Centamin PLC Announces Significant Côte d’Ivoire Resource Increase

15.02.2019  |  Accesswire

Significant Côte d'Ivoire Resource Increase

PERTH, February 15, 2019 - Centamin is pleased to announce the results of the 120,000 metres drill programme in 2018, across the Company's wholly own landholdings, resulted in an increase in mineral resources by more than 100%. A maiden resource has been declared at the ABC Project and the Doropo Project mineral resource has grown by 58%. Building on these results, a further 90,000 metres is budgeted and underway for 2019.

HIGHLIGHTS

DoropoProject ("Doropo")

• 2.13Moz Indicated and 0.8Moz Inferred mineral resource, at a gold cut-off of 0.5g/t:

o 50 million tonnes at 1.31 g/t gold in the Indicated category, a 55% increase in resource tonnes YoY;

o 19 million tonnes at 1.3g/t gold in Inferred category; and

o 57,000 metres of reverse circulation ("RC") drilling completed in 2018.

• Successfully increased the estimated tonnages at all the previously defined resource structures and discovery of new structures capable of adding further resources;

• Updated mineral resource sits within a 6km radius area, extends from surface to a maximum depth of 250m, suitable for open pit mining and trucking to one central processing facility.

• Doropo licence holding of 2,721km2 remains largely underexplored with numerous targets identified, presenting significant resource upside potential.

• Discovery of Kilosegui, an 8km long surface soils-auger anomaly to be tested with drilling during 2019.

• Further positive results from Chegue (15m @ 8.4g/t Au), Han (7m @ 23.4g/t Au), Kekeda (13m @11.2g/t Au), Hinda (10m @ 5.8g/t Au) and Nokpa (37m @ 6.4g/t Au) with the main resource structures remaining open at depth and along strike. A table of significant drill highlights included within the announcement.

• A 55,000 metre drill programme is budgeted for 2019 to develop the immediate resource extensions and evaluate the resource significance of the major regional Doropo targets.

• Preliminary economic assessment ("PEA") progresses on schedule for completion by H2 2019; Maiden mineral reserve estimation targeted by Q2 2019, supporting the next stage feasibility work ahead of a Board investment decision on development.

ABCProject ("ABC")

• Maiden resource estimate declared at Kona South prospect, at a 0.5 g/t gold cut-off:

o 19.6 million ore tonnes at 1.03 g/t gold in the Indicated category for 650koz of gold;

o 16.1 million ore tonnes at 0.87 g/t gold in the Inferred category for approximately 450koz of gold;

o The mineral resource area is defined from surface, along a 2.3 km strike, and remains open in all directions; and

o Detailed 3D grade modelling indicates there are high-grade plunging shoots within the 50m x 50m broad-spaced drilling.

• Excellent conversion from discovery to defined mineral resource:

o Active exploration started Q2 2017, first gold mineralisation discovered Q3 2017, delineating the Lolosso Gold Corridor ("LGC"), a gold anomaly with a 23km strike length;

o 25,000 metres drilled to date across the ABC landholding, of which 65% was focussed on the Kona South prospect;

o Average discovery cost of US$8.50 per Indicated ounce; and

o Encouraging drill intercepts returned at the Kona Central prospect; Resource upside potential with further assessment, infill drilling and 3D modelling planned during 2019.

• Preliminary metallurgical test work suggests no major metallurgical issues with high recovery rates expected from conventional CIL processing.

• A 34,000 metres drill programme is budgeted for 2019 focussing on resource development at Kona Central and Kona South, while testing the resource extension potential between the two prospects, drill testing high priority targets along the LGC in addition to airborne magnetic/radiometric surveying and geochemical sampling.

MineralResources

The mineral resource data presented in the tables included in this announcement, comprise a summary extract of the of the Doropo and ABC mineral resource report, using drill assay results received up to and including 10 December 2018. For comparative purposes, data for 2017 has been included for Doropo. In the instance of ABC, this is a maiden mineral resource and therefore no previous data has been provided for comparative purposes. Numbers have been rounded and therefore they may be small differences in the totals.

