President of Corporate Planning is a Qualified Person and chartered professional qualifying as a Competent Person under the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

Augusto Chung, FAusIMM CP (Metallurgist) and Consultant to Sierra Metals is a Qualified Person and chartered professional qualifying as a Competent Person on metallurgical processes.

About Sierra Metals

Sierra Metals Inc. is Canadian based growing polymetallic mining company with production from its Yauricocha Mine in Peru, and its Bolivar and Cusi Mines in Mexico. The Company is focused on increasing production volume and growing mineral resources. Sierra Metals has recently had several new key discoveries and still has many more exciting brownfield exploration opportunities at all three Mines in Peru and Mexico that are within close proximity to the existing mines. Additionally, the Company also has large land packages at all three mines with several prospective regional targets providing longer-term exploration upside and mineral resource growth potential.

The Company's Common Shares trade on the Bolsa de Valores de Lima and on the Toronto Stock Exchange under the symbol "SMT" and on the NYSE American Exchange under the symbol "SMTS."

Continue to Follow, Like and Watch our progress:

Web: www.sierrametals.com | Twitter: sierrametals | Facebook: SierraMetalsInc | LinkedIn: Sierra Metals Inc.

Forward-Looking Statements

This press release contains "forward-looking information" and "forward-looking statements" within the meaning of Canadian and U.S. securities laws related to the Company (collectively, "forward-looking information"). Forward-looking information includes, but is not limited to, statements with respect to the Company's operations, including the anticipated developments in the Company's operations in future periods, the Company's planned exploration activities, the adequacy of the Company's financial resources, and other events or conditions that may occur in the future. Statements concerning mineral reserve and resource estimates may also be considered to constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if and when the properties are developed or further developed. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking information.

Forward-looking information is subject to a variety of risks and uncertainties, which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, risks inherent in the mining industry including environmental hazards, industrial accidents, unusual or unexpected geological formations, floods, labour disruptions, explosions, cave-ins, weather conditions and criminal activity; commodity price fluctuations; higher operating and/or capital costs; lack of available infrastructure; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks associated with the estimation of mineral resources and the geology, grade and continuity of mineral deposits and the inability to replace reserves; fluctuations in the price of commodities used in the Company's operations; risks related to foreign operations; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; risks relating to outstanding borrowings; issues regarding title to the Company's properties; risks related to environmental regulation; litigation risks; risks related to uninsured hazards; the impact of competition; volatility in the price of the Company's securities; global financial risks; inability to attract or retain qualified employees; potential conflicts of interest; risks related to a controlling group of shareholders; dependence on third parties; differences in U.S. and Canadian reporting of mineral reserves and resources; potential dilutive transactions; foreign currency risks; risks related to business cycles; liquidity risks; reliance on internal control systems; credit risks, including risks related to the Company's compliance with covenants with respect to its BCP Facility; uncertainty of production and cost estimates for the Yauricocha Mine, the Bolivar Mine and the Cusi Mine; and other risks identified in the Company's filings with Canadian securities regulators and the U.S. Securities and Exchange Commission ("SEC"), which filings are available at www.sedar.com and www.sec.gov, respectively.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking information. Forward-looking information includes statements about the future and are inherently uncertain, and the Company's actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks, uncertainties and other factors. The Company's statements containing forward-looking information are based on the beliefs, expectations, and opinions of management on the date the statements are made, and the Company does not assume any obligation to update forward-looking information if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking information.

Note Regarding Reserve and Resource Estimates

All reserve and resource estimates reported by the Company are calculated in accordance with the Canadian National Instrument 43-101 -  Standards of Disclosure for Mineral Projects and the Canadian Institute of Mining and Metallurgy Classification system. These standards differ significantly from the requirements of the SEC. The differences between these standards are discussed in our SEC filings. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

View original content:http://www.prnewswire.com/news-releases/sierra-metals-announces-filing-of-ni-43-101-technical-report-on-the-preliminary-economic-assessment-report-for-its-bolivar-mine-in-mexico-with-a-67-output-expansion-yielding-a-550-return-on-investment-300701892.html

SOURCE Sierra Metals Inc.



Contact
regarding Sierra Metals, please visit www.sierrametals.com or contact: Mike McAllister, V.P., Corporate Development, Sierra Metals Inc., +1 (416) 366-7777, Email: info@sierrametals.com; Igor Gonzales, President & CEO, Sierra Metals Inc., +1(416) 366-7777; Gordon Babcock, Chief Operating Officer, Sierra Metals Inc., +1(416) 366-7777
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Sierra Metals Inc.
Bergbau
A1J9PT
CA82639W1068
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.