• Montag, 22 Juli 2024
  • 20:29 Uhr Frankfurt
  • 19:29 Uhr London
  • 14:29 Uhr New York
  • 14:29 Uhr Toronto
  • 11:29 Uhr Vancouver
  • 04:29 Uhr Sydney

Granada Gold Mine Invites Investors to Meet Management at PDAC BOOTH 2738

25.02.2019  |  CNW

ROUYN-NORANDA, QC, Feb. 25, 2019 /CNW/ - Granada Gold Mine  Inc. (TSXV: GGM) (OTCPK: GBBFF) (Frankfurt: B6D) (the "Company" or "Granada") invites investors to meet management at Exhibit Booth 2738 in the Investor Exchange at PDAC 2019 to be held in Toronto on March 3-6, 2019 at the Metro Toronto Convention Centre, South Building.

Both Frank Basa, Chairman and CEO, and Eric Owens, President, look forward to meeting with existing shareholders and potential investors to discuss recent high-grade drill results, the 2019 resource update, new exploration target areas and the next steps in the development of the Granada Gold property on the prolific Cadillac Trend in Quebec.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. is continuing to develop the Granada Gold Property near Rouyn-Noranda, Quebec, in the heart of the Cadillac-Larder Lake Trend which has seen more than 100 million ounces of gold produced over the past century. The property includes the former Granada gold mine which produced more than 50,000 ounces of gold at 10 grams per tonne gold in the 1930's before a fire destroyed the surface buildings. Approximately 120,000 meters of drilling has been completed to date on the property, focused mainly on the extended LONGBARS zone which trends 2 kilometers east west over a potential 5.5 kilometers mineralized structure.

The Company is in possession of all permits required to commence the initial mining phase known as the "Rolling Start", which allows the company to mine up to 550 tonnes per day, capable of producing up to 675,000 tonnes of ore over a 3-year period of time.  Additional information is available at www.granadagoldmine.com.

"Frank J. Basa"

Frank J. Basa P. Eng.
Chief Executive Officer and Chairman

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. 

SOURCE Granada Gold Mine Inc.



Contact
Eric Owens, PGeo., President, at 416-509-5385 or eowens@granadagoldmine.com, andWayne Cheveldayoff, Corporate Communications, at 416-710-2410 or waynecheveldayoff@gmail.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Granada Gold Mine Inc.
Bergbau
A2G9M7
CA38503H2037

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.