2018

2017

Category

Tonnage (Mt)

Grade (g/t)

Gold Content (Moz)

Tonnage (Mt)

Grade (g/t)

Gold Content (Moz)

Doropo Project

Measured

(0.5g/t cut-off)

Indicated

50

1.31

2.13

32.6

1.3

1.35

M+I

50

1.31

2.13

32.6

1.3

1.35

Inferred

19

1.3

0.8

24.8

1.2

0.90

ABC Prospect

Measured

(0.5g/t cut-off)

Indicated

20

1.03

0.65

M+I

20

1.03

0.65

Inferred

16

0.9

0.5

AndrewPardey, CEO commented:

"2018saw a further increase in our investment and level of activity in CDI acrossour 3,472km² land holding. We have only scratched the surface of thepotential of these assets, and we are maintaining an intensive campaign in 2019to define further quality gold ounces.

Doropocontinues to demonstrate the potential to be our next organic developmentproject. Ongoing exploration and concurrent viability studies will furtherunlock the potential future scale of this project as we assess the economicsagainst our internal project value creation criteria. The PEA is progressingwell and we look forward to reporting the results to the market at the end ofH2 2019. Delivery of a maiden reserve and further feasibility work are criticalmilestones for 2019, ahead of a Board decision on capital allocated fordevelopment.

Thesuccess and scale of the 2018 ABC discovery results and the reporting of themaiden Kona South resource in less than two years of active exploration,highlights the scale and quality of the Lolosso Gold Corridor and the regionalgenerative potential of the ABC land package.

Centamin'score strategy remains on delivering returns using its highly cash generativebusiness which not only delivers a high yield for its shareholders as per oursustainable dividend policy, but also delivering fully funded growth from ourexciting exploration portfolio."

QualifiedPerson and Quality Control

Information of a scientific or technical nature in this document, including but not limited to the mineral resource estimates, was compiled by Group geologists, Pierrick Couderc and Fidele Kakou, under the supervision of Group Qualified Person, Norman Baillie, Group Exploration Manager, and independent Qualified Person, Rupert Osborn of H&S Consultants Pty Ltd. A Qualified Person is as defined by the National Instrument 43-101 of the Canadian Securities Administrators.

Named Qualified Persons have verified the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in this announcement in accordance with standards appropriate to their qualifications. Each Qualified Person consents to the inclusion of the information in this document in the form and context in which it appears.

Investors should be aware that the figures stated are estimates and no assurances can be given that the stated quantities of metal will be produced.

Mineral resource estimates contained in this document are based on all available data as at 10 December 2018, in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) definition standards and incorporated into National Instrument 43-101 "Standards of Disclosure for Mineral Projects" (NI-43101), at a gold cut-off grade of 0.5g/t.

For further information,please visit www.centamin.com or contact:

Centamin plc

Andrew Pardey, Chief Executive Officer

Alexandra Carse, Investor Relations

+44 (0) 7700 713 738

alexandra.carse@centamin.je

Buchanan Communications

Bobby Morse

Chris Judd

+ 44 (0) 20 7466 5000

centamin@buchanan.uk.com


Background

DOROPOPROJECT

The Doropo Project, located in the northeast Cote d'Ivoire, consists of nine permits, over a 2,721km2 highly prospective landholding that lies between the Boromo-Batie and the Hounde-Tehini greenstones belts.

The Company began extensive exploration at Doropo in late 2014, leading to maiden resource declared in 2017. The Company's experienced exploration team have achieved year-on-year resource growth. The team applies a systematic approach to prioritise resource-focussed target generation and ranking to fast-track the most prospective target.

Geology

The Doropo landholding lies entirely within the granitic domain, bounded on the eastern side by the Boromo-Batie greenstones belt, in Burkina Faso, and on the western side by the Tehini-Hounde greenstones belt.

At the project scale, the geology consists of a granite-gneiss terrain, the granite being mostly of coarse granodioritic composition, bound by major bimodal greenstone belts, which express progressive assimilation and strain gradients at the margins, evidenced by the presence of pyroxenites and amphibolites in the volcanic suites and migmatites in the granitoids (mostly on the western side).

Gold mineralisation occurs late in the regionally-extensive, reactivating compressional shear networks, framed by intense silica-sericite-carbonate alteration haloes. The main structural hosts are cross-cutting quartz veins with diffuse overprinting with fine to medium grained pyrite sulphide selvages. Gold grade correlates with the density of pyrite and high grades are correlated with native gold within the structural laminations and contacts of the quartz veining. The veins range up to several metres. Late regional, post-gold, doleritic dykes intrude along a number of the gold-bearing shear structures.

