• Sonntag, 22 Dezember 2024
  • 16:23 Uhr Frankfurt
  • 15:23 Uhr London
  • 10:23 Uhr New York
  • 10:23 Uhr Toronto
  • 07:23 Uhr Vancouver
  • 02:23 Uhr Sydney

Melkior Summer/2019 Exploration Program Begins in Maseres

04.06.2019  |  The Newswire
Timmins, June 4, 2019 - wp] ("Melkior") (TSXV:MKR) is pleased to announce that it has renewed its drill permit for the Maseres project in the Urban-Barry Camp. The renewed permit is valid until March 31, 2020.

Melkior confirms that Geologica Groupe-Conseil Inc. has arrived on site to commence phase 1 of the summer exploration program. The summer program will be oriented towards exploration for potential auriferous structural controls and base metals targets. A summary of the 3 phases planned for the summer program can be viewed at the link below:

http://www.melkior.com/melkior-contracts-consulting-firm-for-maseres/

Jim Deluce, CEO of Melkior remarks, "We are glad to have the drilling permit renewed until March 2020. With the summer program commencing this week, any high priority targets identified will be evaluated for future drilling."

About the Maseres Project:

Melkior has advanced the Maseres Project consistently and aggressively since staking in March 2017. The 2,170-line kilometer GEOTECH VTEM plus time-domain helicopter-borne magnetometer and EM survey was completed in March 2018. Detailed soil sampling over the intriguing priority EM trends was undertaken through 2017 and 2018. To continue to advance the Maseres Project it was necessary to establish EM anomaly causation. The most prominent and accessible EM trend was selected as a focus area where a line cutting grid was established and ground geophysics conducted in November and December 2018. This ground work established the location of the EM anomalies with sufficient accuracy to permit drill targeting and the completion of the First Phase drilling campaign.

This maiden drill program established that the priority EM anomalies reflect the presence of VMS stratigraphy on the Maseres Project along the 2.3 km of the drilled trend. Melkior has over 20 km of additional strike length to investigate along the surface. Maximum assays for the main VMS elements were 181.0 g/t Ag, 0.14 % Cu, 0.69 Pb, 1.74 % Zn, 0.309 ppm Au.

ON BEHALF OF THE BOARD

Keith James Deluce, CEO

For more information, please contact:

Melkior Resources Inc.

E-mail: info@melkior.com

Tel: 705-267-4000

The reader is invited to visit Melkior's web site www.melkior.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Copyright (c) 2019 TheNewswire - All rights reserved.


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Melkior Resources Inc.
Bergbau
A2P0Z5
CA58549W3030
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.