• Freitag, 22 November 2024
  • 02:48 Uhr Frankfurt
  • 01:48 Uhr London
  • 20:48 Uhr New York
  • 20:48 Uhr Toronto
  • 17:48 Uhr Vancouver
  • 12:48 Uhr Sydney

European Electric Metals Commences Underground Program Within the Mine

23.10.2018  |  GlobeNewswire
  • sampling to cover two adjoining mining blocks in the Skroska Nickel-Cobalt Mine
  • mining blocks are accessible and supported by existing mining infrastructure
  • focus of sampling is to follow up on the elevated cobalt levels identified by EVX in Phase One designed to target National Instrument 43-101 compliant resource estimate

VANCOUVER, Oct. 23, 2018 - European Electric Metals Inc. (TSXV:EVX) (OTC PINK:EVXXF) (“EVX”) (the “Company”) is commencing an underground sampling program over two adjoining parts of the laterite deposit measuring 250m x 45m and 70m x 40m where for the most part the infrastructure is ready. The blocks are accessible and supported by existing underground mining infrastructure. The area has been deemed during company inspections to be in good working condition, and, subject to engineering review, conducive to restarting mining operation.

There is electricity throughout the mine and the track system and air compression systems are in good working order. There is no water issue and the mine is well ventilated with no mechanized ventilation system in place. There are no rockfalls in any areas of the mine. The mine is serviced via hydro-electric power (the mine is on the power grid) and has paved road access nearby the property area with well-maintained gravel roads to the site. The site also has good office infrastructure and various storage/outbuildings that formerly supported previous state-run operation (1985-1990) and operation by current owner from 2008 to 2013 when it was put on care and maintenance.

It is anticipated that the sampling program will be completed within the next 30 days, during which time the Company also intends to engage an engineering firm to conduct geological model and engineering studies focused on restarting operation.

EVX CEO, Fred Tejada, states, “The infrastructure and development at Skroska is in excellent condition. The recent EVX news regarding elevated cobalt levels describes, in our view, a new discovery within an existing mine. We believe this new cobalt discovery has the potential to positively impact the economics of the project.”

This sampling program is a follow up to the high-grade first phase results announced by EVX on October 11, 2018 via a News Release that described 18 laterite samples collected from 10 different underground locations in Skroska. The assays ranged from 0.05% to 0.54% Co and from 0.36% to 1.92% Ni. Ten of these samples assayed 0.15% Co and above and are shown in the table below. The presence of this cobalt-rich laterite had not been previously recognized at Skroska.

Sample Sample
Width
% Co % Ni % Fe2O3 % MnO
Number Meters
1A 0.80 0.20 1.46 67.00 0.289
1B 0.75 0.16 1.36 62.96 0.394
4A 1.05 0.16 1.33 71.60 0.625
6A 1.05 0.15 1.46 71.01 0.44
7A 0.85 0.18 1.39 64.79 0.56
7T 0.50 0.35 1.45 55.22 0.71
8C 0.70 0.22 1.12 76.09 0.95
8B 0.75 0.20 1.31 76.28 0.86
9A 0.70 0.24 1.46 65.89 0.64
9T 0.40 0.54 1.92 51.00 0.51

The samples were taken vertically from the pillars/columns of the mine and have widths varying from 0.40 meter to 1.10 meters. Where two samples have the same preceding number (i.e. 7A and 7B) it means they were taken from the same location and are contiguous. The majority of the samples were collected at Level-815 of the underground mine, with three samples taken at Level-850. The sampling program covered a lateral distance of approximately 420 meters. The location of the samples and their corresponding assays are shown in the Company’s website (www.europeanelectricmetals.com).

The samples were sent to ALS Lab in Serbia for preparation and sent to their laboratory in Ireland for analysis. The analytical suite selected was ME-XRF12n. This analytical suite is suitable in the analysis of nickel laterite samples.

Jose Mario Castelo Branco, EuroGeol, a Qualified Person under the meaning of Canadian National Instrument 43-101 and Chief Geologist of the Company is responsible for the technical content of this news release.

About European Electric Metals Inc.

European Electric Metals Inc. is a Canadian listed public company, with a focus on electrification themed projects in Europe. A major shareholder of EVX is the European Bank for Reconstruction and Development. The goal of EVX is to become a major source of battery metals such as copper, nickel and cobalt, and the Company seeks to do so within safe, stable and logistically attractive European jurisdictions. The Company's projects are ideally located with excellent road, port and grid power availability, and near European countries that are poised to experience dramatic growth in the electric-vehicle-manufacturing industry. There is a strong battery-manufacturing industry within Europe with many more projects in the pipeline.

On behalf of the Company,

Fred Tejada, Chief Executive Officer and Director

Forward-Looking Statements. This news release contains “forward-looking” statements and information relating to the Company and Skroska are based on the beliefs of Company management, as well as assumptions made by and information currently available to Company management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, general economic conditions, changes in financial markets, the ability to properly and efficiently staff the Company’s operations, the sufficiency of working capital and funding for continued operations, title matters, community relations, operating hazards, political and economic factors, competitive factors, metal prices, relationships with vendors, governmental regulations and oversight, permitting, seasonality and weather, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. The Company does not undertake to update forward-looking statements or forward-looking information, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

488-1090 West Georgia St.
Vancouver BC, Canada V6E3V7
Tel: 604-687-7130
www.europeanelectricmetals.com
info@europeanelectricmetals.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
European Electric Metals Inc.
Bergbau
A2QEPQ
CA29877A2056
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.