Exploration

In 2018, nearly 100,000 metres were drilled across Doropo. Over 56,000 metres of RC drilling focusing on mineral resource definition and exploration targeting; 36,000 metres of aircore and auger drilling defining new strong surface anomalies and follow up targets; and approx. 2,800 metres of diamond drilling for metallurgical test work samples as part of the PEA study.

Assay results received in 2018 significantly extended Chegue Main, Chegue South and Enioda deposits, defined new high-grade shoots at Souwa, Han and Nokpa and discovered the new Tchouahinin resource. The Doropo mineral resource grew to 2.13Moz at 1.31g/t in the Indicated category, and 760koz at 1.3g/t in the Inferred category, using a 0.5g/t cut-off grade.

The currently defined mineral resource deposits lie within a 6km radius. Souwa, Nokpa, Chegue Main and Chegue South, which hosts 75% of the total mineral resource, are clustered within 3km radius of a proposed plant location. Han, Kekeda Tchouahinin are satellite deposits located 4 to 6km to the southeast and Enioda sits 12km to the east.

The Souwa deposit currently hosts the largest resource and remains structurally open in all directions. Mineralisation extends over a 2.6km strike and dips 25o west to greater than 250m vertical depth. Drilling in 2019 will target the down-plunge extensions of the composite high-grade shoots and the northern strike extension of the resource to where it intersects the Nokpa-Chegue structure.

The Nokpa deposit returned some excellent intercepts, including: 37m at 6.4g/t, 9m at 14.0g/t, 2m at 19g/t. Nokpa is centred on a high-grade WNW moderately plunging shoot. The high-grade core sits in a 200m long dilational jog created at the intersection of 3 major structures; the major Nokpa-Chegue Main shear, the Souwa shear and a third major fault infilled by late dykes. Mineralisation extends to 300m vertical depth and remains open. 2019 drilling will chase the high-grade plunge of the core Nokpa lode and similar structural analogs within the proximal district.

Drilling has successfully connected both Chegue Main and Nopka, along a 2.4km strike mineralised structure. Drilling started and will be ongoing in 2019, testing the potential to close the mineral resource gap between the two defined deposits.

Similar in origin to Nokpa, Chegue South hosts a significant resource immediately south of the Nokpa-Chegue Main shear zone. Drilling and exploration in 2018 drilling solidified the high-grade shoots within the resource and extended on plunge and towards the south.

Infill drilling at Kekeda and Han satellite deposits will continue into 2019 with the objective of improving the resource confidence classification. Tchouahinin, located centrally within the resource area, 3km between Souwa and Kekeda, is a new satellite deposit. The mineralisation is currently defined along 700m strike and open in all directions. 2019 drilling will continue to develop the new Tchouahinin structural setting.

At Enioda deposit, drilling successfully bridged two smaller shoots into a coherent 2.2km long surface deposit which strikes north to south and dips 40° west. Enioda forms the southernmost section of a continuous 7km regional mineralised shear. Drilling in 2019 will continue to develop the Enioda resource on strike and down dip.

Mineral Resources, by deposit

(0.5g/t gold cut-off)

as at 31 December 2018

as at 31 December 2017

Indicated

Inferred

Indicated

Inferred

Deposits

Tonnes (Mt)

Grade (g/t)

Gold (Moz)

Tonnes (Mt)

Grade (g/t)

Gold (Moz)

Tonnes

(Mt)

Grade (g/t)

Gold (Moz)

Tonnes (Mt)

Grade (g/t)

