• Freitag, 22 November 2024
  • 14:16 Uhr Frankfurt
  • 13:16 Uhr London
  • 08:16 Uhr New York
  • 08:16 Uhr Toronto
  • 05:16 Uhr Vancouver
  • 00:16 Uhr Sydney

Pre-Concentration Tests of Low-Grade Gold Mineralization at Granada Gold Mine Shows Potential to Deliver Higher Grade Concentrate

25.04.2019  |  CNW

ROUYN-NORANDA, QC, April 25, 2019 /CNW/ - Granada Gold Mine (TSX-V: GGM) ("Granada Gold" "GGM" or the "Company") is pleased to report on the latest encouraging results from a new two-stage gravity concentration process. Low grade gold mineralization of 1.01 g/t was upgraded in the test to 67.99 g/t.

Mr. Frank Basa, Chairman and CEO of Granada Gold, stated, "We are seeking ways to reduce costs, and therefore risks, of any possible future production decision. These early-stage test results suggest this technique has the potential of increasing the grade of mineralized material prior to shipping for final processing, thereby lowering tonnage shipped. Further testwork will be undertaken to optimize base metal and gold grades, and recoveries."

The gravity pre-concentration study, originally reported by GGM in a press release dated March 18, 2019, was conducted at the pilot plant of Canada Cobalt Works (TSX-V: CCW), in Gowganda, Ontario.

In this test, a 120-kilogram sample of low-grade mineralized rock from the Granada Gold Mine waste dump was processed by conventional gravity concentration techniques over two stages. The first concentrates (Conc. 1 in table below) were analyzed for gold, silver, cobalt, nickel, and copper, and then fed back through the gravity circuit to form the second concentrate (Conc. 2).

TABLE 1. Results of Gravity Separation of GGM Waste Rock


Au (g/t)

Ag (g/t)

Co (%)

Ni (%)

Cu (%)

Head Assay

1.01

0.5

.004

.009

.013

Conc. 1

12.04

15.30

.014

.015

.010

Conc. 2

67.99

62.80

.069

.037

.122

 

In addition, planning for summer exploration activities is underway, with the aim of drill-testing targets in close proximity to the pit-constrained gold resources as well as identifying new targets via surface geologic work.

Qualified Person

The technical information in this news release was prepared under the supervision of Frank J. Basa, P.Eng., Granada Gold Mine's Chairman and Chief Executive Officer, who is a member of Professional Engineers Ontario and a qualified person in accordance with National Instrument 43-101.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. continues to develop the Granada Gold Property near Rouyn-Noranda, Quebec. Approximately 120,000 meters of drilling has been completed to date on the property, focused mainly on the extended LONG Bars zone which trends 2 kilometers east-west over a potential 5.5 kilometers of mineralized structure. The highly prolific Cadillac Break, the source of more than 75 million plus ounces of gold production in the past century, cuts through the north part of the Granada property.

The Company is in possession of a mining permit required to commence the initial mining phase, known as the "Rolling Start", which allows the company to mine up to 550 tonnes per day. Additional information is available at www.granadagoldmine.com.

"Frank J. Basa"

Frank J. Basa P. Eng.
Chief Executive Officer and Chairman

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE Granada Gold Mine Inc.



Contact
Eric Owens, PGeo, President, 416-509-5385, eowens@granadagoldmine.com or Wayne Cheveldayoff, Corporate Communications, 416-710-2410, waynecheveldayoff@gmail.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Granada Gold Mine Inc.
Bergbau
A2G9M7
CA38503H2037
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.