Gold (Moz

Souwa

18.1

1.41

0.82

6.3

1.5

0.30

15.4

1.4

0.65

7.2

1.3

0.29

Nokpa

6.9

1.30

0.29

1.8

1.2

0.07

5.1

1.4

0.22

4.9

1.3

0.20

Chegue Main

5.7

1.05

0.19

1.4

0.9

0.04

2.3

1.0

0.08

2.3

0.9

0.06

Chegue South

6.8

1.31

0.29

3.4

1.2

0.13

4.6

1.4

0.2

3.6

1.1

0.12

Kekeda

4.1

1.17

0.15

1.2

1.2

0.05

2.0

1.2

0.07

2.0

1.2

0.07

Han

3.8

1.48

0.18

1.6

1.4

0.07

3.2

1.3

0.13

1.5

1.2

0.06

Tchouahinin

1.3

1.44

0.06

1.0

1.0

0.03

Enioda

3.9

1.20

0.15

2.2

1.0

0.07

3.2

0.9

0.1

Total Doropo Mineral Resources

50.5

1.31

2.13

18.99

1.25

0.76

32.55

1.3

1.35

24.9

1.2

0.9

Outside of the 6km radius mineral resource area, regional Doropo exploration focused generative geochemical surveys on Tehini 1, 2 and 3 permits, Gogo and Bouna. The most significant discovery of 2018 was the Kilosegui anomaly, a coherent 8km long gold in soils-auger anomaly with strong subjacent magnetic structure, located 35km south-west of Souwa, straddling the Tehini 1 and 2 permit boundary. Further new additional target anomalies were defined in Kalamon, Danoa and Gogo permits. First pass drilling will commence on the Kilosegui target imminently and the prioritised new targets will be drilled throughout H1 2019.

2018 Significant DrillIntercepts (0.3g/t cut-off)

TENEMENT ID

PROSPECT ID

HOLE ID

FROM (m)

TO (m)

INTERVAL (m)

GRADE (Au g/t)

KALAMON

Chegue

DPRC2103

12

27

15

8.4

KALAMON

Chegue

DPRC2105

13

22

9

9.7

KALAMON

Chegue

DPRC0913

64

66

2

38.3

KALAMON

Chegue

DPRC2139

46

57

11

5.5

KALAMON

Chegue

DPRC2116

66

71

5

10.7

KALAMON

Chegue

DPRC2054

26

41

15

3.1

KALAMON

Chegue

DPRC2344

36

39

3

12.2

KALAMON

Chegue

DPRC2069

93

97

4

6.3

KALAMON

Chegue

DPRC0920

145

148

3

5.3

DANOA

Enioda

DPRC2026

67

75

8

8.5

DANOA

Enioda

DPRC2156

21

25

4

16.1

DANOA

Enioda

DPRC2178

104

110

6

7.0

KALAMON

Han

DPDD1433

95

102

7

23.4

KALAMON

Han

DPRC2295

89

92

3

14.7

KALAMON

Hinda

DPRC2213

13

23

10

5.8

KALAMON

Kekeda

DPDD1439

45

58

13

11.2

KALAMON

Kekeda

DPRC2275

107

110

3

7.0

KALAMON

Kekeda

DPRC0983

5

8

3

6.0

KALAMON

Nokpa

DPRC2265

70

107

37

6.4

KALAMON

Nokpa

DPRC0899

37

46

9

14.0

KALAMON

Nokpa

DPRC2367

70

110

40

3.1

KALAMON

Nokpa

DPRC2263

71

111

40

2.7

KALAMON

Nokpa

DPRC2368

93

132

39

2.4

KALAMON

Nokpa

DPRC0900

49

63

14

6.4

KALAMON

Nokpa

DPRC2242

69

81

12

6.5

KALAMON

Nokpa

DPRC2241

26

36

10

6.4

KALAMON

Nokpa

DPRD1411

252

273

21

3.0

KALAMON

Nokpa

DPRC2248

114

120

6

9.4

KALAMON

Nokpa

DPRC2365

73

78

5

10.4

KALAMON

Nokpa

DPRD1409

298

313

15

3.2

KALAMON

Nokpa

DPRC2243

9

16

7

6.7

KALAMON

Nokpa

DPRC2266

114

120

6

7.4

KALAMON

Nokpa

DPRC2258

104

106

2

19.0

KALAMON

Nokpa

DPRC2365

18

21

3

12.1

KALAMON

Nokpa

DPRC2254

110

114

4

8.8

KALAMON

Nokpa

DPRC0901

47

50

3

11.2

KALAMON

Nokpa

DPDD1427

187

191

4

6.2

KALAMON

Nokpa

DPRC2242

24

26

2

11.4

KALAMON

Souwa

DPRC2413

9

27

18

10.4

KALAMON

Souwa

DPRC0891

36

61

25

3.7

KALAMON

Souwa

DPRC2089

8

11

3

30.5

KALAMON

Souwa

DPRC0893

67

84

17

3.4

KALAMON

Souwa

DPRC2426

30

34

4

8.3

KALAMON

Souwa

DPRC2424

19

22

3

8.0

KALAMON

Tchouahinin

DPRC2337

76

80

4

39.7

KALAMON

Tchouahinin

DPRC2216

41

48

7

8.1

ABCPROJECT

The ABC Project, located in northwest Côte d'Ivoire, approximately 600km west of Doropo, the Company's advanced exploration project. ABC is a greenfield exploration project, consisting of two permits, Kona and FarakoNafana, covering a 750km2 highly prospective landholding along the underexplored contact zone between the Archean and Birimian cratons. The Company has an additional four permits under application.

Geology

The LGC is characteristically 300m to 800m wide, hosting a greenschist to low amphibolite grade, Birimian volcano-sedimentary greenstone package thrusted between an earlier granitoid of Archaean age inferred from structural position to the west and a paragneiss on the east. The eastern footwall contact is a major structural and metamorphic feature and it controls the regional setting of the gold mineralisation along the corridor. The paragneiss is interpreted to be the stratigraphic continuity of the detrital sediments but at higher granulite facies.

Surface geochemistry clearly maps the core of the LGC along a 23km strike which runs axially through the Kona permit. The two main prospects, identified by the initial mapping and rock chip sampling, were subdued silicified ledges in the topography. These anomalous ridges developed into the Kona South and Kona Central Prospects. On a regional scale, mapping and remote sensing of the LGC defined a 60km structural feature.

Exploration

After the permits were granted, greenfield exploration began in early 2017 with reconnaissance mapping and initial rock chip sampling of the Kona permit area.

Geochemical sampling identified the LGC, at the time as an outcropping 12km gold mineralised structure. Further detailed fieldwork, including GAIP survey and c.5,900 metre RC drill programme was carried out in 2017, returning the first significant mineralised intercepts on some wide spaced and shallow drill sections.

In 2018, exploration activities successfully focussed on developing the Kona South prospect by RC and Diamond drilling, while extending the understanding of surface geochemistry through a c.20,000 metre auger drilling programme to cover the whole of the LGC length in the Kona permit. The auger results have highlighted the strike continuity in mineralisation, plus multiple sub parallel zones along the +23km strike of the LGC. Surface geochemistry sampling also began on the FarakoNafana permit that overlays the northern extend of the Lolosso structure.

In 2018, an 18,500 metre drill programme was completed (including c.13,400 RC metres and 5,100 diamond drill metres). Significant drill intercepts are reported quarterly as part of our detailed Quarterly Results, which can be found on the Company's website. The table at the end of this announcement shows 2018 highlight drill intercepts, including new intercepts published for Q4, clearly annotated. The primary objective of 2018 was the delivery of a maiden resource estimate for Kona South. The Kona South maiden resource stands at 650koz at 1.03 g/t Indicated category and 450koz at 0.87g/t Inferred category, at a 0.5 g/t cut off. The table below shows how the resource behaves at higher cut-offs.

as at 10 December 2018

Indicated

Inferred

Cut-off (g/t)

Tonnage (Mt)

Grade (g/t)

Gold content (Moz)

Tonnage (Mt)

Grade (g/t)

Gold content (Moz)

0.5

19.6

1.03

0.65

16

0.9

0.45

0.6

16.4

1.13

0.59

12

1.0

0.37

0.7

13.6

1.23

0.54

9

1.1

0.31

0.8

11.3

1.32

0.48

6

1.3

0.26

0.9

9.4

1.42

0.43

5

1.4

0.21

1.0

7.7

1.52

0.38

4

1.5

0.18

Beyond the Kona South and Central ridges that have been tested by some drilling, the LGC is totally virgin from any other exploration work other than the surface work (mapping, geochemistry, geophysics). Geochemistry results (auger) successfully delineated the anomalous contacts and internal plumbing of the LGC, highlighting several new resource potential targets along it.

Modelling

To support the rapidly growing resource, a detailed 4D geological modelling exercise was conducted reviewing the core logging and the regional context of the macro-structure hosting the deposits. Detailed geological interpretations were compiled from prospect mapping, satellite imagery and geophysical imagery. These district geological models were integrated with the evolving drill database to produce sophisticated resource models, based on detailed structural modelling and direct deeper plunge drill targeting.

The Kona South resource remains open in all directions and detailed 3D grade modelling indicates there are higher-grade, plunging shoots within the broad-spaced resource drilling. Additional resource quality intercepts were identified at wide spacing in Kona Central, which require closer examination, infill drilling and 3D modelling in 2019.

2019

Building on the success of 2018, exploration continues, including a 34,000 metre drill programme focussing on resource development at Kona Central and Kona South, while testing the resource extension potential between the two prospects, drill testing high priority targets along the LGC, airborne magnetic/radiometric surveying, and geochemical sampling.

2018 Significant DrillIntercepts (0.3g/t cut-off)

Drill assays received in Q4 2018 and subsequently not previously reported are highlighted with the annotation "Q4" in the final column, titled "NEW RESULTS (Q4 2018)".

TENEMENT ID

PROSPECT ID

HOLE ID

FROM (m)

TO (m)

INTERVAL (m)

GRADE (Au g/t)

NEW RESULTS (Q4 2018)

KONA

Lolosso corridor

KNDD0002

102.0

155.0

53.0

1.2

KONA

Lolosso corridor

KNDD0004

173.0

202.0

29.0

1.2

KONA

Lolosso corridor

KNDD0001

112.1

136.0

23.9

1.2

KONA

Lolosso corridor

KNDD0001

174.7

191.8

17.1

1.6

KONA

Lolosso corridor

KNDD0004

163.0

170.8

7.8

3.2

KONA

Lolosso corridor

KNRC0091

39.0

83.0

44.0

2.5

KONA

Lolosso corridor

KNRC0082

20.0

120.0

100.0

0.8

KONA

Lolosso corridor

KNRC0079

16.0

76.0

60.0

1.2

KONA

Lolosso corridor

KNRC0081

5.0

88.0

83.0

0.8

KONA

Lolosso corridor

KNDD0007

30.0

66.0

36.0

1.4

KONA

Lolosso corridor

KNRC0074

1.0

30.0

29.0

1.5

KONA

Lolosso corridor

KNRC0077

122.0

153.0

31.0

1.4

KONA

Lolosso corridor

KNRC0078

128.0

158.0

30.0

1.5

KONA

Lolosso corridor

KNDD0013

182.8

209.0

26.3

1.5

KONA

Lolosso corridor

KNRC0073

1.0

26.0

25.0

1.5

KONA

Lolosso corridor

KNRC0083

14.0

38.0

24.0

1.2

KONA

Lolosso corridor

KNRC0093

103.0

127.0

24.0

1.2

KONA

Lolosso corridor

KNRC0084

69.0

90.0

21.0

1.2

KONA

Lolosso corridor

KNDD0013

172.0

180.5

9.0

2.7

KONA

Lolosso corridor

KNRC0136

185.0

244.0

59.0

1.7

Q4

KONA

Lolosso corridor

KNRC0131

192.0

237.0

45.0

1.7

Q4

KONA

Lolosso corridor

KNDD0017

206.5

243.0

36.5

1.9

Q4

KONA

Lolosso corridor

KNDD0014

78.0

131.3

53.3

1.3

Q4

KONA

Lolosso corridor

KNRC0114

29.0

59.0

30.0

2.2

Q4

KONA

Lolosso corridor

KNRC0112

107.0

149.0

42.0

1.5

Q4

KONA

Lolosso corridor

KNDD0019

107.2

160.1

52.9

1.2

Q4

KONA

Lolosso corridor

KNRC0138

184.0

244.0

60.0

1.0

Q4

KONA

Lolosso corridor

KNRC0117

6.0

56.0

50.0

1.1

Q4

KONA

Lolosso corridor

KNRC0130

45.0

93.0

48.0

1.1

Q4

KONA

Lolosso corridor

KNDD0020

105.0

154.0

49.0

1.1

Q4

KONA

Lolosso corridor

KNRC0111

112.0

144.0

32.0

1.5

Q4

KONA

Lolosso corridor

KNRC0132

184.0

201.0

17.0

2.6

Q4

KONA

Lolosso corridor

KNRC0126

70.0

96.0

26.0

1.7

Q4

KONA

Lolosso corridor

KNRC0122

122.0

150.0

28.0

1.5

Q4

KONA

Lolosso corridor

KNRC0116

1.0

37.0

36.0

1.2

Q4

KONA

Lolosso corridor

KNRC0127

0.0

33.0

33.0

1.2

Q4

KONA

Lolosso corridor

KNRC0134

12.0

34.0

22.0

1.7

Q4

KONA

Lolosso corridor

KNRC0118

86.0

110.0

24.0

1.2

Q4

KONA

Lolosso corridor

KNRC0123

71.0

85.0

14.0

1.8

Q4

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

SOURCE: Centamin Plc




View source version on accesswire.com:
https://www.accesswire.com/535472/Centamin-PLC-Announces-Significant-Cte-dIvoire-Resource-Increase


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Centamin Plc
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.